单选题A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()A Enable e

题目
单选题
A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()
A

Enable each server’s Cool ’n’ Quiet and/or SpeedStep functionality so that processing power is conserved.

B

Enforce auto-shutdown routines on all four servers for after-hours power saving while the office is closed.

C

Consolidate the four servers onto the best two,combining them logically by tasks and memory consumption.

D

Consolidate the four servers onto the most powerful machine using virtualization.


相似考题
参考答案和解析
正确答案: A
解析: 暂无解析
更多“单选题A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()A Enable e”相关问题
  • 第1题:

    A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()

    • A、The Power 550 is licensed for three LPARs only.
    • B、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.
    • C、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory to perform logical partition tasks.
    • D、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.

    正确答案:D

  • 第2题:

    A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()

    • A、iDataPlex with vSphere
    • B、Four x3550 M3 servers,vSphere and racks
    • C、BladeCenter, HX5 blades and vSphere
    • D、One x3950 X5 servers andvSphere

    正确答案:C

  • 第3题:

    A company has had problems with their HVAC system being able to cool their datacenter as theyhave grown. Which of the following could BEST be used to help reduce the load on the HVACsystem?()

    • A、Replacing the CAT5 cables with CAT6 cables
    • B、Replacing traditional racks with water cooled racks
    • C、Turning off non-critical application servers during non-business hours
    • D、Taking the second power supply out of non-critical servers

    正确答案:B

  • 第4题:

    A small business has had unauthorized people enter their server room and damage their servers.Which of the following locks for the door would BEST prevent unauthorized people from accessing the server room?()

    • A、Biometric
    • B、Keypad
    • C、Barcode
    • D、Key lock

    正确答案:A

  • 第5题:

    A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()

    • A、Virtual Ethernet
    • B、Micro-Partitioning
    • C、Virtual I/O Server
    • D、Capped and uncapped partitions

    正确答案:C

  • 第6题:

    A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()

    • A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
    • B、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
    • C、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
    • D、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules

    正确答案:D

  • 第7题:

    Your company has four DNS servers that run Windows Server 2008 R2. Each server has a static IP address. You need to prevent DHCP from assigning the addresses of the DNS servers to DHCP clients. What should you do?()

    • A、Create a new scope for the DNS servers.
    • B、Create a reservation for the DHCP server.
    • C、Configure the 005 Name Servers scope option.
    • D、Configure an exclusion that contains the IP addresses of the four DNS servers.

    正确答案:D

  • 第8题:

    单选题
    A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()
    A

    Create capped partitions for the database servers.

    B

    Create workload partitions for the database servers.

    C

    Create a separate shared processor pool for the database servers.

    D

    Create virtual processors equal to the entitlement for database servers.


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A company has had problems with their HVAC system being able to cool their datacenter as theyhave grown. Which of the following could BEST be used to help reduce the load on the HVACsystem?()
    A

    Replacing the CAT5 cables with CAT6 cables

    B

    Replacing traditional racks with water cooled racks

    C

    Turning off non-critical application servers during non-business hours

    D

    Taking the second power supply out of non-critical servers


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A small business has had unauthorized people enter their server room and damage their servers.Which of the following locks for the door would BEST prevent unauthorized people from accessing the server room?()
    A

    Biometric

    B

    Keypad

    C

    Barcode

    D

    Key lock


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    Your company has four DNS servers that run Windows Server 2008. Each server has a static IP address.You need to prevent DHCP from assigning the addresses of the DNS servers to DHCP clients.What should you do?()
    A

    Create a new scope for the DNS servers.

    B

    Create a reservation for the DHCP server.

    C

    Configure the 005 Name Servers scope option.

    D

    Configure an exclusion that contains the IP addresses of the four DNS servers.


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()
    A

    The Power 550 is licensed for three LPARs only.

    B

    There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.

    C

    There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory to perform logical partition tasks.

    D

    There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.


    正确答案: A
    解析: 暂无解析

  • 第13题:

    our company has four DNS servers that run windows 2008. Each server has a static ip address. You need to prevent dhcp from assigning the addresses of the DNS servers to DHCP clients. What should you do?()

    • A、Create a new scope for the DNS servers.
    • B、Create a reservation for the DHCP serve.
    • C、Configure the 005 name servers scope option.
    • D、Configure an exclusion that contains the ip addresses of the four DNS servers.

    正确答案:D

  • 第14题:

    A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()

    • A、Enable each server’s Cool ’n’ Quiet and/or SpeedStep functionality so that processing power is conserved.
    • B、Enforce auto-shutdown routines on all four servers for after-hours power saving while the office is closed.
    • C、Consolidate the four servers onto the best two,combining them logically by tasks and memory consumption.
    • D、Consolidate the four servers onto the most powerful machine using virtualization.

    正确答案:D

  • 第15题:

    A user has a small network of four computers that they want to connect to a single cable modem. Which of the following devices would allow the user to do this?()

    • A、Four port switch
    • B、Four port wireless router
    • C、Four port WAP
    • D、Four port hub

    正确答案:B

  • 第16题:

    A technician is tasked with clearing all dust covering the fan vents of servers in a small office.Which of the following tools would be the BEST option?()

    • A、Small vacuum
    • B、Air compressor
    • C、Compressed air can
    • D、Paint brush

    正确答案:A

  • 第17题:

    A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()

    • A、Two p670 servers
    • B、Four p650 servers
    • C、Two p5-570 servers
    • D、Four p5-550 servers

    正确答案:C

  • 第18题:

    Your company has four DNS servers that run Windows Server 2008. Each server has a static IP address. You need to prevent DHCP from assigning the addresses of the DNS servers to DHCP clients. What should you do? ()

    • A、 Create a new scope for the DNS servers.
    • B、 Create a reservation for the DHCP server
    • C、 Configure the 005 Name Servers scope option
    • D、 Configure an exclusion that contains the IP addresses of the four DNS servers

    正确答案:D

  • 第19题:

    单选题
    A customer has one mainframe and ten open system servers in their current environment. They plan to add the servers to an IBM DS8700 system with four array sites.  How many extent pools should be created to provide the best resource utilization of the DS8700()
    A

    1

    B

    2

    C

    4

    D

    6


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()
    A

    Two p670 servers

    B

    Four p650 servers

    C

    Two p5-570 servers

    D

    Four p5-550 servers


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    our company has four DNS servers that run windows 2008. Each server has a static ip address. You need to prevent dhcp from assigning the addresses of the DNS servers to DHCP clients. What should you do?()
    A

    Create a new scope for the DNS servers.

    B

    Create a reservation for the DHCP serve.

    C

    Configure the 005 name servers scope option.

    D

    Configure an exclusion that contains the ip addresses of the four DNS servers.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A company has had problems with their HVAC system being able to cool their datacenter as they have grown.  Which of the following could BEST be used to help reduce the load on the HVAC system?()
    A

     Replacing the CAT5 cables with CAT6 cables

    B

     Replacing traditional racks with water cooled racks

    C

     Turning off non-critical application servers during non-business hours

    D

     Taking the second power supplys out of non-critical servers


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()
    A

    Enable each server’s Cool ’n’ Quiet and/or SpeedStep functionality so that processing power is conserved.

    B

    Enforce auto-shutdown routines on all four servers for after-hours power saving while the office is closed.

    C

    Consolidate the four servers onto the best two,combining them logically by tasks and memory consumption.

    D

    Consolidate the four servers onto the most powerful machine using virtualization.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()
    A

    Virtual Ethernet

    B

    Micro-Partitioning

    C

    Virtual I/O Server

    D

    Capped and uncapped partitions


    正确答案: B
    解析: 暂无解析