第1题:
conservative means being opposed to great or sudden change.()
第2题:
A、carries out
B、carried out
C、was carried out
D、has carried out
第3题:
A.Overhaul repair is a major repair.
B.Overhaul repair is carried out in a dock.
C.Overhaul repair is carried out once a year.
D.Overhaul repair is done for the purpose of rating.
第4题:
______ include goods,wares,merchandise,and articles of every kind whatsoever except live animals and cargo which by the contract of carriage is stated as being carried on deck and is so carried.
A.Goods
B.Things
C.Items
D.Articles
第5题:
第6题:
The()into the fire accident was carried out by two policemen.
Aquestion
Bdoubt
Cinvestigation
Dinformation
第7题:
to be carried out
carry out
be carried out
will carry out
第8题:
bulkheads
stringers
frames and beam brackets
deck longitudinals
第9题:
take part
watch
go to their quarters
stay out of the way and do what they want
第10题:
A
B
C
D
第11题:
should be correctly carried out
should correctly be taken place
should carded with care
must to carry out with great care
第12题:
Diagnostic assessment is a kind of test carried out after a teaching activity.
Formative assessment should be student-oriented.
Summative assessment is often carried out at the end ofa term,
Portfolios, daily reports, and delivering speeches are all formative assessment
第13题:
对话理解
听力原文:M: The paper money required little effort to carry. If you need large amount of money, you can use a check or credit card to make the payment.
W: This nature of money is called portability and it provides convenience in settling transactions.
Q: What does the word portability mean?
(11)
A.It means being convenient to be carried.
B.It means being readily to be divided.
C.It means being easily identified.
D.It means being carried in a big basket.
第14题:
This program is our way of saying THANK YOU ()such a great patient
A、for being
B、to be
C、upon being
D、to being
第15题:
Preventive maintenance______.
A.should not be carried out during the watches
B.can only be carried out in port
C.is a kind of maintenances carried out prior to the occurrence
D.is a kind of maintenances carried out after the occurrence
第16题:
All portable fire extinguishers must be capable of being ______.
A.carried by hand to a fire
B.carried or rolled to a fire
C.recharged in the field
D.used on class “B” fire
第17题:
第18题:
对
错
第19题:
keep the air from being carried into the engine
keep the moisture from being condensed
keep the danger from being carded into the engine
take away the condensate from the air
第20题:
should be correctly carried out
should correctly be taken place
should carried with care
must to carry out with great care
第21题:
periodically
quarterly
monthly
yearly
第22题:
should not be carried out during the watches
can only be carried out in port
is a kind of maintenances carried out prior to the occurrence
is a kind of maintenances carried out after the occurrence
第23题:
slowly carried away
carried out with a period of delay
promptly carried out
paid by the captain