Perform a synchronization from a node without the changes.
Apply the cluster snapshot on both nodes while the cluster is running.
Restore HACMP Configuration Database from Active Configuration on the node where the changes weremade
Stop the cluster using the option Unmanage Resource Groups and apply the cluster snapshot on thenode where the changes were made
第1题:
A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?()
第2题:
An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Theadministrator decided the best course of action was to roll back the changes. Prior to the changes beingmade, a cluster snapshot was taken. Which of the following actions will roll back the changes with the least disruption?()
第3题:
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()
第4题:
An HACMP cluster has three nodes of unequal size. The largest node is Node ’A’. The primary application on Node ’A’ has two components. One component is memory intensive, the other is IO intensive. Nodes ’B’ and ’C’ are running web servers and databases that access information produced by applications on Node ’A’. The customer requires the most performance from the primary application and wants all nodes available for fallover processing. Which of the following is the best solution for meeting the customer requirements?()
第5题:
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()
第6题:
Perform a synchronization from a node without the changes.
Apply the cluster snapshot on both nodes while the cluster is running.
Restore HACMP Configuration Database from Active Configuration on the node where the changes weremade
Stop the cluster using the option Unmanage Resource Groups and apply the cluster snapshot on thenode where the changes were made
第7题:
A loss of quorum has occurred on one of the disks in the failed volume group.
Selective fallover caused by an application moves a resource group to a takeover node.
A check is made to ensure at least one complete copy of all data is available in the volume group.
The MISSING_PV=TRUE environment variable has been set causing the volume group to be forced online.
第8题:
Online On All Available Nodes,using a setting timer
Online On Home Node Only,using a fallback timer
Online On Home Node Only,using both setting and fallback timers
Online On First Available Node,using both settling and fallback timers
第9题:
The operating system crashed
A disk failure forced a volume group off line
The System Resource Controller executed a system halt
The topology services daemon has crashed due to an ODM mismatch
第10题:
The resource group DNP has been configured.
The resource group option CWOF has been enabled.
The resource group option Inactive Takeover is set.
A resource group fallback timer has been configured.
第11题:
Remove the MSDTC resource from Group1.
Select NODE3 as a preferred owner for Group1.
Remove NODE3 as a possible owner from all cluster resources in Group1.
Configure NODE3 as a possible owner for all cluster resources in Group1.
第12题:
The resource group containing the IP labels changes to an offline state.
The IP service labels of the failed adapters relocate the surviving adapters.
Nothing because the resource groups wait for the adapters to become active again.
The resource groups containing the IP labels of the failed adapters migrate to a backup node.
第13题:
An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()
第14题:
A resource group, MY_APP, has the following configuration: Resource Group NameMY_APP Participating Node Name(s)Alpha Beta GammaStartup Policy Online On Home Node Only Fallover Policy Fallover To Next Priority Node In The List Fallback Policy Fallback To Higher Priority Node InThe List MY_APP is currently running on node Beta. MY_APP is then moved to node Gamma using C-SPOC.Nodes Alpha and Beta are shutdown and restarted. Node Alpha stabilizes approx 60 seconds before nodeBeta. What happens to the resource group, MY_APP, when nodes Alpha and Beta are restarted?()
第15题:
One service IP label and one volume group are assigned to a resource group in a cluster. An Additional service IP label and volume group need to be added to the resource group. How can this be done with the minimum disruption of the cluster?()
第16题:
A cluster administrator has decided to add a cluster verification to the weekly maintenance scripts That are run from corn. When a cluster verification is performed,which of the following will require a custom verification method?()
第17题:
It moves to Beta
It stays on Gamma
It moves to Alpha
It moves to Alpha, then to Beta
第18题:
AIX was shut down
A fatal corruption occurred in the gsclvmd daemon
The topsvcs daemon was stopped by the system resource controller
The grpsvcs process was stopped by the system resource controller
第19题:
HACMP ODM object classes
HACMP Error Notification
HACMP Topology & Resources
HACMP Application Server Start/Stop scripts
第20题:
Use nodes of equal size.
Create multiple resource groups and use loadlever.
Use dynamic node priority to manage resource groups.
Use an ordered list to manage resource group fallover.
第21题:
Make the changes in HACMP and synchronize the cluster.
It cannot, because changes like this cannot be made while the cluster is running.
Make the changes in HACMP and wait until the next failure for the changes to take affect.
Use the forced option to stop the cluster,make the changes,and restart cluster services.
第22题:
Change the cluster to a rotating design.
Change the Cascading without Fallback flag to true.
Change the Inactive Takeover field to false in the cluster configuration.
Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
第23题:
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
第24题:
Turn off the IP core switch connecting the two nodes.
Issue the command stopsrc -g inetd on the node that has the resource group.
Issue the command sh /etc/rc.tcpclean on the node that has the resource group.
Simultaneously unplug all network cables from the node that has the resource group.