更多“Which of the following are VLAN ”相关问题
  • 第1题:

    A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()

    A. The VLAN must be created

    B. The VLAN must be named

    C. An IP address and subnet mask must be configured for the new VLAN

    D. The desired ports must be added to the new VLAN

    E. The VLAN must be added to the existing VTP Domain


    参考答案:A, B, D

  • 第2题:

    Which of the following steps are necessary in order to add a new VLAN to a switched network?()

    • A、Create the VLAN.
    • B、Name the VLAN.
    • C、Configure an IP address for the VLAN.
    • D、Add the desired ports to the new VLAN.
    • E、Add the VLAN to the VTP domain.

    正确答案:A,B,D

  • 第3题:

    A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()

    • A、The VLAN must be created
    • B、The VLAN must be named
    • C、An IP address and subnet mask must be configured for the new VLAN
    • D、The desired ports must be added to the new VLAN
    • E、The VLAN must be added to the existing VTP Domain

    正确答案:A,B,D

  • 第4题:

    You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()

    • A、The TESTKING VLAN must be created.
    • B、The desired ports must be added to the new TESTKING VLAN.
    • C、The TESTKING VLAN must be added to all of the domains.
    • D、The TESTKING VLAN must be named.
    • E、An IP address must be configured for the TESTKING VLAN.
    • F、None of the above. VLAN creations are automatic.

    正确答案:A,B,D

  • 第5题:

    Which two of these are characteristics of the 802.1Q protocol?()

    • A、it is a layer 2 messaging protocol which maintains vlan configurations across network.
    • B、it includes an 8-bit field which specifies the priority of a frame.
    • C、it is used exclusively for tagging vlan frames and dose not address network reconvergence following switched network topology changes.
    • D、it modifies the 802.3 frame header,and thus requires that the FCS be recomputed.
    • E、it is a trunking protocol capable of carring untagged frames.

    正确答案:D,E

  • 第6题:

    Which of the following server types allows resolution of domain names to IP addresses?()

    • A、DHCP server
    • B、DNS server
    • C、Web server
    • D、VLAN server

    正确答案:B

  • 第7题:

    Which of the following protocols would be used in order to log into a router to configure a VLAN?()

    • A、RDP
    • B、SMTP
    • C、TELNET
    • D、FTP

    正确答案:C

  • 第8题:

    Which of the following allows the user to have two separate Ethernet networks share the same network adapter?()

    • A、VLAN tags
    • B、EtherChannel
    • C、Virtual Ethernet
    • D、Shared Ethernet Adapter

    正确答案:A

  • 第9题:

    多选题
    You are the network administrator tasked with designing a switching solution for the Company  network.  Which of the following statements describing trunk links are INCORRECT?()
    A

    The trunk link belongs to a specific VLAN.

    B

    Multiple trunk links are used to connect multiple end user devices.

    C

    A trunk link only supports native VLAN.

    D

    Trunk links use 802.10 to identify a VLAN.

    E

    The native VLAN of the trunk link is the VLAN that the trunk uses for untagged packets.


    正确答案: A,B,C,D
    解析: 暂无解析

  • 第10题:

    多选题
    Which of the following are VLAN frame encapsulation types that may be configured on a Catalyst switch?()
    A

    VTP

    B

    ISL

    C

    CDP

    D

    802.1Q

    E

    802.1p

    F

    LLC


    正确答案: E,F
    解析: 暂无解析

  • 第11题:

    多选题
    When a switch port is used as a VLAN trunk, which of the following trunk modes are valid?()
    A

    Blocking

    B

    Auto

    C

    Desirable

    D

    On

    E

    Transparent

    F

    Learning


    正确答案: C,A
    解析: 暂无解析

  • 第12题:

    多选题
    A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()
    A

    The VLAN must be created

    B

    The VLAN must be named

    C

    An IP address and subnet mask must be configured for the new VLAN

    D

    The desired ports must be added to the new VLAN

    E

    The VLAN must be added to the existing VTP Domain


    正确答案: E,D
    解析: 暂无解析

  • 第13题:

    Which of the following steps are necessary in order to add a new VLAN to a switched network?()

    A. Create the VLAN.

    B. Name the VLAN.

    C. Configure an IP address for the VLAN.

    D. Add the desired ports to the new VLAN.

    E. Add the VLAN to the VTP domain.


    参考答案:A, B, D

  • 第14题:

    Which of the following could be used to provide a Layer 3 data path between separate VLANs?()

    • A、 VLAN trunking
    • B、 An external router
    • C、 An internal route processor
    • D、 VLAN capable bridge
    • E、 EtherChannel

    正确答案:B,C

  • 第15题:

    Which of the following is not information provided from an IP phone to a Catalyst switch using  CDP?()

    • A、 device PoE requirements
    • B、 device IP address
    • C、 device voice VLAN ID
    • D、 device platform

    正确答案:C

  • 第16题:

    Which three of the following are organizational objectives that should be addressed when developing a new VLAN implementation plan? ()

    • A、network management
    • B、improving QoS
    • C、determining budget
    • D、reducing costs
    • E、increasing competitiveness
    • F、improving customer support

    正确答案:D,E,F

  • 第17题:

    An 802.1X client cannot authenticate to an autonomous access point configured for multiple VLANs. The native VLAN does not have an SSID configured. Which one of the following links being down would prevent the clients from authenticating?()

    • A、between the RADIUS and the access point
    • B、between the client’s VLAN and the WLSE
    • C、between the native VLAN and the WLSE
    • D、between the client’s VLAN and the RADIUS

    正确答案:A

  • 第18题:

    Switch A is configured with VLAN 105 and 106. Switch Bis configured with VLAN 105 and 107.Both switches are connected with a fiber cable. In order for packets from all VLANs to cross thefiber cable, which of the following configurations MUST be present? ()

    • A、Reverse ARP
    • B、Full duplex on the fiber link
    • C、PoE
    • D、802.1q trunking

    正确答案:D

  • 第19题:

    On a network switch, which of the following is the default native VLAN?()

    • A、0
    • B、1
    • C、1024
    • D、4096

    正确答案:B

  • 第20题:

    多选题
    When using Cisco Network Assistant to configure smartports, Which tow of the following roles can belong to a VLAN of the type "access" ?()
    A

    Phone+Desktop

    B

    Desktop

    C

    Switch

    D

    Router

    E

    Trunk


    正确答案: E,A
    解析: 暂无解析

  • 第21题:

    多选题
    Which three of the following are organizational objectives that should be addressed when developing a new VLAN implementation plan? ()
    A

    network management

    B

    improving QoS

    C

    determining budget

    D

    reducing costs

    E

    increasing competitiveness

    F

    improving customer support


    正确答案: A,D
    解析: 暂无解析

  • 第22题:

    多选题
    Which of following VLAN frame encapsulation types are configurable on a Cisco switch?()
    A

    VTP

    B

    802.1Q

    C

    LLC

    D

    ISL

    E

    CDP

    F

    PAP


    正确答案: E,D
    解析: 暂无解析

  • 第23题:

    多选题
    Which of the following steps are necessary in order to add a new VLAN to a switched network?()
    A

    Create the VLAN.

    B

    Name the VLAN.

    C

    Configure an IP address for the VLAN.

    D

    Add the desired ports to the new VLAN.

    E

    Add the VLAN to the VTP domain.


    正确答案: B,C
    解析: 暂无解析