The administrator of a Power 595 server is required to concurrently host LPARs for two different customers. Both customers’ LPARs have the same VLAN ID and subnet range, but their traffic must be isolated from each other. Which feature within the system would provide this functionality?()
第1题:
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
第2题:
An administrator wants to host several LPARs on a JS23 Blade server. To achieve this what additional management software is required?()
第3题:
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
第4题:
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
第5题:
When configuring Shared Ethernet Adapter (SEA) failover between two VIO servers, which of the following attributes must have a different value on both VIO servers?()
第6题:
Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology. Which of the following best describes the network requirements?()
第7题:
Create a single Web site that contains both Web applications.
Create two Web sites, one for each Web application.
Assign both Web applications to the same application pool.
Assign each Web application to its own application pool.
第8题:
The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions and has the lowest partitioning overhead.
第9题:
Physically the voice network and the data network are separate.
The voice traffic will normally be on a different IP subnet than will the data traffic.
End user intervention is necessary to place the phone into the proper VLAN.
The same security policy should be implemented for both voice and data traffic.
The data VLAN must be configured as the native VLAN.
第10题:
HA Mode
Trunk priority
Control Channel
Default VLAN ID
第11题:
The service IP addresses must be on a separate subnet and VLAN.
The non-service and service IP addresses must be on the same subnet and on the same VLAN.
All interfaces on a node must be in different subnets. All subnets must be on the same VLAN.
One non-service and one service IP address must be on the same logical subnet. All interfaces must be on the same VLAN.
第12题:
Which feature of the IBM p5 servers enables customers to be confident that data within two distinct partitions on the server will be isolated?()
第13题:
Best practices would have no single point of failure between mirrored resources. In setting up virtual, internal boot disks for two client LPARs, how would this be accomplished?()
第14题:
Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
第15题:
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()
第16题:
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()
第17题:
POWER Hypervisor
Virtual LAN
POWER5 processor
Redundant Power and Cooling
第18题:
Each end of the trunk line must be set to IEEE 802.1E encapsulation.
The VTP management domain name of both switches must be set the same.
All ports on both the switches must be set as access port.
One of the two switches must be configured as a VTP server.
A rollover cable is required to connect the two switches together.
A router must be used to forward VTP traffic between VLANs.
第19题:
802.1Q
Virtual switch
Logical Host Ethernet (LHE) Adapter
Shared Ethernet Adapter (SEA) Trunking
第20题:
A VIO server requires a dedicated LHEA port.
There is a limit of 32 LPARs per virtual LAN.
Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
第21题:
Have one VIO server with striped disks for all LPARs
Have one VIO server with mirrored disks for all LPARs
Have two VIO servers with each LPAR accessing both VIO servers
Have two VIO servers with each LPAR accessing a different VIO server