A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()A、ITSO RedbooksB、Facts and Fea

题目

A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()

  • A、ITSO Redbooks
  • B、Facts and Features
  • C、System Planning Tool
  • D、Fix Level Recommendation Tool

相似考题
更多“A Power Systems ”相关问题
  • 第1题:

    除POWER595外,POWER Systems服务器一般内置的硬盘接口为什么规格?()

    • A、ULTRA320 SCSI
    • B、SAS
    • C、FC-AL
    • D、IDE

    正确答案:B

  • 第2题:

    我是一名IBM合作伙伴的销售代表,非常想通过掌握销售IBM POWER Systems 服务器来提升业绩,我可以做的是()

    • A、参加IBM 的市场活动,从中拿到最及时的讯息
    • B、找IBM 当地的Sales 谈一谈,了解IBM POWER Systems 渠道合作和奖励计划
    • C、浏览IBM 的中文网站,注册成为会员,免费得到电子资料
    • D、参加IBM POWER Systems 销售培训,学习产品销售知识
    • E、以上都可以

    正确答案:E

  • 第3题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第4题:

    Micro-Partitioning can be defined as().

    • A、multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/2 of a physical processor's resource. 
    • B、multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/100th of a physical processor's resource. 
    • C、an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.3 that allows multiple partitions to share the processing power of a set of physical processors. 
    • D、an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.2 or 5.3 that allows multiple partitions to share the processing power of a set of physical processors.

    正确答案:C

  • 第5题:

    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

    • A、Order a new HMC to support the p5 system.
    • B、Attach the new p5 system to the existing HMC.
    • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
    • D、Do nothing.  This system does not require an HMC.

    正确答案:A

  • 第6题:

    What is an advantage of using an HMC rather than IVM for system management?()

    • A、Support for a single VIO Server environment
    • B、Adapters can be dedicated or virtual for each LPAR environment
    • C、Interfaces with Systems Director to manage the Power Systems servers
    • D、Supports multiple Power Systems servers from a single point of control

    正确答案:D

  • 第7题:

    A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()

    • A、I/O Planning Guide
    • B、Power Systems data sheet
    • C、Power Systems Facts and Features
    • D、Run FLRT to recommend I/O features

    正确答案:C

  • 第8题:

    与HP rx8640相比,哪一款POWER Systems服务器性能即可胜出?()

    • A、POWER520即可
    • B、需要POWER550
    • C、需要POWER570
    • D、需要POWER595

    正确答案:C

  • 第9题:

    单选题
    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()
    A

    A desk, as it not rack mountable

    B

    Ethernet connections to the POWER5 systems

    C

    Serial connections to the POWER5 systems

    D

    USB connections for the keyboard and mouse


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()
    A

     Identify which systems are the most critical and bring them up by level of importance.

    B

     Retrieve the latest backup tapes for immediate system restore using the GFS rotation.

    C

     Identify the least critical systems and then power those systems on first.

    D

     Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    与HPrx3600相比,哪一款POWER Systems服务器性能即可胜出?()
    A

    POWER520即可

    B

    需要POWER550

    C

    需要POWER570

    D

    需要POWER595


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    与SUN SPARC Enterprise T5220相比,哪一款POWER Systems服务器性能即可胜出?()
    A

    POWER520即可

    B

    需要POWER550

    C

    需要POWER570

    D

    需要POWER595


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Where will an administrator find documents in PDF format that include detailed architecture and step-by-step installation instructions for Power servers?() 

    • A、AIX Fix Central
    • B、IBM Developer Works
    • C、IBM Systems Software Information Center
    • D、IBM Systems Hardware Information Center

    正确答案:D

  • 第14题:

    What is a key advantage of the POWER5 technology over all other competitive offerings?()

    • A、POWER5 supports multiple operating systems.
    • B、POWER5 supports more nodes in a clustered environment.
    • C、POWER5 hypervisor has significantly less overhead than hardware partitioning.
    • D、POWER5 has greater granularity of resources such as memory, processors and I/O.

    正确答案:D

  • 第15题:

    与Sun SPARC Enterprise M4000相比,哪一款POWER Systems服务器性能即可胜出?()

    • A、POWER520即可
    • B、需要POWER550
    • C、需要POWER570
    • D、需要POWER595

    正确答案:B

  • 第16题:

    A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()

    • A、Active Energy Manager
    • B、PowerVM Energy Manager
    • C、Power and Energy Manager
    • D、Thermal and Energy Manager

    正确答案:A

  • 第17题:

    客户会在什么样的环境下用POWER Systems服务器?或者说什么样的客户需要POWER Systems服务器?()

    • A、对性能要求高
    • B、对稳定性要求高
    • C、作数据库服务器
    • D、作前端web服务器

    正确答案:A,B,C,D

  • 第18题:

    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()

    • A、A desk, as it not rack mountable
    • B、Ethernet connections to the POWER5 systems
    • C、Serial connections to the POWER5 systems
    • D、USB connections for the keyboard and mouse

    正确答案:B

  • 第19题:

    关于POWER Systems和x系列服务器,下列陈述错误的是()

    • A、POWER Systems是UNIX小型机
    • B、X系列是X86服务器
    • C、X系列可以运行linux操作系统
    • D、POWER Systems不可以运行linux操作系统

    正确答案:D

  • 第20题:

    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()

    • A、Each Linux application can run in a Workload Partition, reducing the management efforts.
    • B、Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.
    • C、Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.
    • D、Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.

    正确答案:D

  • 第21题:

    单选题
    A customer wants to install a pSeries system into an OEM rack.  What critical information is provided in the Site and Hardware Planning Information manual?()
    A

    System dimensions and weight, system power and cooling requirements, and list of supported OEM racks

    B

    System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks

    C

    System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks

    D

    System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()
    A

    IBM CPW

    B

    IBM rPerf

    C

    SPECint_rate2006

    D

    IDEAS International RPE2


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    与SUN V490相比,哪一款POWER Systems服务器性能即可胜出?()
    A

    POWER520即可

    B

    需要POWER550

    C

    需要POWER570

    D

    需要POWER595


    正确答案: D
    解析: 暂无解析

  • 第24题:

    单选题
    In comparison to electric power,hydraulic power for jacking systems has the advantage of().
    A

    better control capabilities

    B

    less maintenance and repair

    C

    fewer personnel needed during jacking

    D

    less preload needed


    正确答案: C
    解析: 暂无解析