A、时间安排很紧的(Tightscheduled)
B、保持进度的(Onschedule)
C、非关键路径上的(Non-CriticalPath)
D、关键路径上的(CriticalPath)
第1题:
53 Resource leveling _____.
A. Allocates resources to activities to find shortest schedule within fixed resource limits.
B. Smoothes out resource requirements by rescheduling activities within their float time.
C. Smooths out resource requirements by substituting activities with unassigned resources.
D. Attempts to reduce resource requirements within a constraint on project duration
E. B or D
第2题:
对多项目进行进度计划编制和资源时,以下哪项参数将受到影响?
A、 资源命名用和资源平衡
B、 历时压缩和模拟
C、 活动清单和工作分解结构
D、 进度计划滑动和进行中存货
第3题:
第4题:
● Resource leveling _____.
A Allocates resources to activities to find shortest schedule within fixed resource limits.
B Smoothes out resource requirements by rescheduling activities within their float time.
C Smooths out resource requirements by substituting activities with unassigned resources.
D Attempts to reduce resource requirements within a constraint on project duration
E B or D