We were able to () the error and have credited your account.A、track outB、track downC、track overD、track up

题目

We were able to () the error and have credited your account.

A、track out

B、track down

C、track over

D、track up


相似考题
更多“We were able to () the error and have credited your account.A、track outB、track downC、t ”相关问题
  • 第1题:

    WhichcommandwillneedtobeaddedtoExternal_Atoensurethatitwilltakeoverifserial0/0onExternal_Bfails?()

    A.standby1priority130

    B.standby1preempt

    C.standby1trackfastethernet0/0

    D.standby1track10.10.10.1


    参考答案:B

  • 第2题:

    In 17th-century England, astronomy provided methods of keeping______of time that were especially useful for accurate navigation.

    A.investigate
    B.trace
    C.check
    D.track

    答案:D
    解析:
    本题考查近义词辨析。题目意为“在17世纪的英格兰,天文学提供了跟踪时间的方法,这对于精确导航特别有用。”A选项“调查”,B选项“追踪”,C选项“检查”,D选项“跟踪”,keep track of 为固定搭配,意为“记录”,故选项D符合题意。
      

  • 第3题:

    为诸如 和 元素之类的媒介规定外部文本轨道的标签是哪个

    A.<audio>

    B.<embed>

    C.<source>

    D.<track>


    B

  • 第4题:

    The company’s production has been put on the right ______.

    A.orbit
    B.course
    C.route
    D.track

    答案:D
    解析:
    本题考察名词,题目意为“该公司的生产已走上正轨。”A选项意为“轨道、眼眶、势力范围”,B选项意为“课程、航线”,C选项意为“航线、路”,D选项意为“轨道、路线”。固定搭配on the right track ,意为“走上正轨”。
      

  • 第5题:

    模数转化器的时钟抖动是指采样保持器中周期性的采保控制信号从Track转到Hold的时间不确定度


    错误

  • 第6题:

    模数转化器的时钟抖动是指采样保持器中周期性的采保控制信号从Track转到Hold的时间不确定度。


    错误