An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()
A.An additional switch for the new HMC
B.Asynchronous adapters on the new HMC
C.The two 570 servers are directly connected to the new HMC
D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第1题:
When William hurried home, he found that his mother ____already ____to hospital.
A、has; been sent
B、had; sent
C、has; sent
D、had; been sent
第2题:
A./var/adm/ras/bosinstlog
B./var/adm/ras/devinst.log
C./var/adm/rshlog
D./var/adm/sulog
第3题:
A.CardscanbeaddedandthenenabledviaHardwareManagementConsole(HMC)GUIorcommandline.
B.TheHMCallowsaccesstotheAdvancedSystemManagementInterface(ASMI),wheretheslotscanbemanaged.
C.IftheemptyslotwasalreadyallocatedtoanLPAR,theLPARcanusethecardafterthecfgmgrscripthasbeenrun.
D.TheHardwareManagementConsole(HMC)GUIcanguideacustomerthroughtheprocessofaddingacardtoanemptyslot.
第4题:
A./var/adm/ras/errlog
B./var/adm/ras/diag_log
C./var/adm/ras/bootlog
D./var/adm/ras/devinst.log
第5题:
A./var/adm/acct/sum
B./var/adm/ras
C./usr/sbin/acct
D./var/adm/wtmp
第6题: