A deck-stowed 40-foot container is giving off smoke,and one end is discolored from heat. The cargo is valuable and easily damaged by water. You want to extinguish the fire without further damage if possible. What action should you take? ______.
A.Connect a portable line from the ship's fixed system and discharge CO2 into the container
B.Flood the container with water and disregard any cargo damage as the fire threatens the entire vessel
C.Pierce the container and discharge 6 or more portable CO2's then add more CO2 hourly
D.Cool the exterior of the container with water and close all vents; then keep it cooled until it can be off-loaded
第1题:
以下程序的输出结果是_____。
include<iostream.h>
class object
{ private:
int val;
public:
object( ) ;
object(int i) ;
~object( ) ;};
object: :object( )
{ val=0;
cout < < "Default constructor for object" < < endl;}
object: :object(int i)
{ val=i;
cout < < "Constructor for object" < < val < < endl;}
object: :~object( )
{ cout < < "Destructor for object" < < val < < endl;}
class container{ private:
object one;
object two;
int data;
public:
container( ) ;
container(int i,int j,int k) ;
~container( ) ;};
container: :container( )
{ data=0;
cout < < "Default constructor for container" < < endl;}
container: :container(int i,int j,int k) :two(i) ,one(j)
{ data=k;
cout < < "Constructor for container" < < endl;}
container: :~container( )
{ cout < < "Destructor for container" < < endl;}
void main( )
{ container anObj(5,6,10) ;}
第2题:
In towing,chocks are used to ______.
A.protect the towline from chafing
B.secure the end of the towline on the tug
C.stop off the towline while retrieving it
D.absorb shock loading on the towline
第3题:
第4题:
第5题:
was she
weren’t she
were they
weren’t they
第6题:
dead band action
neutral zone action
range
on-off action
第7题:
protect the towline from chafing
secure the end of the towline on the tug
stop off the towline while retrieving it
absorb shock loading on the towline
第8题:
Have her on a hawser from the stern
Tie her up on the inshore bow to hold the ship off the end
Tie her up on the offshore bow
Tie her up on the inshore quarter to lift the stern
第9题:
The Chief Mate and Master of a container ship should have the proposed stowage plan ready for the stevedore upon arrival in port
When stowed on deck of a break bulk ship,the bottom of the container must be evenly supported throughout
With tiered containers,a 40-foot container may be stowed on top of two 20-foot containers
Deck load calculations must take into account the square footage of the entire container bottom
第10题:
Four lower corner castings
Bottom,side,and end rails
Bottom flooring,side,and end rails
Bottom flooring only
第11题:
a line is weakened by constantly pulling on it in one direction
normal wear on the line is thus distributed to different areas
it prevents the line from kinking or unlaying
it prevents permanent misalignment of the line's internal strands
第12题:
act as a pilot from the solenoid valve
regulate the amount of refrigerant flow to the coil
regulate the water flow
turn the compressor off and on
第13题:
The control mode in which tile final control element is moved from one of two fixed positions to the other is known as______.
A.dead band action
B.neutral zone action
C.range
D.on-off action
第14题:
Mooring lines should be turned end-for-end occasionally. This is because ______.
A.a line is weakened by constantly pulling on it in one direction
B.normal wear on the line is thus distributed to different areas
C.it prevents the line from kinking or unlaying
D.it prevents permanent misalignment of the line’s internal strands
第15题:
第16题:
An administrator receives a call from an end user reporting that the application they are using keeps giving them an error on port 23. Which of the following is being used?()
第17题:
shutting off the oxygen supply
cooling surfaces adjacent to the fire
removing combustibles from the endangered area
removing smoke and toxic gases by ensuring adequate ventilation
第18题:
to arrive; to rise
arriving; rising
to arrive; rising
having arrived; risen
第19题:
cutting the restraining strap
unscrewing the turnbuckle on the back of the cradle
lifting one end of the raft
pushing the plunger on the center of the hydrostatic release
第20题:
Cutting off the bitter and towing ends of the wire rope
Splicing two wire ropes together
Removing the wire rope from the drum and reversing it so that the towing end becomes the bitter end
Removing the wire rope from the drum and turning it over so that the wire bends in the opposite direction when rolled on a drum
第21题:
Directing the beam of a searchlight at another vessel
A smoke signal giving off orange colored smoke
A whistle signal of one prolonged and three short blasts
International Code Signal PAN spoken over the radiotelephone
第22题:
The storage batteries must be stowed on deck away from the ammunition
The storage batteries must be at least ten horizontal feet away from the methyl acetylene if in the same space
The ammunition must be separated from the methyl acetylene by at least one hold
The methyl acetylene may be stowed on deck or under deck with under deck stowage to be used if available
第23题:
gives up
gives away
gives in
gives off