A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()
第1题:
列车技术检查站 train technical inspection station
第2题:
A customer recently installed new a SAN with an IBM System Storage DS8700 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()
第3题:
After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()
第4题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第5题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第6题:
An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()
第7题:
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()
第8题:
What is the correct stage in the sales process for a Pre-Sales Technical & Delivery Assessment (TDA)? ()
第9题:
The technical support specialist has completed a UNIX course at college.
The technical specialist has supported several similar projects and has earned an IBM AIX certification.
The technical support specialist’s company sells $3M of UNIX computer systems every year.
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
第10题:
第11题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第12题:
An account team proposal review
An installation planning meeting
A solution design development methodology
A technical inspection of a completed solution design
第13题:
After visiting several customers, the pSeries technical specialist returns to the office late in the day and makes a list of the various customer requests. The specialist decided to complete at least one task before leaving for the day. Which of the following is most important to complete immediately?()
第14题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第15题:
A customer recently installed new SAN with an IBM System Storage DS8300 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()
第16题:
When performing an expert level pre-install Technical & Delivery Assessment (TDA), which team member has the responsibility for assigning, tracking and updating the completion of action items during the TDA process?()
第17题:
What is the primary purpose of the Technical and Delivery Assessment (TDA)?()
第18题:
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
第19题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第20题:
ensuring network integrity
controlling financial factors
finding a solution that simplifies setup and operation
understanding customer needs
saving budget for future quarters
providing offeringsthat are modular and can be built opon
第21题:
Verification of the expected performance of the new solution.
A document used by IBM manufacturing to build and ship the system solution.
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
A list of actions that are recommended to reduce risk and create a successful implementation.
第22题:
The Delivery Leader
The Opportunity Owner
The Solution Designer
The Subject Matter Expert
第23题:
Before the first solution design meeting with the customer
After the solution design proposal is submitted to manufacturing for review
Once the customer has supplied the solution design specifications to the sales team
After the solution design is completed and before the proposal is submitted to the customer