●Which of the following is not an input to quality planning? (73) .
(73) A. scope statement
B. regulations
C. work results
D. standards
第1题:
●The major problem with Email is that it is (71) easy to use that people can become (72) with messages (73) they can possibly answer in a day.In addition,mail boxes require some management to (74) messages or archive those that might be required later.Senders don't always know about your Email backlog and often send (75) messages.
(71) A.too
B.so
C.very
D.much
(72) A.full
B.lost
C.inundated
D.filled
(73) A.more than
B.than
C.that
D.which
(74) A.manage
B.save
C.backup
D.dispose of
(75) A.toomany
B.redundant
C.long
D.trivial
第2题:
试题(73)
Tool for defining activities is(73).
(73)
A.Dependency Determination
B.Precedence Diagramming method
C.Rolling Wave Planning
D.Schedule network Templates
第3题:
Mobile computers-which(71)laptops, notebooks, subnotebooks and handhelds-(72)so ubiquitous in such a short time, no surprise to hear who say: "It will define the leading edge(73)the next five years or so." The most remarkable(74)mobile computers is the amount of data storage and memory packed(75)their tiny boxes. These devices not only handle windows easily but also run storage-hungry programs.
A.included
B.include
C.have included
D.have become
E.had become
第4题:
The data station usually means a(71)unit that provides data for transmission, that accepts transmitted data, and that performs all functions necessary for communication with another functional unit. Data stations may be divided into two kinds, the primary stations and the secondary stations, (72)control functions.In(73)data link control, the primary station is the data station that supports the primary control functions of the data link, generates commands to be transmitted, and interprets received responses. Specific responsibilities assigned to the primary station include initialization of control signal interchange, organization of data flow and actions regarding error control and error recovery functions. The secondary station executes data link control functions as (74)by the primary station, interprets received commands and (75) responses to be transmitted.
A.performance
B.functional
C.capacity
D.quality
第5题:
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the sofrware must perform. and each(72)that it must meet. The starting point is usually a set of high-level requirements from the(73)that describe the project or problem.In either case, the requirements definition team formulates an overall concept for the system and then defines(74)showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR).Following the SCR, the team derives(75)requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
A.function
B.definition
C.specification
D.statement
第6题:
月末结转已销A产品成本73,500元,企业应作如下账务处理:
A.借:主营业务成本 73,500 贷:库存商品——A产品 73,500
B.借:主营业务成本 73,500 贷:原材料——A产品 73,500
C.借:库存商品——A产品 73,500 贷:生产成本——A产品 73,500
D.借:生产成本--A产品 73,500 贷:库存商品--A产品 73,500
E.借:其他业务成本 73,500 贷:原材料——A产品 73,500
F.借:主营业务成本 73,500 贷:本年利润 73,500
G.借:生产成本--A产品 73,500 贷:制造费用 73,500