单选题A customer has recently acquired an XIV system which is up and running. The next phase of theirdata center refresh is to do a non-disruptive data migration off older EMC equipment and beginmanaging their entire environment which also includes HP and HD

题目
单选题
A customer has recently acquired an XIV system which is up and running. The next phase of theirdata center refresh is to do a non-disruptive data migration off older EMC equipment and beginmanaging their entire environment which also includes HP and HDS storage subsystems. Whatsolution should the storage specialist propose?()
A

 SAN Volume Controller 

B

 IBM Systems Director 

C

 Additional XIV system 

D

 Tivoli Storage Manager


相似考题
更多“单选题A customer has recently acquired an XIV system which is up and running. The next phase of theirdata center refresh is to do a non-disruptive data migration off older EMC equipment and beginmanaging their entire environment which also includes HP and HD”相关问题
  • 第1题:

    XIV的Data Migration功能不支持以下哪种存储设备?()

    • A、EMC Symmetrix DMX4
    • B、HD SAMS2000
    • C、HP EVA 6400
    • D、EMC Centera

    正确答案:B

  • 第2题:

    A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?()

    • A、Perform a full system backup.
    • B、Follow up with the customer, verifying satisfaction.
    • C、Ask their manager to contact the customer.
    • D、Perform a complimentary virus scan.

    正确答案:B

  • 第3题:

    A customer needs 40 TB for Tier 2 Information Lifecycle Management (ILM) data installed on the System z/VM. Their current data center is critically short of floor space.  Which of the following would satisfy the customer requirement()

    • A、a DS5300 withFibre Channel drives 
    • B、an XIV with 15 modules of 1 TB drives 
    • C、a DS5100 with 2 TB SATA drives
    • D、an XIV with 6 modules of 1 TB drives

    正确答案:B

  • 第4题:

    An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()

    • A、the XIV system can be scaled by the addition of modules
    • B、XIV offers thin provisioning for all available host operating systems
    • C、reduced operating costs will pay for another XIV system in less than two years
    • D、the management GUI allows the administrator tovirtualize the entire storage system quickly

    正确答案:A

  • 第5题:

    A large shipping company that is standardized on Fibre Channel storage has just acquired a regional shipping company that is using an IBM XIV system. The large company would like to integrate the XIV system into the environment and manage all data through a single management interface. Which product should be suggested so that all data can be managed?()

    • A、IBM DS8700
    • B、IBM XIV GUI
    • C、IBM System Storage N7600
    • D、IBM SAN Volume Controller (SVC)

    正确答案:D

  • 第6题:

    A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()

    • A、the production environment does not require an outage
    • B、the production environment requires an outage to install the SVC
    • C、the production environment requires an outage to install the DS8700
    • D、the production environment requires an outage to remove the EMC systems

    正确答案:B

  • 第7题:

    The customer has an IBM Enterprise Storage Server 800 coming off lease this year. Themaintenance charges are becoming very expensive and they are looking at a new storage solutionto attach to their mainframe environment. Which of the following solutions would be most costeffective?()

    • A、DS8300
    • B、DS8700 
    • C、Storwize V7000 
    • D、XIV Storage System

    正确答案:B

  • 第8题:

    单选题
    An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
    A

    the XIV system can be scaled by the addition of modules

    B

    XIV offers thin provisioning for all available host operating systems

    C

    reduced operating costs will pay for another XIV system in less than two years

    D

    the management GUI allows the administrator tovirtualize the entire storage system quickly


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A large shipping company that is standardized on Fibre Channel storage has just acquired a regional shipping company that is using an IBM XIV system. The large company would like to integrate the XIV system into the environment and manage all data through a single management interface. Which product should be suggested so that all data can be managed?()
    A

    IBM DS8700

    B

    IBM XIV GUI

    C

    IBM System Storage N7600

    D

    IBM SAN Volume Controller (SVC)


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has recently acquired an XIV system which is up and running. The next phase of theirdata center refresh is to do a non-disruptive data migration off older EMC equipment and beginmanaging their entire environment which also includes HP and HDS storage subsystems. Whatsolution should the storage specialist propose?()
    A

     SAN Volume Controller 

    B

     IBM Systems Director 

    C

     Additional XIV system 

    D

     Tivoli Storage Manager


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Which phase includes the activity of assisting the customer to monitor their Cisco Unified Communications system performance and to respond to trouble reports()
    A

    Maintain

    B

    Deploy

    C

    Operate

    D

    Optimize


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()
    A

    compatibility of copy functions

    B

    difference in capacities in the two systems

    C

    cache size discrepancies between the two systems

    D

    the necessity of using two storage management products


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Which phase includes the activity of assisting the customer to monitor their Cisco Unified Communications system performance and to respond to trouble reports()

    • A、Maintain
    • B、Deploy
    • C、Operate
    • D、Optimize

    正确答案:C

  • 第14题:

    A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC,   HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems.  Which tool compares performance()

    • A、Capacity Magic
    • B、eConfig
    • C、TPC for Disk
    • D、Disk Magic

    正确答案:D

  • 第15题:

    An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()

    • A、 Hot site
    • B、 Warm site
    • C、 Cold site
    • D、 Active failover site

    正确答案:B

  • 第16题:

    A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()

    • A、PowerHA SystemMirror Basic Edition
    • B、PowerHA SystemMirror Express Edition
    • C、PowerHA SystemMirror Standard Edition
    • D、PowerHA SystemMirror Enterprise Edition

    正确答案:D

  • 第17题:

    A customer has recently acquired an XIV system which is up and running. The next phase of theirdata center refresh is to do a non-disruptive data migration off older EMC equipment and beginmanaging their entire environment which also includes HP and HDS storage subsystems. Whatsolution should the storage specialist propose?()

    • A、 SAN Volume Controller 
    • B、 IBM Systems Director 
    • C、 Additional XIV system 
    • D、 Tivoli Storage Manager

    正确答案:A

  • 第18题:

    A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()

    • A、Disk Magic
    • B、TPC for Data
    • C、CLARiiON Procedure Generator
    • D、System Storage Interoperability Center

    正确答案:D

  • 第19题:

    单选题
    A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()
    A

    PowerHA SystemMirror Basic Edition

    B

    PowerHA SystemMirror Express Edition

    C

    PowerHA SystemMirror Standard Edition

    D

    PowerHA SystemMirror Enterprise Edition


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()
    A

    sector size and the amount of production data

    B

    existing RAID levels and the disk drive speed

    C

    sector size and existing RAID levels

    D

    amount of production data and the disk drive speed


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()
    A

     Hot site

    B

     Warm site

    C

     Cold site

    D

     Active failover site


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC,   HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems.  Which tool compares performance()
    A

    Capacity Magic

    B

    eConfig

    C

    TPC for Disk

    D

    Disk Magic


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()
    A

    the production environment does not require an outage

    B

    the production environment requires an outage to install the SVC

    C

    the production environment requires an outage to install the DS8700

    D

    the production environment requires an outage to remove the EMC systems


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?()
    A

    Perform a full system backup.

    B

    Follow up with the customer, verifying satisfaction.

    C

    Ask their manager to contact the customer.

    D

    Perform a complimentary virus scan.


    正确答案: A