A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第1题:
除POWER595外,POWER Systems服务器一般内置的硬盘接口为什么规格?()
第2题:
我是一名IBM合作伙伴的销售代表,非常想通过掌握销售IBM POWER Systems 服务器来提升业绩,我可以做的是()
第3题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第4题:
Micro-Partitioning can be defined as().
第5题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第6题:
What is an advantage of using an HMC rather than IVM for system management?()
第7题:
A Power 770 customer needs to add additional I/O adapters. There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()
第8题:
与HP rx8640相比,哪一款POWER Systems服务器性能即可胜出?()
第9题:
A desk, as it not rack mountable
Ethernet connections to the POWER5 systems
Serial connections to the POWER5 systems
USB connections for the keyboard and mouse
第10题:
Identify which systems are the most critical and bring them up by level of importance.
Retrieve the latest backup tapes for immediate system restore using the GFS rotation.
Identify the least critical systems and then power those systems on first.
Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
第11题:
POWER520即可
需要POWER550
需要POWER570
需要POWER595
第12题:
POWER520即可
需要POWER550
需要POWER570
需要POWER595
第13题:
Where will an administrator find documents in PDF format that include detailed architecture and step-by-step installation instructions for Power servers?()
第14题:
What is a key advantage of the POWER5 technology over all other competitive offerings?()
第15题:
与Sun SPARC Enterprise M4000相比,哪一款POWER Systems服务器性能即可胜出?()
第16题:
A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()
第17题:
客户会在什么样的环境下用POWER Systems服务器?或者说什么样的客户需要POWER Systems服务器?()
第18题:
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
第19题:
关于POWER Systems和x系列服务器,下列陈述错误的是()
第20题:
A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()
第21题:
System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
第22题:
IBM CPW
IBM rPerf
SPECint_rate2006
IDEAS International RPE2
第23题:
POWER520即可
需要POWER550
需要POWER570
需要POWER595
第24题:
better control capabilities
less maintenance and repair
fewer personnel needed during jacking
less preload needed