A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solutio

题目

A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solution?()

  • A、RDAC
  • B、MPIO
  • C、SSPC
  • D、SDDPCM

相似考题
参考答案和解析
正确答案:B
更多“A customer plans to install ten”相关问题
  • 第1题:

    A customer has a wireless router installed in their home office. The customer is having issues with signal strength at the opposite end of the house. Which of the following is the BEST option to increase the signal strength?()

    • A、Install a high gain antenna focused towards the office wall.
    • B、Run CAT5e cable to all of the rooms that have poor signal strength.
    • C、Install a wireless repeater at the far end of the house.
    • D、Install a second wired router in the far end of the house.

    正确答案:C

  • 第2题:

    An existing IBM customer has some iSeries servers in their environment.  The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications.  The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms.  Which of the following will accomplish this?()

    • A、Share the data over the Ethernet LAN.
    • B、Install the IXA Adapter in the iSeries server.
    • C、Install the IXA Adapter in the xSeries server.
    • D、Attach both servers to an IXS switch.

    正确答案:C

  • 第3题:

    A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()

    • A、What are the plans for Disaster Recovery? 
    • B、What are the plans for data migration? 
    • C、Would iSCSI meet your needs? 
    • D、How much space is available in the current storage systems?

    正确答案:B

  • 第4题:

    A customer needs to deploy ten dual processor Xeon servers.  Six servers will be running Linux and Apache, and the other four will be Citrix presentation servers.  The customer’s main concerns are the rack space and the option to have SATA drives.  The maximum memory required is 8GB.  Which of the following options will provide the best price and performance?()

    • A、Ten x306’s with internal SATA drives
    • B、Five x346’s with internal SATA drives and VMWare ESX Server
    • C、Five x366’s partitioned into two VMs each with VMWare ESX Server
    • D、Ten x336’s with internal SATA drives

    正确答案:D

  • 第5题:

    A customer plans to deploy Open Fabric Manager (OFM). Which vendors meet this need of the following?()

    • A、Brocade
    • B、Blade Network Technology (BNT)
    • C、Cisco
    • D、Juniper

    正确答案:B

  • 第6题:

    A customer with an IBM Power System running AIX is using an IBM System Storage DS8100 inLocation A, and an IBM System Storage DS5100 in Location B. The distance between Location Aand Location B is 25 kilometers. The customer wants a redundant copy of the data inLocation Bfor disaster recovery. Which of the following solutions will best satisfy this requirement?()

    • A、install FlashCopy on the DS8100 
    • B、install SAN Volume Controllers with FlashCopy
    • C、install SAN Volume Controllers with Metro Mirror 
    • D、install Global Mirror on the DS8100 and Enhanced Remote Mirror on the DS5100 

    正确答案:C

  • 第7题:

    A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()

    • A、the production environment does not require an outage
    • B、the production environment requires an outage to install the SVC
    • C、the production environment requires an outage to install the DS8700
    • D、the production environment requires an outage to remove the EMC systems

    正确答案:B

  • 第8题:

    A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()

    • A、Preservation Install
    • B、Retention Install
    • C、Overwrite Install
    • D、Migration Install

    正确答案:D

  • 第9题:

    单选题
    A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()
    A

    Did you add the redundant AMM?

    B

    What is the processor wattage?

    C

    Is the AMM firmware up to date?

    D

    Is the HS22V memory configuration optimized?


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()
    A

     Pre-sale 

    B

     Post-sale 

    C

     Pre-install 

    D

     Post-install


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has bought an IBM System Storage DS8700 and wants to attach ten SuSE Linux Enterprise Server hosts to the DS8700 with multiple paths.  What is the Multipathing Driver the customer needs()
    A

    PowerPath

    B

    Subsystem Device Driver Device Specific Module

    C

    Subsystem Device Driver Path Control Module

    D

    DeviceMapper Multipath


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer requires a shock resistant mass storage device in their PC. Which of the following drives should the technician install?()
    A

    Hard disk

    B

    Solid state

    C

    Floppy

    D

    Tape


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.  Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()

    • A、Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.
    • B、Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.
    • C、Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.
    • D、Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.

    正确答案:D

  • 第14题:

    A customer plans to deploy Open Fabric Manager (OFM). Which vendors would you recommend?()

    • A、Brocade 
    • B、Blade Network Technology (BNT) 
    • C、Cisco 
    • D、Juniper

    正确答案:B

  • 第15题:

    A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()

    • A、add one SVC
    • B、install one DS8700
    • C、install one DS8800
    • D、install one XIV system

    正确答案:C

  • 第16题:

    A customer has two DS8000 systems in their environment. One DS8000 has FlashCopy licensed while the other does not. The customer wishes to license FlashCopy on the second DS8000.  Which of the following describes the TDA requirement in this situation()

    • A、a pre-sale TDA is mandatory
    • B、a pre-install TDA is mandatory
    • C、a pre-install TDA is not mandatory since it is not FirstIn Customer Location (FICL)
    • D、both pre-sale and pre-install TDAs are mandatory

    正确答案:C

  • 第17题:

    A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()

    • A、 Pre-sale 
    • B、 Post-sale 
    • C、 Pre-install 
    • D、 Post-install

    正确答案:C

  • 第18题:

    A customer plans to implement a network of x3690 X5 servers. The customer has very limited funds. Which of the following tools would allow installation of firmware updates?()

    • A、ToolsCenter
    • B、VMware vSphere 4
    • C、Tivoli Provisioning Manager (TPM)
    • D、Tivoli Storage Manager (TSM)

    正确答案:A

  • 第19题:

    A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  They are also concerned about the under-utilization of their IT resources.  What should the pSeries technical specialist recommend to address this challenge?()

    • A、Install a p615 per application.
    • B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
    • C、Install the appropriate solution once the requirements are understood.
    • D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.

    正确答案:D

  • 第20题:

    During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()

    • A、The IBM CE will install the card
    • B、The card will not be supported by IBM
    • C、The AIX device driver should work fine
    • D、The customer is correct, there should be no problem

    正确答案:B

  • 第21题:

    单选题
    During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()
    A

    The IBM CE will install the card

    B

    The card will not be supported by IBM

    C

    The AIX device driver should work fine

    D

    The customer is correct, there should be no problem


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()
    A

    the production environment does not require an outage

    B

    the production environment requires an outage to install the SVC

    C

    the production environment requires an outage to install the DS8700

    D

    the production environment requires an outage to remove the EMC systems


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server.  Which of the following provide post install diagnostics()
    A

    SPOT

    B

    lpp_source

    C

    mksysb

    D

    install CD


    正确答案: A