单选题Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()A Co

题目
单选题
Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
A

Configure a Shared Ethernet Adapter on the Virtual I/O Server.

B

Use the same virtual LAN ID on each LPAR.

C

Set up IP routing through an LPAR on each system.

D

Set up an IP firewall through an LPAR on each system.


相似考题
参考答案和解析
正确答案: B
解析: 暂无解析
更多“单选题Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()A Co”相关问题
  • 第1题:

    Companycom is about to purchase a POWER5 Enterprise server which requires two Ethernet ports and two disks for each of the four LPARs. It has been configured and validated using the IBM eConfig tool. Which of the following is very important to verify in addition to the eConfig validation?()

    • A、Total number of SCSI adapters
    • B、Total number of Ethernet adapters
    • C、Total number of Ethernet adapters and number of SCSI paths per LPAR
    • D、Total number of SCSI paths available and total number of SCSI adapters

    正确答案:C

  • 第2题:

    Companycom will be using the Virtual IO Server to share both FC and Ethernet adapters among multiple LPARs. The customer is using mostly web services in the LPARs. Which of the following should be considered?()

    • A、Shared Ethernet Adapters and Virtual SCSI services require separate Virtual IO Servers.
    • B、Virtualized adapters require essentially the same Virtual IO Server resources regardless of adapter type.
    • C、Shared Ethernet Adapters require significantly more Virtual IO Server resources than Virtual SCSI services.
    • D、Virtual SCSI services require significantly more Virtual IO Server resources than Shared Ethernet Adapters.

    正确答案:C

  • 第3题:

    Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()

    • A、Configure a Shared Ethernet Adapter on the Virtual I/O Server.
    • B、Use the same virtual LAN ID on each LPAR.
    • C、Set up IP routing through an LPAR on each system.
    • D、Set up an IP firewall through an LPAR on each system.

    正确答案:A

  • 第4题:

    A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()

    • A、A VIO server requires a dedicated LHEA port.
    • B、There is a limit of 32 LPARs per virtual LAN.
    • C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
    • D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

    正确答案:A

  • 第5题:

    Which of the following allows the user to have two separate Ethernet networks share the same network adapter?()

    • A、VLAN tags
    • B、EtherChannel
    • C、Virtual Ethernet
    • D、Shared Ethernet Adapter

    正确答案:A

  • 第6题:

    Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node  has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology.  Which of the following best describes the network requirements?()  

    • A、 The service IP addresses must be on a separate subnet and VLAN.
    • B、 The non-service and service IP addresses must be on the same subnet and on the same VLAN.
    • C、 All interfaces on a node must be in different subnets. All subnets must be on the same VLAN. 
    • D、 One non-service and one service IP address must be on the same logical subnet. All interfaces must be on the same VLAN.

    正确答案:D

  • 第7题:

    单选题
    Companycom is about to purchase a POWER5 Enterprise server which requires two Ethernet ports and two disks for each of the four LPARs. It has been configured and validated using the IBM eConfig tool. Which of the following is very important to verify in addition to the eConfig validation?()
    A

    Total number of SCSI adapters

    B

    Total number of Ethernet adapters

    C

    Total number of Ethernet adapters and number of SCSI paths per LPAR

    D

    Total number of SCSI paths available and total number of SCSI adapters


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
    A

    Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be needed

    B

    Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be needed

    C

    Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be needed

    D

    One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
    A

    Implement PowerHA SystemMirror on both VIO servers.

    B

    Configure Etherchannel between the client LPARs and the two VIO servers.

    C

    Configure Network Interface Backup between the two VIO servers and use each VIO server to access the  network.

    D

    Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    Which of the following options applies to virtual Ethernet devices()
    A

    A virtual Ethernet adapter can only connect to other partitions within the same system.

    B

    A virtual Ethernet  adapter needs  to be connected to an external VLAN  capable switch to be able to communicate with other partitions on the same system.

    C

    A partition can support an unlimited number of virtual Ethernet devices.

    D

    A virtual Ethernet adapter in the VIO Server that is part of a SEA should not have the trunk flag set


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
    A

    Configure a Shared Ethernet Adapter on the Virtual I/O Server.

    B

    Use the same virtual LAN ID on each LPAR.

    C

    Set up IP routing through an LPAR on each system.

    D

    Set up an IP firewall through an LPAR on each system.


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?()
    A

    Create two virtual adapters on the client, each one from a separate Virtual IO Server

    B

    Enable dead gateway detection on the client so that the network traffic can be rerouted

    C

    Have a spare network card on standby in the client in case the Virtual IO Server goes down

    D

    Create an etherchannel adapter on the client using one Virtual Ethernet adapter from two  separate Virtual IO Servers


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

    • A、Two dual-port PCIe adapters
    • B、A four-port PCIe Ethernet adapter
    • C、Four separate PCIe Ethernet adapters
    • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

    正确答案:C

  • 第14题:

    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()

    • A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
    • B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
    • C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.
    • D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

    正确答案:B

  • 第15题:

    A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()

    • A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
    • B、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
    • C、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
    • D、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules

    正确答案:D

  • 第16题:

    Company.com has a VIO server with a configured virtual Ethernet adapter and a physical Ethernet adapter with an IP address on their local public network. They want to re-configure the physical Ethernet adapter as Shared Ethernet Adapter. When the mkvdev command is run, the following method error is returned: /usr/lib/methods/cfgsea . Which of the following will most likely resolve the problem?()

    • A、Run cfgdev on the VIO server and re-run the mkvdev command.
    • B、Run chdev -a sea_enable=yes on the physical Ethernet adapter.
    • C、Remove and re-add the virtual Ethernet adapter.
    • D、Remove the IP address from the physical adapter and re-run the mkvdev command.

    正确答案:D

  • 第17题:

    A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each.  When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch.  Which of the following solutions would prevent them from having to buy another network switch or hub?()

    • A、Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.
    • B、Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.
    • C、Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.
    • D、Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.

    正确答案:D

  • 第18题:

    单选题
    Company.com has a VIO server with a configured virtual Ethernet adapter and a physical Ethernet adapter with an IP address on their local public network. They want to re-configure the physical Ethernet adapter as Shared Ethernet Adapter. When the mkvdev command is run, the following method error is returned: /usr/lib/methods/cfgsea . Which of the following will most likely resolve the problem?()
    A

    Run cfgdev on the VIO server and re-run the mkvdev command.

    B

    Run chdev -a sea_enable=yes on the physical Ethernet adapter.

    C

    Remove and re-add the virtual Ethernet adapter.

    D

    Remove the IP address from the physical adapter and re-run the mkvdev command.


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    Companycom will be using the Virtual IO Server to share both FC and Ethernet adapters among multiple LPARs. The customer is using mostly web services in the LPARs. Which of the following should be considered?()
    A

    Shared Ethernet Adapters and Virtual SCSI services require separate Virtual IO Servers.

    B

    Virtualized adapters require essentially the same Virtual IO Server resources regardless of adapter type.

    C

    Shared Ethernet Adapters require significantly more Virtual IO Server resources than Virtual SCSI services.

    D

    Virtual SCSI services require significantly more Virtual IO Server resources than Shared Ethernet Adapters.


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()
    A

    Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules

    B

    Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules

    C

    Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules

    D

    Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each.  When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch.  Which of the following solutions would prevent them from having to buy another network switch or hub?()
    A

    Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.

    B

    Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.

    C

    Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.

    D

    Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
    A

    ImplementPowerHA SystemMirror on both VIO servers.

    B

    ConfigureEtherchannel between the client LPARs and the two VIO servers

    C

    Configure Network Interface Backup between the two VIO servers and use each VIO server to access the  network.

    D

    Implement Shared Ethernet Adapter failover and have all client partitions access the network through the   shared adapters.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
    A

    Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.

    B

    Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.

    C

    Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.

    D

    One switch port will be needed on one switch, a splitter will be needed to split the connection, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.


    正确答案: D
    解析: 暂无解析