单选题A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-spec

题目
单选题
A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-specific configuration? ()
A

Restore the configuration from NVRAM using the Switch Module Web interface 

B

Back up the configuration of the Ethernet module in bay 1 and restore it to the Ethernet module in bay 2 using the AMM 

C

Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module 

D

Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface


相似考题
更多“单选题A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-spec”相关问题
  • 第1题:

    A customer has purchased a triple channel memory kit containing three DDR3 RAM modules. Theserver the RAM is intended for only has a dual channel capable motherboard. Which of the following is the BEST action to perform?()

    • A、Install only two modules as the RAM has to be installed in pairs
    • B、Purchase one additional RAM module to make it even. Three modules will function as triplechannel and the additional module will be for parity
    • C、Purchase dual channel memory. The triple channel memory may be incompatible with theserver motherboard
    • D、Install the RAM.Two modules will perform as dual channel and one as single channel

    正确答案:C

  • 第2题:

    A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()

    • A、Copper Pass-thru Modules only support 1000Mb line speeds. 
    • B、Spanning Tree has been enabled on the Copper Pass-thru Module. 
    • C、The customer does not have the latest firmware loaded on the Copper Pass-thru Module. 
    • D、The customer is using LS21 Blades 

    正确答案:A

  • 第3题:

    A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()

    • A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.
    • B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.
    • C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.
    • D、The blade servers do not work with the Optical Pass-Thru Module.

    正确答案:B

  • 第4题:

    A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()

    • A、Fiber Channel Switch Module
    • B、Gb Ethernet expansion card
    • C、Myrinet Cluster expansion card
    • D、Ethernet Switch Module

    正确答案:D

  • 第5题:

    A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request of the following?()

    • A、Brocade Enterprise 20-port 8Gb SAN switch module
    • B、Brocade 20-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter
    • C、Brocade Enterprise 10-port 8Gb SAN switch module
    • D、Brocade 10-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter

    正确答案:A

  • 第6题:

    单选题
    A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis. The modules were configured identically. The Ethernet module in bay one was inadvertenly reset to factory defaults. Which solution returns the module to the customer-specific configuration?()
    A

    Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface 

    B

    Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module 

    C

    Back up the configuration of the Ethernet module in bay one and restore it to the Ethernet module in bay two using the AMM 

    D

    Restore the configuration from NVRAM using the Switch Module Web interface


    正确答案: D
    解析: 暂无解析

  • 第7题:

    单选题
    A customer has purchased a triple channel memory kit containing three DDR3 RAM modules. Theserver the RAM is intended for only has a dual channel capable motherboard. Which of the following is the BEST action to perform?()
    A

    Install only two modules as the RAM has to be installed in pairs

    B

    Purchase one additional RAM module to make it even. Three modules will function as triplechannel and the additional module will be for parity

    C

    Purchase dual channel memory. The triple channel memory may be incompatible with theserver motherboard

    D

    Install the RAM.Two modules will perform as dual channel and one as single channel


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()
    A

    Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules

    B

    Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules

    C

    Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules

    D

    Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()
    A

    4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server 

    B

    Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module 

    C

    Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module 

    D

    Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request of the following?()
    A

    Brocade Enterprise 20-port 8Gb SAN switch module

    B

    Brocade 20-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter

    C

    Brocade Enterprise 10-port 8Gb SAN switch module

    D

    Brocade 10-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
    A

    Copper Pass-thru Modules only support 1000Mb line speeds. 

    B

    Spanning Tree has been enabled on the Copper Pass-thru Module. 

    C

    The customer does not have the latest firmware loaded on the Copper Pass-thru Module. 

    D

    The customer is using LS21 Blades 


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    Which statement describes queue and buffer managment in the E-series router?()
    A

    Buffer memory is managed dynamically in the I/O module.

    B

    Buffer memory is managed dynamically in the switch fabric.

    C

    Buffer memory is managed dynamically on egress line modules.

    D

    Buffer memory is managed dynamically on ingress line modules


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request?()

    • A、Brocade Enterprise 20-port 8Gb SAN switch module 
    • B、Brocade 20-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter share 
    • C、Brocade Enterprise 10-port 8Gb SAN switch module 
    • D、Brocade 10-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter

    正确答案:A

  • 第14题:

    A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()

    • A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
    • B、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
    • C、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
    • D、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules

    正确答案:D

  • 第15题:

    A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis. The modules were configured identically. The Ethernet module in bay one was inadvertenly reset to factory defaults. Which solution returns the module to the customer-specific configuration?()

    • A、Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface 
    • B、Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module 
    • C、Back up the configuration of the Ethernet module in bay one and restore it to the Ethernet module in bay two using the AMM 
    • D、Restore the configuration from NVRAM using the Switch Module Web interface

    正确答案:A

  • 第16题:

    The primary line module has failed and the spare line module is nowactive.What occurs,by default,when the primary line module returns to an operational status?()

    • A、The primary line module is inactive for five minutes and then becomes active.
    • B、The primary line module is in standby mode,while the spare line module remains active.
    • C、The primary line module becomes active immediately and the spare line module becomes inactive.
    • D、The primary and spare line modules are active for five minutes,after which time the spare line module becomes inactive.

    正确答案:B

  • 第17题:

    单选题
    A network administrator has installed an N7K-F248-25XP module into an existing chassis. The module is powered on, but the interfaces are all in VDC0. What is the reason for this?()
    A

     The chassis needs an EPLD upgrade to support the new module type.

    B

     The default VDC cannot support F2 modules.

    C

     The interfaces must be allocated into a VDC for F2 modules only.

    D

     The module has failed GOLD diagnostics, and the switch has isolated the ports to protect the integrity of the system.


    正确答案: D
    解析: 暂无解析

  • 第18题:

    单选题
    A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-specific configuration? ()
    A

    Restore the configuration from NVRAM using the Switch Module Web interface 

    B

    Back up the configuration of the Ethernet module in bay 1 and restore it to the Ethernet module in bay 2 using the AMM 

    C

    Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module 

    D

    Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()
    A

    Fiber Channel Switch Module

    B

    Gb Ethernet expansion card

    C

    Myrinet Cluster expansion card

    D

    Ethernet Switch Module


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()
    A

    Support for10Gb internal network

    B

    Support for SSD

    C

    Support for integrated disk drives

    D

    Support for8Gb FC Switch Modules


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request?()
    A

    Brocade Enterprise 20-port 8Gb SAN switch module 

    B

    Brocade 20-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter share 

    C

    Brocade Enterprise 10-port 8Gb SAN switch module 

    D

    Brocade 10-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    The primary line module has failed and the spare line module is nowactive.What occurs,by default,when the primary line module returns to an operational status?()
    A

    The primary line module is inactive for five minutes and then becomes active.

    B

    The primary line module is in standby mode,while the spare line module remains active.

    C

    The primary line module becomes active immediately and the spare line module becomes inactive.

    D

    The primary and spare line modules are active for five minutes,after which time the spare line module becomes inactive.


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()
    A

    4

    B

    3

    C

    2

    D

    8


    正确答案: D
    解析: 暂无解析

  • 第24题:

    单选题
    A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()
    A

    You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.

    B

    Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.

    C

    The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.

    D

    The blade servers do not work with the Optical Pass-Thru Module.


    正确答案: B
    解析: 暂无解析