● Project (74) Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.A.IntegrationB.TimeC.PlanningD.C

题目

● Project (74) Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

A.Integration

B.Time

C.Planning

D.Communication


相似考题

2.4 Graham Smith is Operations Director of Catering Food Services (CFS) a £1·5 billion UK based distributor of foods toprofessional catering organisations. It has 30 trading units spread across the country from which it can supply acomplete range of fresh, chilled and frozen food products. Its customers range from major fast food chains, cateringservices for the armed forces down to individual restaurants and cafes. Wholesale food distribution is very much aprice driven service, in which it is very difficult to differentiate CFS’s service from its competitors.Graham is very aware of the Government’s growing interest in promoting good corporate environmental practices andencouraging companies to achieve the international quality standard for environmentally responsible operations. CFSoperates a fleet of 1,000 lorries and each lorry produces the equivalent of its own weight in pollutants over the courseof a year without the installation of expensive pollution control systems. Graham is also aware that his largercustomers are looking to their distributors to become more environmentally responsible and the ‘greening’ of theirsupply chain is becoming a real issue. Unfortunately his concern with developing a company-wide environmentalmanagement strategy is not shared by his fellow managers responsible for the key distribution functions includingpurchasing, logistics, warehousing and transportation. They argued that time spent on corporate responsibility issueswas time wasted and simply added to costs.Graham has decided to propose the appointment of a project manager to develop and implement a companyenvironmental strategy including the achievement of the international quality standard. The person appointed musthave the necessary project management skills to see the project through to successful conclusion.You have been appointed project manager for CFS’s ‘environmentally aware’ project.Required:(a) What are the key project management skills that are necessary in achieving company-wide commitment inCFS to achieve the desired environmental strategy? (15 marks)

参考答案和解析
正确答案:D
更多“● Project (74) Management is the Knowledge Area that employs the processes required to ens ”相关问题
  • 第1题:

    Virtualization is an approach to IT that pools and shares(71)so that utilization is optimized and supplies automatically meet demand. Traditional IT environments are often silos, where both technology and human(72)are aligned around an application or business function. With a virtualized(73), people, processes, and technology are focused on meeting service levels,(74)is allocated dynamically, resources are optimized, and the entire infrastructure is simplified and flexible. We offer a broad spectrum of virtualization(75)that allows customers to choose the most appropriate path and optimization focus for their IT infrastructure resources.

    A.advantages

    B.resources

    C.benefits

    D.precedents


    正确答案:B
    解析:虚拟化是IT行业缓存和共享资源的一种方法,通过这种方法可以更好地利用资源,并且自动提供资源以满足需求。传统的IT环境通常是一个竖井,技术和人力资源都是围绕应用或商业功能来安排的。利用虚拟化的架构,人员、过程和技术都集中于满足服务的程度,生产量被动态地分配,资源得到优化,而且整个架构得以简化,变得很灵活。我们提供了广泛的虚拟化解决方案,允许客户为他们的IT资源的基础架构选择最适用的路线和优化的重点。

  • 第2题:

    Refer to Topic TestKing.com in iPAD document.What happens to the network when TestKingX is reconnected and a trunk exists between the two switches?()

    A. All VLANs except the default VLAN will be removed from all switches.

    B. All existing switches will have the students, admin, faculty, Servers, Management,Production, and no-where VLANs.

    C. The VLANs Servers, Management, Production, and no-where will replace the VLANs on SwX.

    D. The VLANs Servers, Management, Production, and no-where will be removed from existing switches.


    参考答案:D

  • 第3题:

    New curriculum promotes the three-dimensional teaching objective which includes__________.

    A.knowledge, skills and methods
    B.emotional attitude and values
    C.knowledge, skills and emotion
    D.knowledge and skills; process and methods; emotional attitude and values

    答案:D
    解析:
    考查英语教学三维目标。英语课程标准规定的三维教学目标包括知识与技能、过程与方法、情感态度与价值观。故选D。

  • 第4题:

    Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.

    A.Integration

    B.Configuration

    C.Scope

    D.Requirement


    正确答案:C

  • 第5题:

    Project(74)Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

    A.Integration

    B.Time

    C.Planning

    D.Communication


    正确答案:D
    解析:项目沟通管理是使用所需过程以确保及时、恰当地产生、收集、分发、存储、收回和最终处置项目信息的知识域。