During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()A、在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。B、在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。C、在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。D、在卸货期间,这些设备配有各种吊货索环、吊货网、吊

题目

During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()

  • A、在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。
  • B、在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。
  • C、在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。
  • D、在卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。

相似考题
更多“During loading and discharging, ”相关问题
  • 第1题:

    While discharging a tanker,list can be controlled by ______.

    A.Shoreside personnel

    B.Using a center tank near the bow,discharging as necessary

    C.Using wing tanks near the longitudinal center,discharging as necessary

    D.Using the after peak tank,loading as necessary


    正确答案:C

  • 第2题:

    The ship needs loading and discharging.()

    • A、船舶需要装货
    • B、船舶需要卸货
    • C、船舶需要装卸货
    • D、船舶需要靠港

    正确答案:C

  • 第3题:

    现在天晴了。我们开始装货吧。()

    • A、It’s raining! Let’s stop discharging .
    • B、It’s clear up! Let’s start discharging .
    • C、It’s clear up! Let’s start loading .
    • D、It’s raining! Let’s stop loading .

    正确答案:C

  • 第4题:

    翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime


    正确答案:装卸港口所需的任何驳船,其费用和风险均由租船人负责,所需时间作为装卸时间计算

  • 第5题:

    单选题
    During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().
    A

    150 millimeters of water pressure

    B

    125 millimeters of water pressure

    C

    100 millimeters of water pressure

    D

    75 millimeters of water pressure


    正确答案: A
    解析: 暂无解析

  • 第6题:

    单选题
    When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
    A

    Draft and trim

    B

    Limits of the bending moments

    C

    Rate of discharging

    D

    Rate of loading


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
    A

    precluded

    B

    included

    C

    excluded

    D

    diluted


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    装卸货之前,打开舱盖。()
    A

    After loading and discharging, hatch covers will be opened.

    B

    After loading and discharging, hatch covers will be closed.

    C

    Before loading and discharging, hatch covers will be opened.

    D

    Before loading and discharging, hatch covers will be closed.


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.
    A

    ship owner

    B

    ship's officers

    C

    shippers

    D

    consignors


    正确答案: A
    解析: 暂无解析

  • 第10题:

    问答题
    翻译:Time lost waiting for berth to count as loading/discharging time

    正确答案: 等泊时间计入装卸时间
    解析: 暂无解析

  • 第11题:

    单选题
    Please tell your tallymen to()out the marks in the holds during discharging.
    A

    pick

    B

    choose

    C

    sort

    D

    decide


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    ()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
    A

    Whether working days

    B

    Weather working days

    C

    Running days

    D

    Calendar days


    正确答案: C
    解析: 暂无解析

  • 第13题:

    During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.

    A.ship owner

    B.ship’s officers

    C.Consignors

    D.shippers


    正确答案:B
    在装卸货期间,理货员应该和值班驾驶员联络一边及时解决问题。

  • 第14题:

    船舶需要装卸货。()

    • A、The ship needs loading.
    • B、The ship needs discharging.
    • C、The ship needs unloading.
    • D、The ship needs loading and discharging.

    正确答案:D

  • 第15题:

    翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port


    正确答案:在装卸港所需岸上理货人员,由船方雇佣并负担费用

  • 第16题:

    翻译:Time lost waiting for berth to count as loading/discharging time


    正确答案:等泊时间计入装卸时间

  • 第17题:

    单选题
    A sum of money paid by the Shipowner to Charterer for completing loading or discharging a cargo in less time than that stipulated in Charter Party as laydays.It is().
    A

    extra expenses

    B

    dispatch money

    C

    demurrage

    D

    remuneration


    正确答案: A
    解析: 暂无解析

  • 第18题:

    单选题
    The ship will be responsible for the cargo loaded or unloaded().
    A

    only when the cargo is within its rail

    B

    during the time when loading or ynloading is going on

    C

    after the cargo is checked by tallymen

    D

    as soon as loading or discharging begins


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
    A

    in the loading place

    B

    in the port or dock

    C

    in the loading spot

    D

    in the discharging spot


    正确答案: A
    解析: 暂无解析

  • 第20题:

    问答题
    翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime

    正确答案: 装卸港口所需的任何驳船,其费用和风险均由租船人负责,所需时间作为装卸时间计算
    解析: 暂无解析

  • 第21题:

    问答题
    翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port

    正确答案: 在装卸港所需岸上理货人员,由船方雇佣并负担费用
    解析: 暂无解析

  • 第22题:

    单选题
    现在天晴了。我们开始装货吧。()
    A

    It’s raining! Let’s stop discharging .

    B

    It’s clear up! Let’s start discharging .

    C

    It’s clear up! Let’s start loading .

    D

    It’s raining! Let’s stop loading .


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    船舶需要装卸货。()
    A

    The ship needs loading.

    B

    The ship needs discharging.

    C

    The ship needs unloading.

    D

    The ship needs loading and discharging.


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    When loading or discharging dry mud or cement,crew members should use goggles and().
    A

    facial respirator mask

    B

    ear plugs

    C

    rubberized boots

    D

    fireman's outfit


    正确答案: B
    解析: 暂无解析