单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()Avmstat and iostat data from the older m

题目
单选题
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
A

 vmstat and iostat data from the older machines

B

 The number of CPUs that were installed in the original machines

C

 Data from Workload Estimator (WLE) and IBM Performance Management (PM)

D

 Performance data that is collected from the new system after it has been put into production


相似考题
参考答案和解析
正确答案: D
解析: 暂无解析
更多“单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A  vmstat and iostat data from the older”相关问题
  • 第1题:

    A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()

    • A、IBM CPW
    • B、IBM rPerf
    • C、SPECint_rate2006
    • D、IDEAS International RPE2

    正确答案:B

  • 第2题:

    Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()

    • A、POWER5 runs in an SMP mode as default
    • B、POWER5 can run in a full system mode the same as the p690
    • C、POWER5 can run in full system mode with the purchase of PLM
    • D、POWER5 can run in a full system mode, but it is in LPAR mode

    正确答案:D

  • 第3题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第4题:

    A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()

    • A、Perform Live Partition Mobility between the two systems.
    • B、Move the boot disks from the old system to the new system.
    • C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
    • D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

    正确答案:D

  • 第5题:

    The customer has an older storage array and is looking to migrate data that currently exists onover 100 73 GB FC drives to a new IBM System Storage DS5020. The customer states that theyhave only 3 TB of data and wants to consolidate on to fewer higher capacity drives. There are sixapplication servers running multiple applications and operating systems utilizing the storagesystem. What would be the next step to accurately identify the new storage configuration?()

    • A、initiate a Disk Magic study
    • B、initiate a Capacity Magic study
    • C、runiometer on the current environment
    • D、utilize the IBM Disk capacity planner toolkit

    正确答案:A

  • 第6题:

    A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()

    • A、Explain to the customer that they need an additional HMC for the POWER5 system.
    • B、Obtain a PO from the customer to purchase additional serial connections to the HMC.
    • C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
    • D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

    正确答案:A

  • 第7题:

    单选题
    A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
    A

    e-Config

    B

    System Planning Tool (SPT)

    C

    IBM Workload Estimator (WLE)

    D

    IBM Performance Monitor (PM)


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
    A

     vmstat and iostat data from the older machines

    B

     The number of CPUs that were installed in the original machines

    C

     Data from Workload Estimator (WLE) and IBM Performance Management (PM)

    D

     Performance data that is collected from the new system after it has been put into production


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()
    A

    Explain to the customer that they need an additional HMC for the POWER5 system.

    B

    Obtain a PO from the customer to purchase additional serial connections to the HMC.

    C

    Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.

    D

    Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
    A

     vmstat and iostat data from the older machines 

    B

     The number of CPUs that were installed in the original machines 

    C

     Data from Workload Estimator (WLE) and IBM Performance Management (PM) 

    D

     Performance data that is collected from the new system after it has been put into production


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
    A

    Perform Live Partition Mobility between the two systems.

    B

    Move the boot disks from the old system to the new system.

    C

    Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.

    D

    Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    The customer has an older storage array and is looking to migrate data that currently exists onover 100 73 GB FC drives to a new IBM System Storage DS5020. The customer states that theyhave only 3 TB of data and wants to consolidate on to fewer higher capacity drives. There are sixapplication servers running multiple applications and operating systems utilizing the storagesystem. What would be the next step to accurately identify the new storage configuration?()
    A

    initiate a Disk Magic study

    B

    initiate a Capacity Magic study

    C

    runiometer on the current environment

    D

    utilize the IBM Disk capacity planner toolkit


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()

    • A、e-Config
    • B、System Planning Tool (SPT)
    • C、IBM Workload Estimator (WLE)
    • D、IBM Performance Monitor (PM)

    正确答案:B

  • 第14题:

    A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

    • A、 vmstat and iostat data from the older machines 
    • B、 The number of CPUs that were installed in the original machines 
    • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
    • D、 Performance data that is collected from the new system after it has been put into production

    正确答案:C

  • 第15题:

    A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

    • A、 PowerVM Standard Edition on POWER6 hardware
    • B、 PowerVM Standard Edition with POWER5 hardware 
    • C、 PowerVM Enterprise Edition with POWER6 hardware
    • D、 PowerVM Enterprise Edition with POWER5 hardware

    正确答案:C

  • 第16题:

    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

    • A、Direct the customer to the Installation Guide for each system to identify the power requirements.
    • B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
    • C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
    • D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

    正确答案:C

  • 第17题:

    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()

    • A、A desk, as it not rack mountable
    • B、Ethernet connections to the POWER5 systems
    • C、Serial connections to the POWER5 systems
    • D、USB connections for the keyboard and mouse

    正确答案:B

  • 第18题:

    单选题
    Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()
    A

    LPAR Validation Tool (LVT)

    B

    Personal Systems Configurator (PSC)

    C

    IBM Configuration for eBusiness (eConfig)

    D

    Advanced System Management Interface (ASMI)


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
    A

    All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later

    B

    The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC

    C

    They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one

    D

    The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()
    A

    IBM CPW

    B

    IBM rPerf

    C

    SPECint_rate2006

    D

    IDEAS International RPE2


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()
    A

    Direct the customer to the Installation Guide for each system to identify the power requirements.

    B

    Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.

    C

    Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.

    D

    Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
    A

     PowerVM Standard Edition on POWER6 hardware

    B

     PowerVM Standard Edition with POWER5 hardware 

    C

     PowerVM Enterprise Edition with POWER6 hardware

    D

     PowerVM Enterprise Edition with POWER5 hardware


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.  Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
    A

    IBM eConfig

    B

    IBM Performance Monitor

    C

    IBM Workload Estimator (WLE)

    D

    IBM System Planning Tool (SPT)


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()
    A

    A desk, as it not rack mountable

    B

    Ethernet connections to the POWER5 systems

    C

    Serial connections to the POWER5 systems

    D

    USB connections for the keyboard and mouse


    正确答案: A