Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and

题目

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

  • A、hardware and software specification
  • B、system performance specification
  • C、formal requirements definition
  • D、general problem statement

相似考题
参考答案和解析
正确答案:C
更多“Many of the activities performed”相关问题
  • 第1题:

    ● Scope Management:

    A entails managing the project's work content.

    B is a subset of configuration management and as such is performed by CM specialists.

    C is concerned with naming all activities performed, the end products which results and the resources consumed.

    D is not a concern of the project manager.

    E None of the above.


    正确答案:C

  • 第2题:

    Define Activities is the process of identifying the specific actions to be performed to produce the (71).

    A.project elements

    B.work drafts

    C.work package

    D.project deliverables


    正确答案:D
    解析:活动定义过程识别是为了生产项目的可交付物而必须执行的具体活动。

  • 第3题:

    Which of the following statement is true?

    A. Mark played an active part in community activities.

    B. the city councilwoman was responsible for the decrease of life quality.

    C. people were encouraged to give advice to solve these city problems.

    D. many people were discouraged by the many problems facing them.


    正确答案:C

    32.答案为C  从第一段People were supposed to suggest solutions to the councilwoman可知政府官员鼓励人们对城市的管理提意见。

  • 第4题:

    Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (4)for process and data of current system, the deliverable from this phase also includes the ( )for the proposed system.

    (4)应选( )。

    A. logical moD.els
    B. physical moD.els
    C. D.esign moD.els
    D.. implementation moD.els

    答案:A
    解析:
    本题考查的是初步调研的相关知识,这个考点可以做个了解。经常考

    初步调研阶段的许多活动在分析阶段仍然要继续,而且会比以前更深入许多。在分析阶段,分析师必须要完全清楚最终蓝图并且掌握充分的业务环境和目前系统的商业环境,以使一个有效的解决方案被提出并且执行。除了当前系统的过程和数据的逻辑模型,这一阶段的产出物还包括建议系统的正式需求定义。

    74、A、逻辑模型,B、物理模型,C、设计模型,D、执行模型

  • 第5题:

    Many of the activities performed during the preliminary investigation are still being conducted in ( ), but in much greater depth than before.

    A.analysis phase
    B.design phase
    C.implementation phase
    D.maintenance phase

    答案:A
    解析:
    翻译:在初步调研时完成的许多活动在分析阶段还要继续进行,只是比以前更深入地去做。
    A.分析阶段 B.设计阶段 C.实施阶段 D.维护阶段

  • 第6题:

    You are maintaining the SALES database of a company. You have never backed up the USERS tablespace that is currently offline. On Sunday, you issued the following commands:   CONFIGURE DEFAULT DEVICE TYPE TO sbt;   CONFIGURE BACKUP OPTIMIZATION ON;   CONFIGURE RETENTION POLICY TO REDUNDANCY 3;   From Monday to Saturday, you performed the following actions:   Day                         Action  Monday                BACKUP DATABASE  Tuesday                BACKUP DATABASE  Wednesday              BACKUP DATABASE  Thursday               BACKUP DATABASE  Friday                 BACKUP DATABASE  Saturday               BACKUP DATABASE  How many times will the backup of the USERS tablespace be performed?()

    • A、 The backup will not be performed at all.
    • B、 three times
    • C、 four times
    • D、 six times

    正确答案:C

  • 第7题:

    Identify the activities performed as part of the Automatic SQL Tuning process in the maintenance window?()

    • A、 generating the SQL profile
    • B、 testing and accepting the SQL profile
    • C、 generating a list of candidate SQLs for tuning
    • D、 adding tuned SQL plans into the SQL plan baseline
    • E、 tuning each SQL statement in the order of importance 
    • F、 generating baselines that include candidate SQLs for tuning

    正确答案:A,B,C,E

  • 第8题:

    单选题
    Define Activities is the process ofidentifying the specific actions to be performed toproduce the()
    A

    projectelements

    B

    work drafts

    C

    workpackage

    D

    projectdeliverables


    正确答案: D
    解析: 该题的关键词为"Define Activities、identifying the specific actions",其语句结构为"Define Activities(主语)is(谓语)the process ofidentifying the specific actions to beperformed to produce the_ ",含义为"活动定义是为了生成什么而执行所识别出的特定活动",这是考察进度管理知识领域中的活动定义的概念,活动定义是为了生成交付物或子交付物而执行的活动,因此选择选项D。

  • 第9题:

    多选题
    Identify the activities performed as part of the Automatic SQL Tuning process in the maintenance window?()
    A

    generating the SQL profile

    B

    testing and accepting the SQL profile

    C

    generating a list of candidate SQLs for tuning

    D

    adding tuned SQL plans into the SQL plan baseline

    E

    tuning each SQL statement in the order of importance

    F

    generating baselines that include candidate SQLs for tuning


    正确答案: A,E
    解析: 暂无解析

  • 第10题:

    单选题
    A full backup is performed every Sunday and incremental backups are performed daily Monday through Saturday. How many tapes would be required to perform a full restore if a complete failure occurred on Thursday before the incremental backup?()
    A

    2

    B

    3

    C

    4

    D

    5


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A full backup is performed every Sunday and incremental backups are performed daily Monday through Saturday.  How many tapes would be required to perform a full restore if a complete failure occurred on Thursday before the incremental backup?()
    A

     2

    B

     3

    C

     4

    D

     5


    正确答案: C
    解析: 暂无解析

  • 第12题:

    ● Increasing resources on the critical path activities may not always shorten the length of the project because:

    A Certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).

    B Safety, OSHA and EPA may have placed restrictions on the number of people used on certain activities or in the physical location of the project.

    C The skill level of the added resources might not be appropriate for the activities to be performed.

    D Adding more resources may create additional work and produce inefficiencies (i.e., additional people may need training and supervision.)

    E All of the above.


    正确答案:E

  • 第13题:

    ● Define Activities is the process of identifying the specific actions tobe performed to produce the (71).

    (71)

    A. project elements

    B. work drafts

    C. work package

    D. project deliverables


    正确答案:D

  • 第14题:

    Many of the activities performed during the preliminary investigation are still being conducted in(71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the(72) and must develop enough knowledge about the(73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(74) for process and data of current system, the deliverable from this phase also includes the(75) for the proposed system.

    A.analysis phase

    B.design phase

    C.implementation phase

    D.maintenance phase


    正确答案:A
    解析:初始调查阶段的许多活动仍然会在分析阶段进行,但会比前面更为深入。在这个阶段,分析师必须认识到根本性问题并且必须获取到足够的关于业务环境和现有系统的知识,以便提出和实现一种有效的解决方案。除了现有系统过程与数据的逻辑模型外,这一阶段的交付品还包括了所建议系统的形式化需求定义。

  • 第15题:

    Many of the activities performed during the preliminary investigation are still being conducted in ____, but in much greater depth than before.

    A.analysis phase
    B.design phase
    C.implementation phase
    D.maintenance phase

    答案:A
    解析:

  • 第16题:

    A full backup is performed every Sunday and incremental backups are performed daily Monday through Saturday.  How many tapes would be required to perform a full restore if a complete failure occurred on Thursday before the incremental backup?()

    • A、 2
    • B、 3
    • C、 4
    • D、 5

    正确答案:C

  • 第17题:

    Identify the activities performed as part of the Automatic SQL Tuning process in the maintenance window?()

    • A、generating the SQL profile
    • B、testing and accepting the SQL profile
    • C、generating a list of candidate SQLs for tuning
    • D、adding tuned SQL plans into the SQL plan baseline
    • E、tuning each SQL statement in the order of importance
    • F、generating baselines that include candidate SQLs for tuning

    正确答案:A,B,C,E

  • 第18题:

    多选题
    Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()
    A

    identifying and assessing customer business requirements

    B

    documenting and categorizing customer business requirements in terms of performance, availability, capacity and security

    C

    producing a documented technology strategy

    D

    creating a bill of materials

    E

    presenting documented business requirements to a customer and having the customer validate them

    F

    completing a site survey


    正确答案: F,D
    解析: 暂无解析

  • 第19题:

    单选题
    Which of the following is NOT mentioned as a quality of email?
    A

    It is a convenient communication tool.

    B

    It allows conversations at different times.

    C

    It is as easy to email a message to many people as to only one.

    D

    It helps control social activities.


    正确答案: D
    解析:
    关于电子邮件的性质,录音中提到“Email enables people to maintain more relationships easily because it is convenient as a communication tool...”,(电子邮件使人们易于维持更多的关系因为作为交流工具它很方便…),所以A项正确;The nature of email is such that people could carry on conversations at different times and at their leisure(电子邮件的本质是人们可以在不同的时间和在空闲时间进行谈话),所以B项也正确;it is almost as easy to email a message to many people as it is to email to only one(给许多人发电子邮件几乎和只给一个人发电子邮件一样简单),C项也正确;只有D项的没有在文中被提及。

  • 第20题:

    单选题
    While planning to manage more than one database in your system, you perform the following activities:  1. Organize different categories of files into independent subdirectories.  2. Use consistent naming convention for database files.  3. Separate administrative information pertaining to each database.  Which option corresponds to the type of activities performed by you?()
    A

    Oracle Managed Files

    B

    Oracle Grid Architecture

    C

    Optimal Flexible Architecture

    D

    Oracle database architecture


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
    A

    logical models 

    B

    physical models 

    C

    design models 

    D

    implementation models


    正确答案: C
    解析: 解析: 初步调研阶段的许多活动在分析阶段仍然要做,但是会比以前更深入地做。在分析阶段,分析师一定要完全清楚最终蓝图并且开发出充分的关于业务环境知识和目前系统的知识以使一个有效的解决方案被提交和实施。除了当前系统的过程和数据的逻辑模型,这一阶段的产出物还包括建议系统的正式需求定义。 参考答案:4:A

  • 第22题:

    单选题
    In a new installation of Oracle Database 11g, you perform these activities: 1. Organize software and data on different subdirectories to avoid poor performance. 2. Use consistent naming conventions for database files. 3. Separate administrative information pertaining to the database in different directories.  Which optioncorresponds to the type of activities you performed()
    A

    Oracle Managed Files

    B

    Oracle Grid Architecture

    C

    Optimal Flexible Architecture

    D

    Oracle database architecture

    E

    Automatic Storage Management


    正确答案: D
    解析: 暂无解析