You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the

题目

You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the scheduled task? ()

  • A、Devcon.exe and Poolmon.exe
  • B、Ntbackup.exe and Devcon.exe
  • C、Ntbackup.exe and Rsm.exe
  • D、Rsm.exe and Poolmon.exe

相似考题
更多“You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the s”相关问题
  • 第1题:

    . You have a server that runs Windows Server 2003 Service Pack 2 (SP2).You back up the files on the server by using the following schedule:·Full backup every Sunday·Differential backup at 01:00 every Monday to FridayYou want to restore the version of a file stored on the server at the start of the business day on Wednesday. You are unsure when the file was last modified.You need to restore the appropriate version of the file by using the minimum number of tapes.Which backup jobs should you review to locate the correct version of the file? ()

    A. the differential backup from Tuesday

    B. the differential backup from Wednesday and then the full backup from Sunday

    C. the full backup from Sunday

    D. the full backup from Sunday and then all other backups


    参考答案:B

  • 第2题:

    You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). On Server1, you have the following backup schedule: ·Normal backups every Saturday at 01:00 Differential backups every weekday at 02:00, except on Saturday You need to perform a complete manual backup of Server1 on Tuesday. The backup must not change which files are backed up during the next scheduled backup. Which type of backup should you perform? ()

    • A、copy
    • B、daily
    • C、incremental
    • D、normal

    正确答案:A

  • 第3题:

    You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You perform a normal backup of Server1 every Saturday. You need to implement a backup strategy for Server1 to meet the following requirements: ·Minimize the time required to back up files. ·On weekdays, back up files that have changed since the last backup.? Which type of backup should you perform on weekdays? ()

    • A、copy
    • B、daily
    • C、differential
    • D、incremental

    正确答案:D

  • 第4题:

    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the scheduled task? ()

    • A、Devcon.exe and Poolmon.exe
    • B、Ntbackup.exe and Devcon.exe
    • C、Ntbackup.exe and Rsm.exe
    • D、Rsm.exe and Poolmon.exe

    正确答案:C

  • 第5题:

    You have a file server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You need to use Windows Backup to meet the following requirements: ·Minimize the number of scheduled backup jobs. ·Perform a scheduled normal backup to disk every Friday. ·Perform a scheduled normal backup to tape every Friday. ·Perform scheduled differential backups to tape every Monday, Tuesday, Wednesday, and Thursday. How many scheduled jobs should you create from Windows Backup?()

    • A、one
    • B、two
    • C、three
    • D、six

    正确答案:C

  • 第6题:

    . You have a server that runs Windows Server 2003 Service Pack 2 (SP2). You back up the files on the server by using the following schedule: ·Full backup every Sunday ·Differential backup at 01:00 every Monday to Friday You want to restore the version of a file stored on the server at the start of the business day on Wednesday. You are unsure when the file was last modified. You need to restore the appropriate version of the file by using the minimum number of tapes. Which backup jobs should you review to locate the correct version of the file? ()

    • A、the differential backup from Tuesday
    • B、the differential backup from Wednesday and then the full backup from Sunday
    • C、the full backup from Sunday
    • D、the full backup from Sunday and then all other backups

    正确答案:B

  • 第7题:

    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). You create an Automated System Recovery (ASR) backup of the server. You restart the server and receive a critical error. You need to restore the server by using ASR. What should you do first? ()

    • A、Start the computer by using Safe mode.
    • B、Start the server by using the ASR floppy disk.
    • C、Start the computer by using the Last Known Good Configuration option.
    • D、Start the server by using the Windows Server 2003 SP2 installation media.

    正确答案:D

  • 第8题:

    You have a WINS server that runs Windows Server 2003 Service Pack 2 (SP2). You need to schedule a backup of the WINS database whenever the WINS service stops. What should you do? ()

    • A、Create a scheduled task that runs Wins.exe.
    • B、Create a scheduled task that runs Netsh.exe.
    • C、Modify the General options from the WINS snap-in.
    • D、Schedule a system state backup by using Windows Backup

    正确答案:C

  • 第9题:

    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). You back up the shared folders on the servers by using the following schedule: ·Full backup at 01:00 every Sunday ·Incremental backup at 01:00 every Monday to Friday On a Wednesday afternoon, the hard disk drive that contains the shared folders fails. You need to restore the latest version of all files in the shared folders. The solution must use as few backup tapes as possible. What should you restore?()

    • A、the files from the full backup
    • B、the files from the full backup and from the Monday, Tuesday, and Wednesday backups
    • C、the files from the full backup and from the Wednesday backup
    • D、the files from the Wednesday backup

    正确答案:B

  • 第10题:

    单选题
    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the scheduled task? ()
    A

    Devcon.exe and Poolmon.exe

    B

    Ntbackup.exe and Devcon.exe

    C

    Ntbackup.exe and Rsm.exe

    D

    Rsm.exe and Poolmon.exe


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    You have a WINS server that runs Windows Server 2003 Service Pack 2 (SP2). You need to schedule a backup of the WINS database whenever the WINS service stops. What should you do? ()
    A

    Create a scheduled task that runs Wins.exe.

    B

    Create a scheduled task that runs Netsh.exe.

    C

    Modify the General options from the WINS snap-in.

    D

    Schedule a system state backup by using Windows Backup


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server contains one volume. You install Certificate Services. You need to back up the Certificates Services database by using the minimum amount of storage space. Which tool should you use? ()
    A

    Certification Authority snap-in

    B

    Certificates snap-in

    C

    Certificate Templates snap-in

    D

    Windows Backup


    正确答案: B
    解析: 暂无解析

  • 第13题:

    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server is configured as shown in the following table.You need to ensure that you can restore the server and all its data in the event of a complete system failure.You perform an Automated System Recovery (ASR) backup.What else should you backup? ()

    A.volume C

    B.volume D

    C.volume E

    D.the system state


    参考答案:C

  • 第14题:

    You manage a server that runs Windows Server 2008. The Windows Backup and Restore utility is installed on the server.You need to create a full backup of all system state data to the DVD drive (R: drive) on the server.Which command should you run on the server?()

    • A、Wbadmin enable backup -addtarget:R: /quiet
    • B、Wbadmin enable backup  addtarget:C:// /quiet
    • C、Wbadmin start backup  allCritical  backuptarget:C:///quiet
    • D、Wbadmin start backup  allCritical  backuptarget:R:/quiet

    正确答案:D

  • 第15题:

    You have a file server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You use Windows Backup to back up Server1. You need to view all the backup jobs that are scheduled to run on Server1. What should you do? ()

    • A、From Administrative Tools, run Services.
    • B、From Administrative Tools, run File Server Manager.
    • C、From Windows System Tools, run Scheduled Tasks.
    • D、From Windows System Tools, run System Information.

    正确答案:C

  • 第16题:

    You have a file server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You need to implement a backup schedule on Server1 to meet the following requirements: ·Everyday, back up all files and folders to disk. ·Every Friday, back up all files and folders to tape. ·Every Sunday, Tuesday, and Thursday, back up only the files and folders that have changed since the previous Friday’s backup to tape. Which backup jobs should you create? ()

    • A、·a normal backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday, and Thursday
    • B、·a normal backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday, and Thursday
    • C、·a copy backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday and, Thursday
    • D、·a copy backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday and, Thursday

    正确答案:C

  • 第17题:

    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). An incremental backup runs every weekday at 01:00. On Friday, you examine the Windows Backup log and discover that the last entry in the log is one week old. You need to identify the problem that prevents the backup from running. What should you do? ()

    • A、From Scheduled Tasks, examine the log.
    • B、From Event Viewer, examine the system log.
    • C、From Windows Backup, enable detailed logging and then perform a manual backup.
    • D、From Windows Explorer, examine the files in the %systemroot%/system32/LogFiles folder.

    正确答案:A

  • 第18题:

    You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). On Server1, you have the following backup schedule: ·Normal backups every Saturday at 01:00 ·Differential backups every weekday at 02:00, except on Saturday You need to perform a complete manual backup of Server1 on Tuesday. The backup must not change which files are backed up during the next scheduled backup. Which type of backup should you perform? ()

    • A、copy
    • B、daily
    • C、incremental
    • D、normal

    正确答案:A

  • 第19题:

    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server contains one volume. You install Certificate Services. You need to back up the Certificates Services database by using the minimum amount of storage space. Which tool should you use? ()

    • A、Certification Authority snap-in
    • B、Certificates snap-in
    • C、Certificate Templates snap-in
    • D、Windows Backup

    正确答案:A

  • 第20题:

    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). You back up the shared folders on the servers by using the following schedule: ·Full backup at 01:00 every Sunday ·Incremental backup at 01:00 every Monday to Friday On a Wednesday afternoon, the hard disk drive that contains the shared folders fails. You need to restore the latest version of all files in the shared folders. The solution must use as few backup tapes as possible. What should you restore? ()

    • A、the files from the full backup
    • B、the files from the full backup and from the Monday, Tuesday, and Wednesday backups
    • C、the files from the full backup and from the Wednesday backup
    • D、the files from the Wednesday backup

    正确答案:B

  • 第21题:

    单选题
    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the scheduled task? ()
    A

    Devcon.exe and Poolmon.exe

    B

    Ntbackup.exe and Devcon.exe

    C

    Ntbackup.exe and Rsm.exe

    D

    Rsm.exe and Poolmon.exe


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    You have a file server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2).You need to implement a backup schedule on Server1 to meet the following requirements:·Everyday, back up all files and folders to disk.·Every Friday, back up all files and folders to tape.·Every Sunday, Tuesday, and Thursday, back up only the files and folders that have changed since theprevious Friday’s backup to tape.Which backup jobs should you create?()
    A

    ·a normal backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday, and Thursday

    B

    ·a normal backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday, and Thursday

    C

    ·a copy backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday and, Thursday

    D

    ·a copy backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday and, Thursday


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the scheduled task? ()
    A

    Devcon.exe and Poolmon.exe

    B

    Ntbackup.exe and Devcon.exe

    C

    Ntbackup.exe and Rsm.exe

    D

    Rsm.exe and Poolmon.exe


    正确答案: C
    解析: 暂无解析