● The project maintains a current and approved set of requirements ovethe life of the project by doing the following:
· (73) all changes to the requirements
· Maintaining the relationships among the requirements, the project plansand the work products
· ……
(73)
A. Monitoring
B. Managing
C. Gathering
D. Reducin
第1题:
Whichlinecontainsaconstructorinthisclassdefinition?()publicclassCounter{//(1)intcurrent,step;publicCounter(intstartValue,intstepValue){//(2)set(startValue);setStepValue(stepValue);}publicintget(){returncurrent;}//(3)publicvoidset(intvalue){current=value;}//(4)publicvoidsetStepValue(intstepValue){step=stepValue;}//(5)}
A.Codemarkedwith(1)isaconstructor
B.Codemarkedwith(2)isaconstructor
C.Codemarkedwith(3)isaconstructor
D.Codemarkedwith(4)isaconstructor
E.Codemarkedwith(5)isaConstructor
第2题:
The 1973 ABS Steel Vessel Rules,under which the PRESTIGE was built,did not include ______ requirements.
A.hull fatigue strength
B.longitudinal strength
C.buckling strength
D.yielding strength
第3题:
第4题:
A ___ (救生圈) should be located on the gangway.
A.life-jacket
B.life-raft
C.life-buoy
D.life-boat
第5题:
第6题: