A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()
第1题:
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()
第2题:
A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage. Which of the following arguments can the Sales Specialist present to best position IBM? ()
第3题:
A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()
第4题:
The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()
第5题:
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
第6题:
Is there a need for a PKI Management System?
Is there a need for end-to-end encryption?
Do they currently have a Kerberos domain in place?
Which clients are installed on their desktops -- SSH, Telnet or both?
第7题:
A minimum of two HBAs; the customer will need to download SDD
A minimum of four HBAs; the customer will need to download SDD
A minimum of two HBAs; the customer will need to configure MPIO
A minimum of four HBAs; the customer will need to configure MPIO
第8题:
Global Copy
Sync Mirror
Metro Mirror
TPC for Replication
第9题:
Virtual Gateway
Real-IP Gateway
NAT Gateway
IP-IP Gateway
第10题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第11题:
A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment. Which of the following questions would most impact the memory configuration?()
第12题:
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()
第13题:
A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()
第14题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第15题:
Deployment of Business Ready Teleworker with VoIP is not recommended.
The customer’s existing PBX must first be replaced with Cisco IP Telephony solution.
Business Ready Teleworker and Cisco IP Telephony can be deployed in parallel to the existing PBX, integrating the two with trunking.
Deployment is recommended only for full-time Teleworkers who have no other corporate phone.
第16题:
Has there been any recent loss of data?
How many tape drives are in the Library?
What tape technology is currently being used?
What software is being used for restoring the data?
第17题:
8 drive sets of 300 GB drives
4 drive sets of 300 GB drives
14 drive sets of 146 GB drives
18 drive sets of 146 GB drives
第18题:
I/T services and education to help with the implementation of the hardware and software
A Supportline specialist to work directly with the customer to manage any issues that arise
The services required to move the currently installed applications from the competitor’s systems to the IBM systems
A slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution