Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
Smallest partition one processor, as small 1% of a processor may be transferred.
Smallest partition one core, as small 10% of a processor may be transferred.
第1题:
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
第2题:
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
第3题:
A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()
第4题:
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
第5题:
Use the Workload Estimator capacity planning tool.
Use prtconf output from legacy systems.
Use the LPAR Validation Tool.
Use Performance Management Services.
第6题:
Staging and System Migration
Post Implementation Support Handoff Meeting
Detailed Design Development
Staff Training
第7题:
Activate the Trial COD for the processors and run a test to verify outcome
Activate the On/Off COD for the processors and run a test to verify outcome
Use rmss to simulate the processor workload and run a test to verify outcome
Use rmps to simulate the processor workload and run a test to verify outcome
第8题:
Workload Partitions Manager for AIX
Hardware Management Console (HMC) GUI
Integrated Virtualization Manager (IVM)
Advanced System Management Interface (ASMI)
第9题:
Upgrade system firmware to latest level
Upgrade to AIX 5.3
Upgrade HMC to version 6.1
Convert rootvg filesystems to JFS2
第10题:
An administrative VLAN with port 1808
Port 657 which must remain open to TCP/IP and UDP traffic
Network addresses are provided by DHCP services on the network
DHCP on the HMC is required to be on to communicate between LPAR and HMC
第11题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第12题:
It is a teaching guide
It is a blueprint to be strictly followed
It takes into account syllabus and students
It describes in advance what and how to teach
第13题:
A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer satisfaction?()
第14题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第15题:
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
第16题:
A customer has determined they want to install an IBM x445 system in their company. They will be running a large database on the system. In order to determine how many CPUs will be needed to attain the optimum cost-effective solution, which TWO of the following questions should be asked?()
第17题:
'pc' refers to the number of physical processors consumed, while 'ec' refers to the percentage of entitled capacity consumed.
'pc' refers to the 'physical CPUs' and lists how many are left un-allocated, while ec' refers to the 'entitled CPUs' and lists what amount is currently allocated to the LPAR.
'pc' refers to the 'processor count' and reflects how many CPUs are allocated to the LPAR, while 'ec ' refers to the 'extra capacity' and lists how much above the LPAR entitlement is being consumed.
'pc' refers to 'processor cards' and reflects how many MCM modules are actually being used by this LPAR, while 'ec' refers to the 'entitled CPUs'and lists what amount is currently allocated to the LPAR.
第18题:
Two dual-port PCIe adapters
A four-port PCIe Ethernet adapter
Four separate PCIe Ethernet adapters
Two embedded Integrated Virtual Ethernet adapters (IVE)
第19题:
Sales Manual
Announcement Letter
Site and Hardware Planning Information
Adapter, Devices, and Cable Information for Multiple Bus Systems
第20题:
System p servers using similar SAN storage
System p servers must share an HMC
System p servers must have the same level HMC
System p servers with VIOS
第21题:
Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
第22题:
p690 with Dynamic LPAR
Grid of SP switch-attached p5-550s
p690 with Advanced POWER Virtualization
p5-570 with Advanced POWER Virtualization
第23题:
Install a p615 per application.
Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
Install the appropriate solution once the requirements are understood.
Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.