()(沥青) is used in bilges and peak tanks.
第1题:
Before starting a gasoline engine on a motorboat,you should make sure for safety that ______.
A.The gasoline tank is full
B.The bilges,cabins,etc.are thoroughly ventilated
C.You have fresh water on board
D.Each of the above is followed
第2题:
Cement wash is used for fresh water tanks and double bottom tanks. ()
第3题:
Bitumen is used for bilges and peak tanks.()
第4题:
bunker fuel for use aboard ship
lubricating oil for use aboard ship
coconut oil carried in tank vessels
oily water from a ships bilges
第5题:
keep them dry when the bilges are full of water
keep them cool when the vessel is underway
make them more accessible for repairs
prevent accidental ignition of any gasoline vapors that may have accumulated in the bilges
第6题:
第7题:
check the flame arrester
check the fuel tank
check the battery
ventilate the bilges
第8题:
on the outgoing tide
overboard after dark
overboard through an oily water separator
anytime in an emergency, i-emain engine lube oil failure
第9题:
Cement wash
Bitumen
Paint
Varnish
第10题:
沥青用于淡水舱和双层底舱。
水泥浆用于淡水舱和双层底舱。
水泥浆用于污水舱和双层底舱。
沥青用于污水舱和双层底舱。
第11题:
Fixed CO2,semi-portable CO2, then hand portable CO2
Semi-portable CO2, fixedCO2, then hand portable CO2
Hand portable, semi-portable CO2, then as a last resort the fixed CO2 system
Hand portable, fixed CO2, then as a last resort the semi-portable CO2
第12题:
沥青用于污水舱和尖舱。
沥青用于淡水舱和尖舱。
水泥浆用于污水舱和尖舱。
水泥浆用于淡水舱和尖舱。
第13题:
临床检查怀疑肝癌时的影像学检查顺序为()
第14题:
沥青用于污水舱和尖舱。()
第15题:
the gasoline tank is full
the bilges,cabins,etc. are thoroughly ventilated
you have fresh water on board
Each of the above is followed
第16题:
Bitumen is used in bilges and peak tanks.
Paint is used in bilges and peak tanks.
Bitumen is used in bilges and double bottom tanks
. Varnish is used in bilges and peak tanks.
第17题:
draped over the fantail to dry out
drained over the side and washed out
drained into the bilges and washed out
drained into buckets or fuel tanks
第18题:
ballast tanks
sludge tanks
machinery space bilges
cargo hold bilges
第19题:
the circuit breaker
for leaks in the suction piping
relief valve is not properly seated
the suction strainer
第20题:
Bitumen
Paint
Cement wash
Varnish
第21题:
对
错
第22题:
to inject cleaning additives when the bilges are extremely dirty
when the main condenser becomes fouled, in order to provide additional cooling water circulation
to connect the rose box to the independent bilge suction
if the bilges become flooded and they can not be emptied by any other means
第23题:
超声-MRI-CT
MRI-CT-超声
超声-PEA-MRI
超声-CT-MRI
超声-DSA-CT
第24题:
Cargo tank ballast
Segregated ballast
Engine room bilges
Cargo pump room bilges