Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner ________.A.Two to four feet by the bowB.Slightly by the bowC.No trim should be permittedD.Slightly by the stern

题目

Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner ________.

A.Two to four feet by the bow

B.Slightly by the bow

C.No trim should be permitted

D.Slightly by the stern


相似考题
参考答案和解析
正确答案:B
更多“Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in wh ”相关问题
  • 第1题:

    A vessel trimmed by the stern has a ______.

    A.List

    B.Drag

    C.Set

    D.Sheer


    正确答案:B

  • 第2题:

    While off-loading from an offshore supply vessel with the crane,the wind increases in strength and changes direction significantly,you should ______.

    A.Expedite off-loading

    B.Stop off-loading,but keep the offshore supply vessel in the present location

    C.Continue off-loading with no changes

    D.Move the offshore supply vessel to the downwind side


    正确答案:D

  • 第3题:

    翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port


    正确答案:在装卸港所需岸上理货人员,由船方雇佣并负担费用

  • 第4题:

    单选题
    Prior to being able to sail in a US port,each vessel that carries grain in bulk must have a certificate of loading issued by the().
    A

    American Bureau of Shipping

    B

    Lloyds of London

    C

    National Cargo Bureau

    D

    US Salvage


    正确答案: D
    解析: 暂无解析

  • 第5题:

    单选题
    You are transporting dangerous cargo on your vessel.You must inspect this cargo().
    A

    Daily

    B

    Daily,at sea only

    C

    After encountering rough weather

    D

    After loading and prior to arrival in port only


    正确答案: D
    解析: 暂无解析

  • 第6题:

    单选题
    In astern towing,a tow span,also called the tow bar or towing arch,is used to().
    A

    insure that the hawser leads directly aft as it passes over the stern of the towing vessel

    B

    increase the stability of the towing vessel by raising the hawser off the deck

    C

    reduce chafing of the towing hawser

    D

    prevent fouling of the hawser on deck gear located on the stern of the towing vessel


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?()
    A

    The propeller hub taper and shaft keyway should be inspected for cracks or corrosion

    B

    The stern bearing alignment with the stern frame should be checked

    C

    The interior of the stern tube should be inspected for leaks

    D

    The shaft liner should be removed and inspected


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    When evacuating a seaman by helicopter lift,which statement is TRUE?()
    A

    Evacuation should be from an area forward of the bridge

    B

    The vessel should be slowed to bare steerageway

    C

    If the hoist is at the stern,booms extending aft at the stern should be cradled with the topping lifts hove taut

    D

    The litter should not be touched until it has been grounded


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    Connentrated heavy loads are involved in loading a lash vessel. What does not require close attention due to such loads while working cargo?().
    A

    GM-available and required

    B

    Longitudinal stress numberal

    C

    Tons per inch immersion numeral

    D

    Draft


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A situation has occurred in which your vessel must be towed. When the towing vessel passes the towing line to you,you should secure the line().
    A

    to the base of the foremast

    B

    to the forward-most bitts

    C

    to the forward part of the deckhouse

    D

    at the stern


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()
    A

    Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holds

    B

    Turn on ventilation for cargo holds,raise/open the stern door,lower the stern ramp

    C

    Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern door

    D

    Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that().
    A

    any list,no matter where it is posted,shall be removed prior to ending his watch by the OOW

    B

    the vessel should not be removed

    C

    any and all lists on board the vessel should be taken off

    D

    the inclination of the vessel should be corrected prior to ending his watch by the OOW


    正确答案: D
    解析: 暂无解析

  • 第13题:

    What should be done after putting down the ramp on a Ro-Ro vessel,prior to loading or discharging cargo ________.

    A.Turn on red cargo light

    B.Turn on ventilation for cargo holds

    C.Call out the deck department for all hands

    D.None of the above


    正确答案:B

  • 第14题:

    Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?______.

    A.GM – available and required

    B.Longitudinal stress numeral

    C.Tons per inch immersion numeral

    D.Draft


    正确答案:C
    涉及到子母船的集中大量装载。在这一类货物操作中,什么不需要被密切注意?每英尺浸没吨数

  • 第15题:

    单选题
    A vessel trimmed by the stern has a().
    A

    list

    B

    drag

    C

    set

    D

    sheer


    正确答案: B
    解析: 暂无解析

  • 第16题:

    单选题
    How should you try to right a capsized small sailing vessel?()
    A

    Position all personnel at the stern and rock the vessel upright

    B

    Position all personnel around the mast and lift the vessel upright

    C

    Lock the centerboard in the down position,stand on the centerboard,and pull on a shroud or a halyard

    D

    Put the centerboard in the up position and have all personnel haul in on the line attached to the mast


    正确答案: A
    解析: 暂无解析

  • 第17题:

    单选题
    Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner?().
    A

    Two to four feet by the bow

    B

    Slightly by the bow

    C

    No trim should be permitted

    D

    Slightly by the stern


    正确答案: D
    解析: 暂无解析

  • 第18题:

    单选题
    To determine which grades of cargo a tank vessel is permitted to carry you should().
    A

    refer to the vessel's Certificate of Inspection

    B

    examine the cargo tanks and fittings

    C

    ask the terminal supervisor or his representative

    D

    check the loading order


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    Two barges are being pushed ahead by a tugboat.Which statement is TRUE concerning lights on the barges().
    A

    Each vessel should show sidelights

    B

    Each vessel should show at least one white light

    C

    The barges should be lighted as separate units

    D

    The barges should be lighted as one vessel


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?() .
    A

    GM - available and required

    B

    Longitudinal stress numeral

    C

    Tons per inch immersion numeral

    D

    Draft


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    What is NOT a problem area when loading barges on a LASH type vessel? ()
    A

    Frequent stability calculations required

    B

    Thorough pre-planning required

    C

    Limiting depths alongside berths restrict barge drafts

    D

    Minimum trim and 0°list are required for optimum operations


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A fire has broken out on the stern of your vessel. You should maneuver your vessel so the wind ().
    A

    comes over the bow

    B

    blows the fire back toward the vessel

    C

    comes over the stern

    D

    comes over either beam


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    If your vessel is dragging her anchor in a strong wind,you should().
    A

    shorten the scope of anchor cable

    B

    increase the scope of anchor cable

    C

    put over the sea anchor

    D

    put over a stern anchor


    正确答案: C
    解析: 暂无解析