A、the date of record
B、the date of payment
C、the date of announcement
D、the date of declaration
第1题:
16 Which of the following events between the balance sheet date and the date the financial statements are
authorised for issue must be adjusted in the financial statements?
1 Declaration of equity dividends.
2 Decline in market value of investments.
3 The announcement of changes in tax rates.
4 The announcement of a major restructuring.
A 1
A 1 only
B 2 and 4
C 3 only
D None of them
第2题:
(ii) The shares held in Date Inc and the dividend income received from that company. (7 marks)
第3题:
在某数据表中的执勤时间字段查找执勤时间30 之内的准则是( )。
A.Between Date()Or Date-30
B.Between Date()And Date()-30
C.<Date()And>Date()-30
D.<Date()Or>Date()-30
第4题:
材料:
A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.A Cargo Ship Safety Construction Certificate,Cargo Ship Safety Equipment Certificate and Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years.
An Exemption Certificate shall not be valid for longer than the period of the certificate to which it refers.
(i)When the renewal survey is completed within three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;
(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;
(ii)When the renewal survey is completed after the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;
(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;
(iii)when the renewal survey is completed more than three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of completion of the renewal survey;
(2)for a cargo ship,a date not exceeding five years from the date of completion of the renewal survey.
问题:
The valid period of an Exemption Certificate for Cargo Ship Safety Equipment Certificate shall be ________.
A.longer than five years
B.shorter than five years
C.longer than 12 months
D.shorter than 12 months
When the renewal survey is completed within one month before the expiry date of the existing Cargo Ship Safety Construction Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate
B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate
C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date
D.from the date of expiry of the existing certificate to a date not exceeding five years from the date
It can be concluded that the actual period of validity of a new Passenger Ship Safety Certificate is less than 12 months if the renewal survey is completed ________.A.4 months before its expiry date
B.3 months before its expiry date
C.2 months before its expiry date
D.after its expiry date
When the renewal survey is completed on a date which is 99 days before the expiry date of the existing Cargo Ship Safety Radio Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate
B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate
C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date
D.from the date of completion of the renewal survey to a date not exceeding five years from that date
请帮忙给出每个问题的正确答案和分析,谢谢!
第5题:
“签发日期”的英语表述是()。
第6题:
which one of the following should maria do to display the release date in a text column?()
第7题:
The warranty expiration date of each server should be recorded in which of the following documents?()
第8题:
Which of the following local files is used to run the date command on the remote machine "Earth" using the following rexec command without request for a password? rexec Earth date()。
第9题:
Examine the description of the STUDENTS table: STD_ID NUMBER(4) COURSE_ID VARCHARD2(10) START_DATE DATE END_DATE DATE Which two aggregate functions are valid on the START_DATE column?()
第10题:
~/ .rhosts
$HOME/.netrc
/etc/hosts.equiv
/etc/security/user
第11题:
@Number(Date)-30
@Adjust(Date;0;0;30;0;0;0)
@Adjust(Date;0;0;-30;0;0;0)
@If(Date!=;Date-30;@Failure(There is no current release date))
第12题:
SUM(start_date)
AVG(start_date)
COUNT(start_date)
AVG(start_date, end_date)
MIN(start_date)
MAXIMUM(start_date)
第13题:
5 Which of the following events after the balance sheet date would normally qualify as adjusting events according
to IAS 10 Events after the balance sheet date?
1 The bankruptcy of a credit customer with a balance outstanding at the balance sheet date.
2 A decline in the market value of investments.
3 The declaration of an ordinary dividend.
4 The determination of the cost of assets purchased before the balance sheet date.
A 1, 3, and 4
B 1 and 2 only
C 2 and 3 only
D 1 and 4 only
第14题:
A. SUM(start_date)
B. AVG(start_date)
C. COUNT(start_date)
D. AVG(start_date, end_date)
E. MIN(start_date)
F. MAXIMUM(start_date)
第15题:
查询最近30天的记录应使用( )作为准则。
A)Between Date( )And Date( )-30
B)Between Date( )-30 And Date( )
C)<=Date( )-30
D)<Date( )-30
第16题:
In the video form. the OrderDate field (Which shows When the video may be ordered)is calculated based on the Date field (Which displays the release date ). The order date is 30 days prior to the release date. Which one the following formulas will calculate the OrderDate value?()
第17题:
Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()
第18题:
As per UCP600, the words “to”, “till”, “from”, “between” when used to determine a period of shipment include the date or dates mentioned, the words “before” and “after” exclude the date mentioned. ()
第19题:
Which of the following has NO effect on controlling the access permissions needed to run the "date" command on the remote machine "Earth" using the following syntax?rsh Earth date()。
第20题:
14. DateFormat df; 15. Date date = new Date(); 16. //insert code here 17. String s = df.format( date); Which two,inserted independently at line 16, allow the code to compile?()
第21题:
Which two statements are true regarding working with dates?()
第22题:
elapsed time since the target start date or completion date of previous work generated by PM
difference between completion date of previous work and system date is equal to Lead Time
elapsed time since the target start date or completion date of the latest work orders for the asset
metered equipment usage since the target start date or completion date of previous work generated by PM
metered equipment usage since the target start date or completion date of the latest work order for the asset
第23题:
df= new DateFormat();
df= Date.getFormatter();
df= date.getFormatter();
df= date.getDateFormatter();
df = DateFormat.getDateInstance();
df= DateFormat.getInstance();