Project()Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval,and ultimate disposition of project information.() A.Integration B.Time C.Planning D.Co

题目

Project()Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval,and ultimate disposition of project information.() A.Integration B.Time C.Planning D.Communication


相似考题

4.4 Graham Smith is Operations Director of Catering Food Services (CFS) a £1·5 billion UK based distributor of foods toprofessional catering organisations. It has 30 trading units spread across the country from which it can supply acomplete range of fresh, chilled and frozen food products. Its customers range from major fast food chains, cateringservices for the armed forces down to individual restaurants and cafes. Wholesale food distribution is very much aprice driven service, in which it is very difficult to differentiate CFS’s service from its competitors.Graham is very aware of the Government’s growing interest in promoting good corporate environmental practices andencouraging companies to achieve the international quality standard for environmentally responsible operations. CFSoperates a fleet of 1,000 lorries and each lorry produces the equivalent of its own weight in pollutants over the courseof a year without the installation of expensive pollution control systems. Graham is also aware that his largercustomers are looking to their distributors to become more environmentally responsible and the ‘greening’ of theirsupply chain is becoming a real issue. Unfortunately his concern with developing a company-wide environmentalmanagement strategy is not shared by his fellow managers responsible for the key distribution functions includingpurchasing, logistics, warehousing and transportation. They argued that time spent on corporate responsibility issueswas time wasted and simply added to costs.Graham has decided to propose the appointment of a project manager to develop and implement a companyenvironmental strategy including the achievement of the international quality standard. The person appointed musthave the necessary project management skills to see the project through to successful conclusion.You have been appointed project manager for CFS’s ‘environmentally aware’ project.Required:(a) What are the key project management skills that are necessary in achieving company-wide commitment inCFS to achieve the desired environmental strategy? (15 marks)

更多“Project()Management is the Knowledge Area that employs the processes required to ensure ti ”相关问题
  • 第1题:

    Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.

    A.Integration

    B.Configuration

    C.Scope

    D.Requirement


    正确答案:C

  • 第2题:

    知信行理论模式英文为( )。

    A.knowledge,attitude and pmeess

    B.knowledge,belief

    C.knowtedge,attitude and practice

    D.1mowledgc,att:tedi


    正确答案:C

  • 第3题:

    Consequently,a sustainable business model can______companies to better adapt to complex environments and achieve sustainable competitive advantages。

    A.render
    B.enable
    C.cause
    D.ensure

    答案:B
    解析:
    本题考查近义词辨析。题目意为“因此,一个可持续的商业模式能够使企业更好地适应复杂的环境,实现可持续的竞争优势。”A选项“致使,补偿”,B选项“使能够,使可能”,C选项“引起,造成”,D选项“保证,确保”。空格后面有to,所以空格填一个能接to的动词。固定搭配enable sb/sth to do sth,使可能,B选项正确。
      

  • 第4题:

    Refer to Topic TestKing.com in iPAD document.What happens to the network when TestKingX is reconnected and a trunk exists between the two switches?()

    A. All VLANs except the default VLAN will be removed from all switches.

    B. All existing switches will have the students, admin, faculty, Servers, Management,Production, and no-where VLANs.

    C. The VLANs Servers, Management, Production, and no-where will replace the VLANs on SwX.

    D. The VLANs Servers, Management, Production, and no-where will be removed from existing switches.


    参考答案:D

  • 第5题:

    New curriculum promotes the three-dimensional teaching objective which includes__________.

    A.knowledge, skills and methods
    B.emotional attitude and values
    C.knowledge, skills and emotion
    D.knowledge and skills; process and methods; emotional attitude and values

    答案:D
    解析:
    考查英语教学三维目标。英语课程标准规定的三维教学目标包括知识与技能、过程与方法、情感态度与价值观。故选D。

  • 第6题:

    Care providers also need to help patients to manage their feelings of uncertainty and______them of the benefits of modern medicine and technology which can substantially aid in health improvement。

    A.assure
    B.insure
    C.sure
    D.ensure

    答案:A
    解析:
    本题考查同根词义辨析。题目意为“护理提供者还需要帮助患者应对他们的不确定感,并向他们保证当前现代医学技术可以极大地促进健康改善,而他们可以从中获益。”A选项“使确信,向……保证”,B选项“为……投保”,C选项“确信的,有把握的”, D选项“保证,确保”。固定搭配assure sb. of ,意为“使某人确信,向某人保证”。