Configure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00
Configure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00
Configure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1
Configure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
第1题:
An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()
第2题:
An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()
第3题:
An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()
第4题:
You have a server that runs Windows Server 2008 Enterprise Edition. The server has the FailoverClustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster hasa dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 isunable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functionswithout errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()
第5题:
AIX was shut down
A fatal corruption occurred in the gsclvmd daemon
The topsvcs daemon was stopped by the system resource controller
The grpsvcs process was stopped by the system resource controller
第6题:
RG1 is Online RG2 is Online
RG1 is Online RG2 is Offline
RG1 is Offline RG2 is Online
RG1 is Offline RG2 is Offline
第7题:
Create a custom event script to perform the change to CPU entitlement
Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisition
Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisition
Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition
第8题:
Create a custom event script to perform the change to CPU entitlement
Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisition
Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisition
Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition
第9题:
RG1 is Online RG2 is Online
RG1 is Online RG2 is Offline
RG1 is Offline RG2 is Online
RG1 is Offline RG2 is Offline
第10题:
Change the cluster resource group definitions from cascading to rotating,synchronize the cluster,and restart HACMP
Edit the /urs/es/sbin/utilities/clhosts file to reflect he desired node-to-resource group relationships and restart HACMP
Use the clRGMove utility move rg2 o Node ’B’ and rg3 to Node ’C’,then start the cluster manager on Nodes ’B’ and ’C’ with the clstart utility
Disable Inactive Node Takeover,check the node priority list in the resource groups definitions,synchronize the cluster,and start HACMP on Nodes ’B’ and ’C’
第11题:
Remove the MSDTC resource from Group1
Select NODE3 as a preferred owner for Group1
Remove NODE3 as a possible owner from all cluster resources in Group1
Onfigure NODE3 as a possible owner for all cluster resources in Group1
第12题:
rg1 is configured with a delayed fallback timer
Settling time policy has not been configured for rg1
Node1 does not have sufficient resources to support rg1
Node2 is the first in the ’Default Node Priority’ list for resource group rg1
第13题:
An administrator is planning a cluster running applications in 3 separate resource groups. RGA - Database 1 RGB - Web Server RGC - Database 2 Database 1 and Database 2 must be online before the Web Server. All resource groups have a Startup Policyof Online on Home Node Only. Which of the following will ensure that the resource groups are processed in the correct order?()
第14题:
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()
第15题:
An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()
第16题:
An administrator was notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 had been powered off. Upon restarting Node1 the administrator checked the AIXerror log and the cluster.log Which of the following is most likely the cause of the failover?()
第17题:
rg1 is configured with a delayed fallback timer
Settling time policy has not been configured for rg1
Node1 does not have sufficient resources to support rg1
Node2 is the first in the ’Default Node Priority’ list for resource group rg1
第18题:
Set the Serial Acquisition Order
Set the Parallel Acquisition Order
Configure Online on the Same Node Dependency
Configure Online on Different Nodes Dependency
第19题:
Online On All Available Nodes,using a setting timer
Online On Home Node Only,using a fallback timer
Online On Home Node Only,using both setting and fallback timers
Online On First Available Node,using both settling and fallback timers
第20题:
The operating system crashed
A disk failure forced a volume group off line
The System Resource Controller executed a system halt
The topology services daemon has crashed due to an ODM mismatch
第21题:
Configure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00
Configure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00
Configure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1
Configure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
第22题:
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
第23题:
Use thee cascading resource groups where ’rg1’ and ’rg2’ fallover to Node ’B’ and ’rg3’ falls over to Node ’C’
Use Dynamic Node Priority resource groups with a priority chain consisting of Node ’A’ then Node ’B’ then Node ’C’
Use three rotating resource groups with ’rg1’ and ’rg2’ falling over to node ’B’ and ’rg3’ falling over to Node ’C’
Upgrade Nodes ’B’ and ’C’ to be equal to Node ’A in CPU and memory resources to enable the cluster to synchronize three resource groups