A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
第1题:
A company needs additional storage for a block I/O based database application. The application has low I/O bandwidth requirements across the campus. The customer has a TCP/IP infrastructure and is interested in low-cost products that are compatible with its environment. Which technology is most appropriate for this customer?()
第2题:
A customer has a failing HBA adapter and needs to identify the location of the adapter. Which of the following AIX commands should the specialist recommend the customer review?()
第3题:
A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()
第4题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第5题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第6题:
Which of the following customer environments is addressed by IBM System Storage N series gateways?()
第7题:
A customer has a WebTrade application that initially uses the embedded LDAP to authenticate users. To enhance security, the customer decides to use OAM to authenticate some of the users against an external LDAP store. For this to work, a customer configured an OAMAuthenticator, but was not sure what to select for the Control Flag. What Control Flag should the customer choose?()
第8题:
Contact the IBM FTSS to replace the drive
Contact the IBM CSR or SSR to replace the drive
Order a replacement drive
Contact IBM Service
第9题:
a customer with CIFS, NFS and GPFS requirements
a customer wanting to natively implement Easy Tier
a customer who has large block sequential write requirements
a customer who needs to consolidate multiple storage controllers under one managementinterface
第10题:
OPTIONAL
REQUISITE
REQUIRED
SUFFICIENT
MANDATORY
第11题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第12题:
edit
systeminfo
gpedit.msc
dxdiag
第13题:
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()
第14题:
Machine policy templates can be assigned based on certain attributes of a machine. A customer organizes their machines based on the following requirements: The machines are all placed in specific Organizational Units in the Active Directory. The customer has Citrix Servers, and they have a specific naming convention meant only for their Citrix Servers. The customer has DHCP enabled for all the client machines. The customer has made it clear that they should not need to change anything in the existing infrastructure. Given these requirements, which single assignment attribute would be chosen for assigning machine policy templates?()
第15题:
What is the main reason for doing a Solutions Assurance Review with the customer? ()
第16题:
A solution provider has proposed a pSeries solution to a new customer. The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation. The solution provider has not been able to get a clear understanding as to how the customer will backup the system. What would be the most appropriate action to address the risks with this solution?()
第17题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第18题:
An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()
第19题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第20题:
To revalidate the total solution
To overcome objections to the solution
To review the pricing with the customer
To ensure the customer has the correct applications
第21题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第22题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager
第23题:
the customer standing right in front of them.
the customer who owes the company the most money.
the customer calling on the phone.
the customer they have an appointment with in an hour.
第24题:
satisfied
satisfaction
satisfying
satisfactory