Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()
第1题:
An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()
第2题:
An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()
第3题:
An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()
第4题:
An administrator wants to use the online planning worksheets as an aid to configuring a PowerHA cluster.Which PowerHA fileset would the administrator need to install in order to obtain this tool?()
第5题:
During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?()
第6题:
You are the network administrator for your company. The network consists of a single Active Directory domain. All computers on the network are members of the domain. You administer a three-node Network Load Balancing cluster. Each cluster node runs Windows Server 2003 and has a single network adapter. The cluster has converged successfully. You notice that the nodes in the cluster run at almost full capacity most of the time. You want to add a fourth node to the cluster. You enable and configure Network Load Balancing on the fourth node. However, the cluster does not converge to a four-node cluster. In the System log on the existing three nodes, you find the exact same TCP/IP error event. The event has the following description: "The system detected an address conflict for IP address 10.50.8.70 with the system having network hardware address 02:BF://0A:32:08:46." In the System log on the new fourth node, you find a similar TCP/error event with the following description: "The system detected an address conflict for IP address 10.50.8.70 with the system having network hardware address 03:BF://0A:32:08:46." Only the hardware address is different in the two descriptions. You verify that IP address 10.50.8.70 is configured as the cluster IP address on all four nodes. You want to configure a four-node Network Load Balancing cluster. What should you do? ()
第7题:
Perform a synchronization from a node without the changes.
Apply the cluster snapshot on both nodes while the cluster is running.
Restore HACMP Configuration Database from Active Configuration on the node where the changes weremade
Stop the cluster using the option Unmanage Resource Groups and apply the cluster snapshot on thenode where the changes were made
第8题:
Perform a graceful takeover one node at a time and apply the updates.
Perform the updates on all nodes simultaneously using C-SPOC utilities.
Perform the updates on node at a time with the cluster software active.
Perform a graceful stop of all cluster nodes and apply updates to all nodes.
第9题:
Identify necessary operating system updates
Implement the change
Document the change
Schedule system down time
第10题:
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
第11题:
The contents of a shared folder on the active node should be encrypted by using Encrypting File System (EFS)
You should restore a backup to the active node
You should get rid of the shared array from the active node
From the active node, you have to uplug the network cable(s)
第12题:
Apply the new license to the passive node of the cluster.
Configure an external load balancer to hold the V IP.
Disable the active node in the cluster.
Remove the IF-MAP server configuration.
第13题:
An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()
第14题:
An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Theadministrator decided the best course of action was to roll back the changes. Prior to the changes beingmade, a cluster snapshot was taken. Which of the following actions will roll back the changes with the least disruption?()
第15题:
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()
第16题:
An administrator has a two-node PowerHA cluster in a mutual takeover configuration. He needs to updatefrom 5.5 service pack 1 to 5.5 service pack 2. Which of the following actions will perform the updates with norisk of disruption to applications running in the cluster?()
第17题:
You are an administrator of an active/passive cluster of MAG Series devices running in mixed- mode configuration (IF-MAP server and authenticating users). The active user count is quickly approaching the maximum limit of the cluster. You have been directed to reconfigure the cluster to an active/active cluster and add a new license to increase the total number of active users the cluster can support. What must you do before changing the cluster configuration?()
第18题:
You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 cluster. According to the company requirement, the failover response of the cluster has to be tested. The company assigns this task to you. On the cluster, you have to implement a manual failover. What should you do? ()
第19题:
All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.
All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.
All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.
All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
第20题:
clstat
clinfo
cldiag
clverify
第21题:
None,everything can be done with the cluster active.
Minimal downtime will be required to import the volume groups.
Several hours are required for testing before final synchronization.
Minimal downtime will be required to connect and test the serial network.
第22题:
Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.
Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.
On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.
On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
第23题:
There is a DARE lock in place
A PowerHA migration is in progress
Cluster services is not active on the other node
The other cluster node is running a different version of RSCT