You completed the development of a new application and want to create a new domain in a new environment for functional testing. You want to have the same settings for your new domain as your old domain, with the option of changing the configuration in the new target environment. Which two actions should you execute?()
第1题:
Part of the signature of the String class is:
class String {
....
};
Other part of signature and implementation is completed by you.
第2题:
A.Completed,Deposited,Released,Shipped
B.Completed,Released,Shipped,Deposited
C.Deposited,Released,Shipped,Completed
D.Released,Shipped,Completed,Deposited
E.Released,Shipped,Deposited,Completed
第3题:
The customer asks your project to be completed 6 months earlier than planned.You think this target can be reached by-overlapping project activities. This approach is known as ().
A.balance engineering
B.fast-tracking
C.leveling
D.crashing
第4题:
This diploma _____ that you have completed high school.
[A] proves
[B] certifies
[C] secures
[D] approves
第5题:
第6题:
Which of the following is the correct sequence of order states during normal order processing?()
第7题:
You work as a database administrator for Supportcenter.cn. In your production database, the size of Database Buffer Cache needs to be increased immediately for the current as well as future instances of the database. The Oracle instance has been configured to accommodate any changes in the size of the memory structures. At this is production database, you want to accomplish this task with no impact on the user’s connections. Which activity must you have completed before accomplishing this task?()
第8题:
You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a stored procedure. The stored procedure implements a database maintenance process. A SQL Server Agent job should be created to that runs the stored procedure. Besides this, you must make sure that after it is completed successfully, the job is removed. What should you do? ()
第9题:
take the Java sources (.java) files and include them in your $APPL_TOP
take the Java sources (.java) files and include them in your CLASSPATH
take the Java classes (.class) files and include them in your $APPL_TOP
take the Java classes (.class) files and include them in your CLASSPATH
第10题:
immediately anchor your vessel and arrange for repairs to the system
moor your vessel at the nearest dock available and arrange for repairs to the system
arrange for the repair of the system to be completed within 48 hours
exercise due diligence to restore the system at the earliest practicable time
第11题:
A primary key must have been created.
A mapping table must have been created.
An overflow tablespace must have been specified.
The PCTTHRESHOLD option must have been specified.
第12题:
have completed
complete
am completing
will have completed
第13题:
Tell about the course you completed in university.
第14题:
A.
B.
C.
D.
第15题:
Refer to the exhibit. You have completed an OSPF implementation, and you are verifying OSPF operation. You notice that router A and router B are stuck in the two - way state. From the show ip ospf interface command output, what is the cause of this issue?()
A. All OSPF implementations must have at le ast one interface in area 0.
B. You are attempting to run in the broadcast mode over an NBMA interface.
C. Both routers are configured to function as a BDR; therefore, there is no DR router.
D. Someone has changed the OSPF router ID; therefore you must clear the OSPF process.
E. The OSPF priority is set to 0 on both routers; therefore neither can become the DR.
第16题:
You are berthed at a cargo facility where you have just completed discharging a dangerous cargo from your barge.You must complete topside repairs on the barge involving hot work before sailing.Which statement is TRUE ________.
A.You can make repairs with permission of the facility owner since you are empty and the cargo is on the facility
B.The repair area must be inspected by a marine surveyor to ensure that it can be done safely
C.Hot work repairs at such a facility are prohibited
D.The Captain of the Port may give specific approval to make hot work repairs
第17题:
第18题:
You completed your workflow definition. You want to save a copy of the definition to the file system for source control purposes. How does Oracle Workflow Builder save that file?()
第19题:
You receive a support call from a user complaining that every time she sends a print job to a printer, she receives a confirmation message telling her that the print job has been completed. She asks you whether it can be disabled. How can you configure this?()
第20题:
Average row size
Last analyzed date
Size of table in bytes
Size of table in database blocks
Number of free blocks in the free list
Number of extents present in the table.
第21题:
as a flat file
as a BPEL-compiled definition
as an XML file with an associated document type definition (DTD)
as an XML file without an associated document type definition (DTD)
第22题:
Schedule a normal backup every Sunday. Schedule incremental backups every Monday through Saturday.
Schedule a normal backup every Sunday. Schedule differential backups every Monday through Saturday.
Schedule a copy backup every day.
Schedule a normal backup every day.
第23题:
Restore using the tapes from Friday, Saturday, Sunday, Monday and Wednesday.
Restores using only Fridays tape
Restore using the tapes from Thursday, Friday, Saturday, Sunday and Tuesday.
Restore using the tapes from Friday and Tuesday.
Restore using the tapes from Tuesday and Thursday.
第24题:
The rebalancing of the disk group would be stopped.
The rebalancing of the disk group would be completed as fast as possible.
The command would result in an error because the value of POWER cannot be 0.
The rebalancing of the disk group would be completed without affecting the disk group DG3.
The command would result in an error because the disk groups cannot be manually rebalanced.