The switches are not the same model
You are not using the correct SFP
You are not using correct optical media converters
Configuration should be modified, because the distance is longer
第1题:
You are deploying two core switches, one in each building, 50 km away from each other. The cross-connection between them will be a Layer 2 2-gigabit EtherChannel with an 802.1Q trunk. You configured it correctly but the link does not come up. The port is in the "admin up" state, and the line protocol is in the "down" state. The fiber link is OK. What would be the most likely reason for the link not to come up? ()
第2题:
To which switch or switches should you provide redundant links in order to achieve high availability with reliable fast convergence in the enterprise campus?()
第3题:
You are designing the forest and domain structure to meet the business and technical requirements. Which structure should you use?()
第4题:
You are deploying two core switches, one in each building, 50 km away from each other. The cross-connection between them will be a Layer 2 2-gigabit EtherChannel with an 802.1Q trunk. You configured it correctly but the link does not come up. The port is in the "admin up" state, and the line protocol is in the "down" state. The fiber link is OK. What would be the most likely reason for the link not to come up?()
第5题:
When ordering switches for a new building, which of the following is the BEST way for the technician to determine the number of switches to put in each network closet?()
第6题:
You are designing a DHCP strategy to meet the business and technical requirements. What should you do?()
第7题:
Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be needed
Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be needed
Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be needed
One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed
第8题:
The switches are not the same model
You are not using the correct SFP
You are not using correct optical media converters
Configuration should be modified, because the distance is longer
第9题:
A single forest with one tree, and one domain
A single forest with one tree two domain
A single forest with two trees, each with a single domain
Two forests, each with a single tree and a single domain
Two forests, each with two trees, with a single domain in each tree.
第10题:
Set each end of the trunk line to IEEE 802.1Q encapsulation.
Set the same VTP management domain name on both switches.
Set all ports on the two switched as access ports.
Configure one of the two switches as a VTP server.
Connect the two switches using a rollover cable.
Use a router to forward VTP traffic between the VLANs.
第11题:
Install and Configure one DHCP server in Atlanta and one DHCP server in each branch office.
Install and Configure two DHCP servers in Atlanta and two DHCP servers in each branch office.
Create one scope on each DHCP server. Specify one DHCP server to always update DNS records. Configure the scope to assign half of the IP addresses available to each office.
Create two scopes on each DHCP server. Specify one DHCP server to update DNS records only for client computers that request it. Specify a second DHCP server to never update DNS records.
第12题:
Verify that different native VLANs exist between two switches for security purposes.
Verify that the VLAN was added on all switches with the use of the show vlan command.
Verify that the switch is configured to allow for trunking on the switch ports.
Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
第13题:
To configure the VLAN trunking protocol to communicate VLAN information between two switches, what two requirements must be met?()
第14题:
You are troubleshooting an issue which is causing full-sized packets entering the MPLS cloud be dropped. You have discovered that one of the switches in the MPLS core is not a Cisco switch, but otherwise the MPLS MTU size is set to 1508 bytes on the routers. Based on this information, which of these may be the reason the packets are being dropped?()
第15题:
A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
第16题:
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()
第17题:
A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
第18题:
Your company purchases 15 new 64-bit servers as follows: èFive of the servers have a single processor. èFive of the servers have a single dual core processor. èFive of the servers have two quad core processors. You plan to deploy Windows Server 2008 R2 on the new servers by using Windows Deployment Services (WDS). You need to recommend a WDS install image strategy that meets the following requirements: Minimizes the number of install images Supports the deployment of Windows Server 2008 R2 What should you recommend?()
第19题:
You must set each end of the trunk line to IEEE 802.1e encapsulation.
You must set the same VTP management domain name on both switches.
You must set all ports on the two switches as access ports.
You must configure one of the switches as a VTP server.
You must use a rollover cable to connect the two switches.
第20题:
A Catalyst switch cannot have ISL and IEEE 802.1q trunks enabled.
All Catalyst switches support ISL trunking.
A Catalyst switch will report giants if one side is configured for ISL while the other side is not.
ISL trunking requires that native VLANs match.
None of the other alternatives apply
第21题:
A single forest with one tree, and one domain
A single forest with one tree two domain
A single forest with two trees, each with a single domain
Two forests, each with a single tree and a single domain
Two forests, each with two trees, with a single domain in each tree
第22题:
The switches are not the same model.
You are not using the correct SFP.
You are not using correct optical media converters.
Configuration should be modified, because the distance is longer.
第23题:
Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.
One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.
第24题:
to a core switch running Cisco NSF and SSO from redundant distribution switches connected with a Layer 2 link
to a core switch running Cisco NSF and SSO from redundant distribution switches connected with a Layer 3 link
to two core switches from redundant distribution switches connected with Layer 2 link
to two core switches from redundant distribution switches connected with Layer 3 link
to two core switches running Cisco NSF and SSO from two redundant distribution switches running Cisco NSF and SSO