更多“When the derrick is lowered, the”相关问题
  • 第1题:

    When the derrick is lowered, the guys must be ().

    • A、slacked off
    • B、taken in
    • C、send away
    • D、send out

    正确答案:B

  • 第2题:

    The ()(吊杆托架) supports the derrick.

    • A、derrick boom rest
    • B、derrick head
    • C、derrick mast
    • D、derrick guy

    正确答案:A

  • 第3题:

    Could you show me ()to operate the derrick?

    • A、which
    • B、what
    • C、how
    • D、when

    正确答案:C

  • 第4题:

    日落降国旗。()

    • A、The ensign should be hoisted when the sun rises.
    • B、The ensign should be lowered when the sun rises.
    • C、The ensign should be hoisted when the sun sets.
    • D、The ensign should be lowered when the sun sets.

    正确答案:D

  • 第5题:

    单选题
    在船上应当日出时升起国旗。()
    A

    On board national flags should be hoisted when the sun sets.

    B

    On board national flags should be hoisted when the sun rises.

    C

    On board national flags should be lowered when the ship is in port.

    D

    On board national flags should be hoisted flag when loading and discharging


    正确答案: A
    解析: 暂无解析

  • 第6题:

    单选题
    When the derrick is topped, the guy must be ()(放松).
    A

    slacked off

    B

    sent away

    C

    sent out

    D

    taken in


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    The boom stops on a pedestal crane prevent the boom from().
    A

    being raised too high

    B

    swinging at sea

    C

    overloading when not in use

    D

    being lowered too low


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    When the derrick is stopped, the guy must be().
    A

    take in

    B

    slacked off

    C

    stowed

    D

    taken


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    The boom stops are installed on an offshore crane to().
    A

    prevent the boom from being raised too high

    B

    prevent the boom from swinging

    C

    support the boom when not in use

    D

    prevent the boom from being lowered


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    Frapping lines().
    A

    secure the lifeboat in the davits when in the stowed position

    B

    bring the lifeboat close alongside the rail in the embarkation position

    C

    give the occupants a safety line when the boat is being lowered from the embarkation level

    D

    reduce the swinging of the lifeboat at the embarkation level


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    When preparing an engine for water temperature()
    A

    should be kept at a proper level by a cooler

    B

    should be raised to about 80℃ by a heater

    C

    should be raised gradually

    D

    should be lowered to about 60℃


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    Be careful when you ()the derrick.
    A

    operated

    B

    operate

    C

    operating

    D

    operator


    正确答案: A
    解析: 暂无解析

  • 第13题:

    During the voyage, the derrick should be stowed ().

    • A、fore
    • B、aft
    • C、fore and aft
    • D、lowered

    正确答案:C

  • 第14题:

    在船上应当日出时升起国旗。()

    • A、On board national flags should be hoisted when the sun sets.
    • B、On board national flags should be hoisted when the sun rises.
    • C、On board national flags should be lowered when the ship is in port.
    • D、On board national flags should be hoisted flag when loading and discharging

    正确答案:B

  • 第15题:

    吊杆停用时,稳索必须要收起来。()

    • A、When the derrick is stopped, the guy must be stowed.
    • B、When the derrick is stopped, the guy must be topped.
    • C、When the derrick is stopped, the guy must be lowered.
    • D、When the guy is stopped, the derrick must be stowed.

    正确答案:A

  • 第16题:

    单选题
    When launching a lifeboat,the tricing pennants should be released().
    A

    before the boat is lowered from the stowed position

    B

    as the boat-fall blocks break clear of the davit head

    C

    before the boat is lowered from the embarkation level

    D

    after the boat is released into the water


    正确答案: A
    解析: 暂无解析

  • 第17题:

    单选题
    The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().
    A

    string

    B

    stand

    C

    joint

    D

    standpipe


    正确答案: D
    解析: 暂无解析

  • 第18题:

    单选题
    When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().
    A

    dock

    B

    hold

    C

    pedestal

    D

    machinery space


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    When the derrick changes its ()(角度), its lifting capacity changes correspondingly.
    A

    angel

    B

    length

    C

    height

    D

    angle


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    When the derrick is stopped, the guy must be ()(收好).
    A

    taken in

    B

    slacked off

    C

    adjusted

    D

    stowed


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    Frapping lines are fitted to lifeboat davits to().
    A

    secure the lifeboat in the davits when in the stowed position

    B

    bring the lifeboat close along the rail in the embarkation position

    C

    give the occupants a safety line when the boat is being lowered from the embarkation level

    D

    reduce the swinging of the lifeboat at the embarkation level


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    日落降国旗。()
    A

    The ensign should be hoisted when the sun rises.

    B

    The ensign should be lowered when the sun rises.

    C

    The ensign should be hoisted when the sun sets.

    D

    The ensign should be lowered when the sun sets.


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    When launching a lifeboat in the rough sea, the davit gears should be released().
    A

    before the boat is lowered from the stowed position

    B

    as the boat fall blocks break clear of the davit head

    C

    before the boat is lowered from the embarkation level

    D

    after the boat is released into the water


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    吊杆停用时,稳索必须要收起来。()
    A

    When the derrick is stopped, the guy must be stowed.

    B

    When the derrick is stopped, the guy must be topped.

    C

    When the derrick is stopped, the guy must be lowered.

    D

    When the guy is stopped, the derrick must be stowed.


    正确答案: A
    解析: 暂无解析