A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()A、All defined VLANs are allowed on the trunk by default.B、Each VLAN, or VLAN range, that is specified wit

题目

A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()

  • A、All defined VLANs are allowed on the trunk by default.
  • B、Each VLAN, or VLAN range, that is specified with the switchport mode command.
  • C、Each VLAN, or VLAN range, that is specified with the vtp domain command.
  • D、Each VLAN, or VLAN range, that is specified with the vlan database command.

相似考题
更多“A new switch is installed into a”相关问题
  • 第1题:

    A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()

    A. All defined VLANs are allowed on the trunk by default.

    B. Each VLAN, or VLAN range, that is specified with the switchport mode command.

    C. Each VLAN, or VLAN range, that is specified with the vtp domain command.

    D. Each VLAN, or VLAN range, that is specified with the vlan database command.


    参考答案:C

  • 第2题:

    What are two characteristics of a managed Cisco Small Business Switch when recommending it over an unmanaged switch? ()

    • A、 end-user installed and supported
    • B、 VLAN support
    • C、 low initial cost
    • D、 desktop installation
    • E、 web-controlled GUI

    正确答案:B,E

  • 第3题:

    You work as a network Technician. A new workstation has consistently been unable to obtain anIP address from the DHCP server when the workstation boots. Older workstations function normally, and the new workstation obtains an address when manually forced to renew its address.  What should be configured on the switch to allow the workstation to obtain an IP address at boot?()

    • A、UplinkFast on the switch port connected to the server
    • B、BackboneFast on the switch port connected to the server
    • C、PortFast on the switch port connected to the workstation
    • D、trunking on the switch

    正确答案:C

  • 第4题:

    You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()

    • A、 SVI interface
    • B、 Access port
    • C、 EtherChannel port channel
    • D、 Loopback interface
    • E、 Routed port
    • F、 BVI interface

    正确答案:A,C,E

  • 第5题:

    A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network. Which of the conditions below have to be met in order for this to occur?()

    • A、The switch that will share the VLAN information must be in the VTP Server mode.
    • B、The switches must be in the same VTP domain.
    • C、The switch that will share the VLAN information must be configured as the root bridge.
    • D、The switches must be configured to use the same VTP version.
    • E、The switches must be configured to use the same STP version.
    • F、The switches must be configured to use the same type of ID tagging.
    • G、The switches must be connected over VLAN trunks.

    正确答案:A,B,F

  • 第6题:

    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()

    • A、The new system requires 1 installed processor card for the GX++ bus adapter
    • B、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
    • C、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
    • D、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

    正确答案:B

  • 第7题:

    单选题
    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()
    A

    The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.

    B

    The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.

    C

    The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.

    D

    The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.


    正确答案: A
    解析: 暂无解析

  • 第8题:

    问答题
    Write a memo in about 50 words. You are a department manager. A new copying machine has been installed in your department. Write a memo to tell your staff members to be careful in using the newly-installed photocopier. Your instructions should include the following particulars: ·Ask them not to use it for too long at a time. ·Ask them to switch off the machine after use. ·Encourage them to offer suggestions for the care of the machine.

    正确答案: To:all staff members
    From:department manager.
    Subject:the proper use of photocopier
    Date:18 April,2013
    Recently a new copying machine has been installed in our department.This has brought US much convenience at work.In order to keep US benefiting from this newly installed photocopier,all of us must operate it in a proper way so that the photocopier can function smoothly.
    I would like to suggest the following:
    A.Do not use if for too long at a time since long-time operation without stop is likely to lead to breakdown of the machine.
    B.Remember to switch off the photocopier after use for the reason of safety as well as saving electricity.
    It is our common responsibility to keep the photocopier in a good condition.Any suggestion for the good care of the machine is welcome.
    解析: 暂无解析

  • 第9题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMc  

    B

    Asynchronous adapters on the new HMc

    C

    The two 570 servers are directly connected to the new HMc  

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A technician has just installed a new power supply into a desktop computer and now the computer will not turn on. Which of the following is the MOST likely cause?()
    A

    The voltage selector switch on the power supply is set incorrectly.

    B

    The 3.3v power line is connected to the wrong input on the motherboard.

    C

    The new power supply voltage rating is too high.

    D

    The 12v power cord is installed incorrectly.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMC

    B

    Asynchronous adapters on the new HMC

    C

    The two 570 servers are directly connected to the new HMC

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


    正确答案: B
    解析: 暂无解析

  • 第12题:

    多选题
    What are two characteristics of a managed Cisco Small Business Switch when recommending it over an unmanaged switch? ()
    A

    end-user installed and supported

    B

    VLAN support

    C

    low initial cost

    D

    desktop installation

    E

    web-controlled GUI


    正确答案: B,E
    解析: 暂无解析

  • 第13题:

    Have you installed the new software?()

    • A、Installed. 
    • B、Uninstalled.
    • C、No, not yet. 
    • D、Yes, not yet.

    正确答案:C

  • 第14题:

    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()

    • A、The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
    • B、The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
    • C、The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
    • D、The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

    正确答案:B

  • 第15题:

    A technician has lost a necessary jumper for a new hard drive that must be installed immediately.Which of the following is the BEST solution?()

    • A、Use a jumper from the motherboard where the new drive is going to be installed.
    • B、Use a jumper from a hard drive that is no longer functioning.
    • C、Contact the manufacturer of the new hard drive and have a replacement jumper shipped immediately.
    • D、The new hard drive must be replaced

    正确答案:B

  • 第16题:

    Before inserting a new switch in the network,the network administrator checks that the VTP domain name is correct,the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks,erases existing VLANs,and connects the switch to the network. Following that procedure,there is no connectivity in the network. What is a possible cause of this problem?()

    • A、Because the configuration revision of the new switches is lower than the rest of the network, it can change the VLAN database of the other switches.
    • B、As a VTP server, the new switch deleted all VLANs of the network.
    • C、Erasing VLANs increases the VTP configuration revision.
    • D、Since the configuration revision of the network is higher than the new switch, the VLAN database was automatically synchronized.

    正确答案:C

  • 第17题:

    A technician has just installed a new power supply into a desktop computer and now the computer will not turn on. Which of the following is the MOST likely cause?()

    • A、The voltage selector switch on the power supply is set incorrectly.
    • B、The 3.3v power line is connected to the wrong input on the motherboard.
    • C、The new power supply voltage rating is too high.
    • D、The 12v power cord is installed incorrectly.

    正确答案:A

  • 第18题:

    单选题
    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
    A

    The new system requires 1 installed processor card for the GX++ bus adapter

    B

    The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter

    C

    The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter

    D

    The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    You are planning a new VLAN-based network solution.  What is one item you should consider when creating your implementation plan as it concerns VLANs?()
    A

    generic router and switch configuration parameters

    B

    end-to-end test plan after all components have been installed and  configured

    C

    administrator assignments

    D

    rollback plan


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    An administrator wants to rackmount a new server.  Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed.  Which of the following items should the administrator FIRST verify before installing the server?()
    A

    HBA is compatible with the SAN fiber switch.

    B

    Update the newly installed server with the latest KVM drivers.

    C

    The UPS will continue to perform as expected with the additional load.

    D

    Verify the server NIC is compatible with the NAS.


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A technician has lost a necessary jumper for a new hard drive that must be installed immediately.Which of the following is the BEST solution?()
    A

    Use a jumper from the motherboard where the new drive is going to be installed.

    B

    Use a jumper from a hard drive that is no longer functioning.

    C

    Contact the manufacturer of the new hard drive and have a replacement jumper shipped immediately.

    D

    The new hard drive must be replaced


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A network technician is installing a new managed 10/100 Mbps switch on the network. The network has an older printer with a 10Mbps network adapter that will be moved to the new switch. Which of the following settings on the switch will need to be configured to support the printer?()
    A

    MAC filtering

    B

    IP address

    C

    PoE

    D

    Port speed


    正确答案: D
    解析: 暂无解析

  • 第23题:

    多选题
    You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()
    A

    SVI interface

    B

    Access port

    C

    EtherChannel port channel

    D

    Loopback interface

    E

    Routed port

    F

    BVI interface


    正确答案: B,F
    解析: 暂无解析