更多“请解释Once on demurrage always on demurrage这一术语的含义是什么?”相关问题
  • 第1题:

    Owner shall have a lien on the cargo for freight,dead-freight,demurrage and damages for detention.It means that ______.

    A.Owner will not deliver the cargo if freight not paid

    B.Owner will keep the dead-freight until the cargo has been delivered

    C.Owner will keep the demurrage as soon as the cargo be delivered

    D.Owner shall have no right of detention for the damaged cargo to be delivered


    正确答案:A

  • 第2题:

    翻译once on demurrage always on demurrage


    正确答案:一旦滞期,永远滞期

  • 第3题:

    翻译:Neither the consignee nor the holder of the bill of lading shall be liable for the demurragedead freight and all other expenses in respect of loading occurred at the loading port unless the bill of lading clearly states that the aforesaid demurragedead freight and all other expenses shall be borne by the consignee and the holder of the bill of lading。


    正确答案:收货人、提单持有人不承担在装货港发生的滞期费、亏舱费和其他与装货有关的费用,但是提单中明确载明上述费用由收货人、提单持有人承担的除外

  • 第4题:

    请解释产品整体概念的含义是什么?


    正确答案: 在买方市场的条件下,顾客愿意花钱购买的是产品的整体。所谓整体产品概念,是把产品分为5个层次。
    1、核心利益核心利益(core benefit)是指产品能提供给顾客的基本服务和利益,这是最基本的和实质性的内容,是顾客需求的中心内容。
    2.基础形式产品基础形式是核心利益借以实现的形式,即向市场提供产品的实体和服务的形象。
    3.期望价值在产品整合的第3个层次,营销者准备了一个期望价值,即购买者购买产品时通常希望默认的一组属性和条件。
    4.附加内容在产品整合的第4个层次,营销者准备了一个附加内容,即包括了增加的服务和利益,它们能把公司的提供物与竞争者的提供物区别开来。
    5.潜在能力产品整合的第5个层次是潜在能力,即在将来该产品最终可能会实现的内容。如果附加内容包含着产品的今天,则潜在力指出了它可能的演变。许多成功的公司为它们的提供物,不仅添加了对顾客的满意,而且添加了对顾客的愉悦。愉悦是对提供物添加了令购买者出乎意料的惊喜。如旅馆客人在枕下发现了糖果,使人们感到旅馆在用特殊的方法对待你。
    总之,以上这5个层次结合起来,就是产品整合概念。它包括有形的与无形的、物质的与非物质的、核心的与附加的等多方面的内容,它不仅要给予顾客以生理上、物质上的满足,而且要给予心理上、精神上的满足。产品整体概念体现了以顾客为中心的现代营销观念,只有懂得产品整体的含义,才能真正贯彻现代营销观念的要求,全面满足顾客需要,同时也才能提高企业的声誉和效益。

  • 第5题:

    滞期费(demurrage)是指在规定的装卸期限内租船人未能完成装卸作业,租船人对超过的时间应向船方支付一定的款项


    正确答案:正确

  • 第6题:

    In marine time chartering, the following()terms are normally appeared in the time charter party.

    • A、freight payment
    • B、payment of hire
    • C、trading limits
    • D、demurrage

    正确答案:B,C

  • 第7题:

    翻译:Demurrage()


    正确答案:滞期费

  • 第8题:

    问答题
    翻译once on demurrage always on demurrage

    正确答案: 一旦滞期,永远滞期
    解析: 暂无解析

  • 第9题:

    问答题
    翻译:Neither the consignee nor the holder of the bill of lading shall be liable for the demurragedead freight and all other expenses in respect of loading occurred at the loading port unless the bill of lading clearly states that the aforesaid demurragedead freight and all other expenses shall be borne by the consignee and the holder of the bill of lading。

    正确答案: 收货人、提单持有人不承担在装货港发生的滞期费、亏舱费和其他与装货有关的费用,但是提单中明确载明上述费用由收货人、提单持有人承担的除外
    解析: 暂无解析

  • 第10题:

    单选题
    Owner shall have a lien on the cargo for freight,dead-freight,demurrage and damages for detention.It means that().
    A

    Owner will not deliver the cargo if freight not paid

    B

    Owner will keep the dead-freight until the cargo has been delivered

    C

    Owner will keep the demurrage as soon as the cargo be delivered

    D

    Owner shall have no right of detention for the damaged cargo to be delivered


    正确答案: A
    解析: 暂无解析

  • 第11题:

    问答题
    《2000国际贸易术语解释通则》中,CIF术语的含义是什么?买卖双方的责任各有哪些?

    正确答案: CIF是指卖方负责租船或订舱,在合同规定的装运日期或期间内将货物 装上运往指定目的港的船舶,负担货物装上船前的一切费用和风险,支付运费,办理保险,支付保险费。
    卖方的责任:
    ①负责租船或订舱,在合同规定的装运日期或期间内在装运港将货物装上船,支付至目的港的运费,并给予买方充分的通知。
    ②负责货物在装运港越过船舷为止的一切风险。
    ③负责办理货物运输保险,支付保险费。
    ④负责办理出口手续,提供出口许可证,支付出口关税和费用。负责提 供商业发票、清洁的、可转让的已装船提单和保险单。
    买方的责任:
    ①负责除运费和保险费以外的,货物在海运途中发生的一切费用以及卸货
    ②负责货物在装运港越过船舷时的一切风险
    ③按照合同规定支付货款,并接受符合合同的单据。
    ④在指定目的港收取货物,自负风险及费用,办理进口手续。
    解析: 暂无解析

  • 第12题:

    单选题
    The ship will be()demurrage soon.
    A

    at

    B

    for

    C

    in

    D

    on


    正确答案: C
    解析: 暂无解析

  • 第13题:

    In accordance with GENCON,Owners shall have a lien on ______ for detention.

    A.the cargo for freight,dead-freight,demurrage and damages

    B.dispatch money

    C.premium if paid

    D.total and/or partial loss of and/or damage to the vessel


    正确答案:A

  • 第14题:

    下列哪个表达法表示滞期非连续计算()

    • A、pe rlike day
    • B、once on demurrage always on demurrage
    • C、all time saved
    • D、ABC都不对

    正确答案:A

  • 第15题:

    翻译:Time Sheet 或者 Despatch Money /Demurrage Calculation Sheet


    正确答案:装卸时间计算表

  • 第16题:

    《2000国际贸易术语解释通则》中,CIF术语的含义是什么?买卖双方的责任各有哪些?


    正确答案:CIF是指卖方负责租船或订舱,在合同规定的装运日期或期间内将货物 装上运往指定目的港的船舶,负担货物装上船前的一切费用和风险,支付运费,办理保险,支付保险费。
    卖方的责任:
    ①负责租船或订舱,在合同规定的装运日期或期间内在装运港将货物装上船,支付至目的港的运费,并给予买方充分的通知。
    ②负责货物在装运港越过船舷为止的一切风险。
    ③负责办理货物运输保险,支付保险费。
    ④负责办理出口手续,提供出口许可证,支付出口关税和费用。负责提 供商业发票、清洁的、可转让的已装船提单和保险单。
    买方的责任:
    ①负责除运费和保险费以外的,货物在海运途中发生的一切费用以及卸货
    ②负责货物在装运港越过船舷时的一切风险
    ③按照合同规定支付货款,并接受符合合同的单据。
    ④在指定目的港收取货物,自负风险及费用,办理进口手续。

  • 第17题:

    In marine voyage chartering, the following()terms are normally appeared in the voyage charter party.

    • A、freight payment
    • B、hire payment
    • C、lay-time
    • D、demurrage

    正确答案:A,D

  • 第18题:

    Demurrage charges()from $ 5 to $ 50 per day across countries.

    • A、range
    • B、altered
    • C、separated
    • D、differed

    正确答案:A

  • 第19题:

    单选题
    下列哪个表达法表示滞期非连续计算()
    A

    pe rlike day

    B

    once on demurrage always on demurrage

    C

    all time saved

    D

    ABC都不对


    正确答案: A
    解析: 暂无解析

  • 第20题:

    填空题
    翻译:Demurrage()

    正确答案: 滞期费
    解析: 暂无解析

  • 第21题:

    单选题
    If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders()liable to pay demurrage or damages for detention,as the case may be.
    A

    himself

    B

    the owner

    C

    him

    D

    the shipper


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    The cesser clause mainly purports to relieve()from paying demurrage.
    A

    the Shipowner

    B

    the carrier

    C

    the shipper

    D

    the Charterer


    正确答案: C
    解析: 暂无解析

  • 第23题:

    问答题
    翻译:Time Sheet 或者 Despatch Money /Demurrage Calculation Sheet

    正确答案: 装卸时间计算表
    解析: 暂无解析