APV features are not supported for some legacy POWER4 adapters
APV will require the most current maintenance level for AIX 5.2
APV features will require that legacy POWER4 adapters be updated with new microcode
The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
第1题:
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?()
第2题:
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()
第3题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第4题:
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
第5题:
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()
第6题:
Include a new HMC in the order to connect to the p5 595
Include a pair of new HMCs in the order to connect to the p5 595
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
第7题:
APV, AIX5.2ML4
AIX5.3 or i5/OS
APV, i5/OS, AIX5.3
APV, AIX5.3 or SuSE9
第8题:
Utilize the integrated 10/100/1000 network interface
Implement Virtual Ethernet to enable inter-partition communication
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
Implement a Point to Point protocol serial communication between the p5 595 serial ports
第9题:
The resources must be unallocated in an LPAR
The microcode on the pSeries must be current
All network adapters on the LPAR must be defined
Network connectivity and name resolution capability between HMC and LPARs
第10题:
Order a new HMC to support the p5 system.
Attach the new p5 system to the existing HMC.
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HMC.
第11题:
Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above.
Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux.
Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system.
Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.
第12题:
Run without recompiling on AIX 5.3
Relink to the 32-bit kernel in order to run the application
Recompile to run on AIX 5.3 because the libraries are in different locations
Recompile 32-bit applications because the compiler flags and versions have changed
第13题:
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
第14题:
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()
第15题:
Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition communication should be discussed with this customer?()
第16题:
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()
第17题:
Which server houses the database partitions in the AIX BCU V2.1? ()
第18题:
Increase memory
Add more adapters
Increase both processors and adapters
Increase the number of processors by 20 - 30%
第19题:
Verify the ISV application runs on AIX 5.2
Power4 to POWER5 upgrades are not supported without a application recompile
Check the placement and size of the boot logical volume and disk space requirements on the S85
AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
第20题:
IBM System p5 570
IBM System p5 575
IBM System p5 590
IBM System p5 595
第21题:
Use alt_disk_install
Backup image to NIM server
Backup using mksysb to DVD-RAM
Apply the upgrade and do not commit
第22题:
APV features are not supported for some legacy POWER4 adapters
APV will require the most current maintenance level for AIX 5.2
APV features will require that legacy POWER4 adapters be updated with new microcode
The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
第23题:
Assign the adapter to an IO Hosting partition
Use AIX 5L affinity to move the application from SUSE to AIX
Use AIX 5.3 drivers to install the adapter in the Linux LPAR
Assign the adapter to an AIX 5.3 partition running Linux Affinity