A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble.Which resource should be consulted while developing the solution options?()
A. Disk Magic
B. TPC for Data
C. CLARiiON Procedure Generator
D. System Storage Interoperability Center
第1题:
Yours truly,customer has deployed a cisco wireless location appliance within its warehouse environment. however, employees there have been experiencing problems when tracking objects using active rfid tags. the rfid tag data is not being collected. On which device would you verify that rfids have been enabled?()
第2题:
A customer’s SAN environment has undergone significant growth over the past two years. They have also suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus. Which tool should the storage specialist suggest()
第3题:
The customer has both a Windows SAN and a separate UNIX SAN. Each of these is managed bya different group. The UNIX group has a need for more resources and no available funding. Whatis the first question the storage specialist should ask?()
第4题:
A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()
第5题:
A medium-sized company with 500 employees has a rapidly growing storage infrastructure with clustered mail, database, and file and print core business applications running on six servers. Using current direct attached SCSI storage pools to each server leads to inefficient utilization of storage space.They also have a backup device attached to each server. They want to consolidate their storage and backup infrastructure into a scalable, high availability and high performance solution. The customer’s top priorities are performance, cost, and availability. Which of the following backup solutions best satisfies the customer requirements?()
第6题:
A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()
第7题:
A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()
第8题:
tri-rate SFP
update to the latest Cisco IOS
FCIP activation on the existing 16 FC line cards
Multiprotocol Services Module with FCIP activation
第9题:
Visio
TPC Basic Edition
IBM Tivoli NetView
Fabric Manager
第10题:
802.11b/g VoIP
Data Collection
802.11b and g clients
RFID tags
第11题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第12题:
Download the latest drivers from EMC for Red Hat Advanced Server.
Ensure that the EMC storage server is configured properly and has the latest firmware levels.
Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).
Ensure that the systems are connected to the EMC SAN controller.
第13题:
A systems administrator has a high performance server with a file share full of data that has not been used in a long time, but is still important and might be used in the future. Which of the following should they do to reclaim the space off the high performance server?()
第14题:
A company needs additional storage for a block I/O based database application. The application has low I/O bandwidth requirements across the campus. The customer has a TCP/IP infrastructure and is interested in low-cost products that are compatible with its environment. Which technology is most appropriate for this customer?()
第15题:
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()
第16题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第17题:
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()
第18题:
A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()
第19题:
N7900
N6040
DS3300
DS3500
第20题:
the production environment does not require an outage
the production environment requires an outage to install the SVC
the production environment requires an outage to install the DS8700
the production environment requires an outage to remove the EMC systems
第21题:
Disk Magic
TPC for Data
CLARiiON Procedure Generator
System Storage Interoperability Center
第22题:
an assessment of the preparedness of the customers existing system infrastructure to support a propose solution
a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its system
an in-depth assessment of the operational environment required to support the operation of both the current and planned solutions
the optimal technologies for supporting its business requirements and objectives
第23题:
data collection
802.11b/g voip
802.11b and g clients
rfid tags