更多“A breach of the ______ undertaking of seaworthiness at the port of loading entitles the Ch ”相关问题
  • 第1题:

    If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of ______ contract.

    A.a part of

    B.the whole

    C.3/4th of

    D.1/2nd of


    正确答案:B

  • 第2题:

    ______ my knowledge the figure at the loading port is not quite accurate.

    A.At

    B.In

    C.To

    D.With


    正确答案:C

  • 第3题:

    汉译英:“装运港;卸货港”,正确的翻译为( )。
    A. port of transfer ; port of discharge B. port of loading ; port of discharge
    C. port of transfer ; port of destination D. port of loading ; port of desdnafion


    答案:B
    解析:

  • 第4题:

    汉译英:“装货港;到达日期”,正确的翻译为:()
    A.Port of loading ; Date of departure
    B.Port of discharge ; Date of departure
    C.Port of loading ; Date of arrival
    D.Port of discharge ; Date of arrival


    答案:C
    解析:

  • 第5题:

    翻译:any kraft paper and/of dunnage if required at loading port to be for owners’ account


    正确答案:在装货港所需任何垫舱纸板及/或物料应由船方负担

  • 第6题:

    单选题
    The port clearance for a ship should be granted()the completion of loading or discharging in the port.
    A

    before

    B

    when

    C

    after

    D

    during


    正确答案: D
    解析: 暂无解析

  • 第7题:

    单选题
    The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
    A

    the port of destination

    B

    the next port of call

    C

    the port of arrival

    D

    the last port of call


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    A breach of the()undertaking of seaworthiness at the port of loading entitles the Charterer to refuse to load.
    A

    supplied

    B

    complied

    C

    provided

    D

    implied


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().
    A

    available dunnage,and chocking

    B

    crushability,and inherent vice

    C

    sweat,and weight

    D

    weight,and refrigeration


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    ()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.
    A

    Where

    B

    As a fact that

    C

    In so far as

    D

    In no case that


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().
    A

    the port of destination

    B

    the next port of call

    C

    the port of arrival

    D

    the last port of call


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    I’m not fully aware()what happened at the loading port.
    A

    at

    B

    to

    C

    of

    D

    about


    正确答案: B
    解析: 暂无解析

  • 第13题:

    In every case the Owners shall ______ his own Broker or Agent both at the port of loading and the port of discharge.

    A.appoint

    B.give name to

    C.make

    D.take


    正确答案:A

  • 第14题:

    When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.

    A.Available dunnage,and chocking

    B.Crushability,and inherent vice

    C.Sweat,and weight

    D.Weight,and refrigeration


    正确答案:D

  • 第15题:

    汉译英:“目的港”,正确的翻译为( )。

    A. port of loading B. port of destination
    C. port of discharge D. port of dispatch


    答案:B
    解析:

  • 第16题:

    汉译英:“装货港;到达日期”,正确的翻译为:( )。
    A. Port of loading ; Date of departure B. Port of discharge ; Date of departure
    C. Port of loading ; Date of arrival D. Port of discharge ; Date of arrival


    答案:C
    解析:

  • 第17题:

    port-of-loading的意思是()


    正确答案:装货港

  • 第18题:

    单选题
    When arranging cargo for()in the holds,we should give first consideration to ship’s seaworthiness and her being in a good sea-going trim after loading.
    A

    dunnage

    B

    separation

    C

    stowage

    D

    operation


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    ()my knowledge the figure at the loading port is not quite accurate.
    A

    At

    B

    In

    C

    To

    D

    With


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    It is necessary for the ship to contact()for authorization prior to undertaking mitigating actions in an oil pollution incident.
    A

    the port state

    B

    the shipping company

    C

    the coastal state

    D

    the flag state


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    ]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
    A

    a part of

    B

    the whole

    C

    3/4th of

    D

    1/2nd of


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
    A

    in the loading place

    B

    in the port or dock

    C

    in the loading spot

    D

    in the discharging spot


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    How()the cargo at loading port?
    A

    about

    B

    in

    C

    with

    D

    from


    正确答案: A
    解析: 暂无解析

  • 第24题:

    填空题
    port-of-loading的意思是()

    正确答案: 装货港
    解析: 暂无解析