A software requirements specification is that () .
A.a rough list of things that the proposed software ought to do
B.a precise list of things that the proposed software ought to do
C.a formal list of things that the proposed software must do
D.an estimate of the resouroes (time, money, personnel, etc) which will be required to construct the proposed software
第1题:
●The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable (66) of the technical requirements for the software product.
During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform. and each (67) that it must meet.The starting point is usually a set of high-level requirements from the (68) that describe the project or problem.
In either case,the requirements definition team formulates an overall concept for the system and the defines (69) showing how the system will be operated,publishes the system and operation concept documents,and conducts a system concept review(SCR).
Following the SCR,the team derives (70) requirements for the system from the highlevel requirements and the system operations concept.Using structured or object-oriented analysis,the team specifies the software functions and algorithms needed to satisfy each detailed requirements.
(66) A.function
B.definition
C.specification
D.statement
(67) A.criterion
B.standard
C.model
D.system
(68) A.producer
B.customer
C.programmer
D.analyser
(69) A.rules
B.principles
C.scenarios
D.scenes
(70) A.detailed
B.outlined
C.total
D.complete
第2题:
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the sofrware must perform. and each(72)that it must meet. The starting point is usually a set of high-level requirements from the(73)that describe the project or problem.In either case, the requirements definition team formulates an overall concept for the system and then defines(74)showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR).Following the SCR, the team derives(75)requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
A.function
B.definition
C.specification
D.statement
第3题:
A.Use the lppdiff command to list the contents
B.Use the installp -Q command to list the contents
C.Choose the SMIT option to Preview Install Only
D.Choose the SMIT option to list dependents of a software product
第4题:
A requirements specification is( ).
A.a rough list of things that the proposed software ought to do
B.a precise list of things that the proposed software ought to do
C.a formal list of things that the proposed software must do
D.an estimate of the resources (time,money,personnel,etc)which will be required to construct the proposed software .
第5题:
第6题:
第7题:
第8题:
第9题:
第10题:
第11题:
Which of the following procedures correctly lists the prerequisite software that requires installation with an AIX licensed program product?()
第12题:
System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
第13题:
● Software (71) refers to that the software to meet the specification must be produced.
(71)
A. test
B. support
C. development
D. process
第14题:
Before a project schedule can be created,the schedule maker should have a(),an effort estimate for each task,and a resource list with availability for each resource
A.work breakdown structure
B.baseline
C.software requirements specification
D.plan
第15题:
Software ______ refers to that the software to meet the specification must be produced.
A.test
B.support
C.development
D.Process
A.
B.
C.
D.
第16题:
Which of the following statements is correct?
A.The definition phase results in the Software Requirements Specification.
B.Testing is optional in software life cycle.
C.CASE tools can only aid in the design phase of a software life cycle.
D.A change during a later phase does not require the documentation of all earlier phases to be updated.
第17题:
第18题:
第19题:
第20题:
第21题:
第22题:
Which of the following commands should be used to obtain information about the installed software?()
第23题:
living standards
survival condition
chance of survival
technical specification