单选题A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data.

题目
单选题
A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()
A

bring up the secondary site on the target disks

B

suspend and bring up the secondary site on the target disks

C

perform a FlashCopy and bring up the secondary site on the target disks

D

go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks


相似考题
更多“单选题A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. ”相关问题
  • 第1题:

    A bank has requested proposals for a storage solution to upgrade their disaster recoveryprocesses for their System z, UNIX, and Microsoft Windows environment. The solution mustsimulate a multi-site environment and provide the customer the ability to explore Metro Mirror,Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution bestmeets the specified requirements?()

    • A、Two IBM System Storage DS8100 systems
    • B、One IBM System Storage DS8300 with two LPARs
    • C、Two IBM System Storage DS6800 systems in a single rack
    • D、One IBM System Storage DS6800 for System z, and SVC for UNIX and Windows

    正确答案:B

  • 第2题:

    A customer has multiple applications on multiple open platforms in their current environment based on IBM System Storage DS8100. They plan to set up a business continuity solution that meets the objective of zero or little data loss for their business critical data. The customer has indicated that cost is a factor.  What should the storage specialist recommend()

    • A、a DS8700 in the Business Continuity site with a Metro Mirror license
    • B、a DS8700 with SAN Volume Controller in the Business Continuity site
    • C、a DS8700 in the Business Continuity site with Global Copy license
    • D、two new DS5300 servers (production and Business Continuity site) with a Global Copy license

    正确答案:A

  • 第3题:

    A customer is using Metro Mirror to mirror the company inventory database from an IBM System Storage DS8700 at their headquarters to a DS8300 at a remote site. Due to bandwidth concerns they are planning to change the mirroring mode to Global Mirroring. They have asked for assistance. What must be done to help the customer make the change?()

    • A、reboot the secondary system
    • B、rezone the Storage Area Network switches
    • C、break and re-establish the mirror relationship
    • D、increase the buffer credits in the HBAs to reflect the new mirror relationship

    正确答案:C

  • 第4题:

    A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their  business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring.  Which of the following is the business benefit of cascaded replication()

    • A、it is cost efficient, as a single N series or DS8000 can have its controllers split between the  primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third site
    • B、the second site acts as a repeater station so that greater geographical distances can be achieved
    • C、ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systems
    • D、it guarantees data protection by implementing two synchronous copies of the primary site data

    正确答案:C

  • 第5题:

    A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited.  Which solution best meets the specified requirements()

    • A、two IBM System Storage DS8100 systems
    • B、one IBM System Storage DS8300 with LPAR
    • C、two IBM System Storage DS6800 systems in a single rack
    • D、one IBM System Storage DS6800

    正确答案:B

  • 第6题:

    A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows server at the main site with a server at the DR site with a minimal amount of downtime.  Which method will achieve their goals()

    • A、locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the data to the DS6800, and make the data availableto the server
    • B、create RMC relationships for all of the data on the server to the DS6800, shut down the server, and make the data available to the new server
    • C、shut down the server,create RMC relationships for all of the data on the server to the DS6800, and make the data available to the new server
    • D、recover the TSM backups to the DS6800 at the remote site, and make the data available to the new server

    正确答案:B

  • 第7题:

    A customer is currently using EMC’s Mirrorview/A. Their primary site is 400 kilometers away fromthe secondary site, and they have an RPO of 4 hours. What is the IBM equivalent product?()

    • A、Global Copy
    • B、Sync Mirror
    • C、Metro Mirror
    • D、TPC for Replication

    正确答案:A

  • 第8题:

    单选题
    A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()
    A

    bring up the secondary site on the target disks

    B

    suspend and bring up the secondary site on the target disks

    C

    perform a FlashCopy and bring up the secondary site on the target disks

    D

    go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()
    A

    bring up the secondary site on the target disks

    B

    suspend and bring up the secondary site on the target disks

    C

    perform a FlashCopy and bring up the secondary site on the target disks

    D

    go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
    A

    operator training

    B

    cache size of the two clusters

    C

    fibre bandwidth capability between the sites

    D

    number of stacked tape drives attached to each cluster


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()
    A

    Global Copy

    B

    Metro Mirror

    C

    Global Mirror

    D

    Metro/Global Mirror


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has multiple applications on multiple open platforms in their current environment based on IBM System Storage DS8100. They plan to set up a business continuity solution that meets the objective of zero or little data loss for their business critical data. The customer has indicated that cost is a factor.  What should the storage specialist recommend()
    A

    a DS8700 in the Business Continuity site with a Metro Mirror license

    B

    a DS8700 with SAN Volume Controller in the Business Continuity site

    C

    a DS8700 in the Business Continuity site with Global Copy license

    D

    two new DS5300 servers (production and Business Continuity site) with a Global Copy license


    正确答案: D
    解析: 暂无解析

  • 第13题:

    A customer wants to collect performance data from a newly installed IBM System Storage DS8300 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()

    • A、IBM DS Storage Manager
    • B、IBM Tivoli Storage Resource Manager
    • C、IBM TotalStorage Productivity Center for Disk
    • D、IBM TotalStorage Productivity Center for Data

    正确答案:C

  • 第14题:

    A customer wants to collect performance data from a newly installed IBM System Storage DS8700 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()

    • A、IBM DS Storage Manager
    • B、Tivoli Storage Resource Manager
    • C、Tivoli Storage Productivity Center for Disk
    • D、Tivoli Storage Productivity Center for Data

    正确答案:C

  • 第15题:

    A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()

    • A、bring up the secondary site on the target disks
    • B、suspend and bring up the secondary site on the target disks
    • C、perform a FlashCopy and bring up the secondary site on the target disks
    • D、"go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks

    正确答案:D

  • 第16题:

    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()

    • A、compatibility of copy functions
    • B、difference in capacities in the two systems
    • C、cache size discrepancies between the two systems
    • D、the necessity of using two storage management products

    正确答案:A

  • 第17题:

    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()

    • A、Global Copy
    • B、Metro Mirror
    • C、Global Mirror
    • D、Metro/Global Mirror

    正确答案:C

  • 第18题:

    When configuring more than one archival site, which statement is true?()

    • A、The system will first attempt the transfer using the URL configured last
    • B、The system will transfer the configuration to each archival site
    • C、The system will not transfer to a secondary site unless the previous site fails
    • D、The system will transfer using secure copy protocol (SCP) before attempting FTP

    正确答案:C

  • 第19题:

    单选题
    A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows server at the main site with a server at the DR site with a minimal amount of downtime.  Which method will achieve their goals()
    A

    locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the data to the DS6800, and make the data availableto the server

    B

    create RMC relationships for all of the data on the server to the DS6800, shut down the server, and make the data available to the new server

    C

    shut down the server,create RMC relationships for all of the data on the server to the DS6800, and make the data available to the new server

    D

    recover the TSM backups to the DS6800 at the remote site, and make the data available to the new server


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    When configuring more than one archival site, which statement is true?()
    A

    The system will first attempt the transfer using the URL configured last

    B

    The system will transfer the configuration to each archival site

    C

    The system will not transfer to a secondary site unless the previous site fails

    D

    The system will transfer using secure copy protocol (SCP) before attempting FTP


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A customer wants to collect performance data from a newly installed IBM System Storage DS8700 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()
    A

    IBM DS Storage Manager

    B

    Tivoli Storage Resource Manager

    C

    Tivoli Storage Productivity Center for Disk

    D

    Tivoli Storage Productivity Center for Data


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their  business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring.  Which of the following is the business benefit of cascaded replication()
    A

    it is cost efficient, as a single N series or DS8000 can have its controllers split between the  primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third site

    B

    the second site acts as a repeater station so that greater geographical distances can be achieved

    C

    ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systems

    D

    it guarantees data protection by implementing two synchronous copies of the primary site data


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()
    A

    compatibility of copy functions

    B

    difference in capacities in the two systems

    C

    cache size discrepancies between the two systems

    D

    the necessity of using two storage management products


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A customer is using Metro Mirror to mirror the company inventory database from an IBM System Storage DS8700 at their headquarters to a DS8300 at a remote site. Due to bandwidth concerns they are planning to change the mirroring mode to Global Mirroring. They have asked for assistance. What must be done to help the customer make the change?()
    A

    reboot the secondary system

    B

    rezone the Storage Area Network switches

    C

    break and re-establish the mirror relationship

    D

    increase the buffer credits in the HBAs to reflect the new mirror relationship


    正确答案: A
    解析: 暂无解析