An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()
第1题:
123 Which of the following constitute Juran's "quality trilogy":
A. planning, inspection, control.
B. planning, improvement, control.
C. planning, organization, control.
D. product, price, customer.
E. design, build, deliver.
第2题:
A.material requirement planning。
B.management requirement planning。
C.manufacturing resource planning。
D.material revenue planning。
E.Material risk planning。
第3题:
A. before-class planning and after-class planning
B. before-class preparation and after-class feedback
C. before-class planning and after-class reflection
D. macro planning and micro planning
第4题:
A network administrator is planning a network installation for a large organization.The design requires 100 separate subnetworks,so the company has acquired a Class B network address.What subnet mask will provide the 100 subnetworks required, if 500 usable host addresses are required per subnet?()
第5题:
You are planning a new VLAN-based network solution. What is one item you should consider when creating your implementation plan as it concerns VLANs?()
第6题:
An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()
第7题:
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第8题:
An administrator wants to use the online planning worksheets as an aid to configuring a PowerHA cluster.Which PowerHA fileset would the administrator need to install in order to obtain this tool?()
第9题:
Follow the pre-installation plan and procedures.按照预先安装计划和程序。
Review the system logs to check for errors.
Notify all users that the old system will be taken offline.
Apply all security updates to the system.
第10题:
255.255.240.0
255.255.248.0
255.255.252.0
255.255.254.0
255.255.255.0
255.255.255.192
第11题:
An additional switch for the new HMC
Asynchronous adapters on the new HMC
The two 570 servers are directly connected to the new HMC
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第12题:
None,everything can be done with the cluster active.
Minimal downtime will be required to import the volume groups.
Several hours are required for testing before final synchronization.
Minimal downtime will be required to connect and test the serial network.
第13题:
116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.
B. Manpower leveling.
C. Resource limited planning.
D. Manpower planning.
E. Manpower contingency planning.
第14题:
A.macro planning and micro planning
B.day by day and one week
第15题:
第16题:
计划(Planning)
第17题:
()is the management system to control the material consumed, reduce inventory in the manufacture company.
第18题:
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第19题:
An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()
第20题:
During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?()
第21题:
An additional switch for the new HMc
Asynchronous adapters on the new HMc
The two 570 servers are directly connected to the new HMc
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
第22题:
Identify necessary operating system updates
Implement the change
Document the change
Schedule system down time
第23题:
cluster.es.haw
cluster.es.worksheets
cluster.es.tools.worksheets
cluster.es.server.worksheets