What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第1题:
An SMB customer is looking for a low cost, easy to install and configure, entry-level SAN solution to attach to five rack-mounted System x Servers. Which storage solution would be best for this customer?()
第2题:
A customer has a small SAN with both Linux and Windows servers attached to a DS4300 storage server through a redundant fabric. Which of the following is the most important consideration to ensure that this configuration would function properly?()
第3题:
A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()
第4题:
A customer has Direct Attached Storage (DAS) storage for their Windows servers. They are allocating money in next year’s budget for additional storage. Which of the following questions should be asked first to determine the proper storage solution to propose?()
第5题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第6题:
EXP3000 Local Attached Storage Enclosures
DS4000 Series storage solution
DS3000 Series Storage solution
DS4800 Storage Solution
第7题:
contact an IBM Customer Engineer
send a Service Support Representative (SSR)
recommend purchase of a Support Line contract
engage a Field Technical Sales Support (FTSS)
第8题:
thereare no potential risks
the FCIDs of the servers must be changed
the SVC must be shut down during the migration
changing the FCIDs of storage resources will impact some servers
第9题:
A DS4300 Turbo with Fibre Attached Tape Library
A DS4500 with EXP700’s and Fibre Attached Tape Library
A DS4500 with EXP710’s and Fibre Attached Tape Library
A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library
第10题:
What are the plans for Disaster Recovery?
What are the plans for data migration?
Would iSCSI meet your needs?
How much space is available in the current storage systems?
第11题:
N7900
N6040
DS3300
DS3500
第12题:
PowerHA SystemMirror
Peer to Peer Remote Copy
General Parallel File Systems
Parallel Operating Environment
第13题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第14题:
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
第15题:
A medium-sized company with 500 employees has a rapidly growing storage infrastructure with clustered mail, database, and file and print core business applications running on six servers. Using current direct attached SCSI storage pools to each server leads to inefficient utilization of storage space.They also have a backup device attached to each server. They want to consolidate their storage and backup infrastructure into a scalable, high availability and high performance solution. The customer’s top priorities are performance, cost, and availability. Which of the following backup solutions best satisfies the customer requirements?()
第16题:
A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()
第17题:
A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers. The current environment is direct attached storage. The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms. The customer also needs a fibre attached backup solution. Which of the following solutions has the best combination of price and performance?()
第18题:
A
B
C
D
第19题:
A DS4000 SAN with flash copy enabled for volume mirroring
An iSCSI solution with dedicated backup server with SCSI attached tape library
A NAS solution with SCSI direct attached tape library with dedicated backup network
A DS4000 SAN with fibre channel attached tape library solution with dedicated backup zone
第20题:
IBM XIV Storage System
IBM System Storage DS8700
IBM System Storage N6070
IBM System Storage N6210
第21题:
What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第22题:
What is the planned backup solution?
How many people manage the storage system?
What is the total planned capacity?
Is a shared storage subsystem under consideration?
第23题:
Install fiber cards into the servers and add direct attached storage.
Install fiber cards into the servers and implement a SAN solution.
Attach a USB drive to one of the servers.
Add a NAS to the environment
第24题:
Install fiber cards into the servers and add direct attached storage.
Install fiber cards into the servers and implement a SAN solution.
Attach a USB drive to one of the servers.
Add a NAS to the environment.