The _____ specification delineates specific measurable capabilities or parameters for which a product can be tested as part of the acceptance procedure.
A Performance
B Functional
C Technical
D Base Line
E None of the above.
第1题:
The _____ specification delineates specific end use capabilities which can be tested in the acceptance procedure.
A performance
B functional
C technical
D base line
E operational
第2题:
57 Which of the following types of specifications gives measurable capabilities of the product:
A. functional specifications
B. performance specifications
C. conformance specifications
D. technical specifications
E. process capability specification
第3题:
166 The _____ specification delineates specific measurable capabilities or parameters for which a product can be tested as part of the acceptance procedure.
A. Performance
B. Functional
C. Technical
D. Base Line
E. None of the above
第4题:
149 A program can best be described as:
A. A grouping of related activities which last two years or more
B. The first major subdivision of a project
C. A grouping of projects, similar in nature, which support a product or product line and have no definable end point
D. A product line
E. Another name for a project
第5题:
A.milestone
B.deliverable
C.etc
D.BAC
该题的关键词为"work product",其语句结构为" ____(主语)is(谓语)a measurable,verifiable work product",含义为"什么是可度量的、可验证的工作产品",排除其他选项后容易选出deliverable(交付物)。
第6题:
● A program can best be described as:
A A grouping of related activities which last two years or more
B The first major subdivision of a project
C A grouping of projects, similar in nature, which support a product or product line and have no definable end point
D A product line
E Another name for a project
第7题:
A.security
B.functional
C.user
D.system
第8题:
Project Quality Management must address the management of the project and the(72)of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
A.performance
B.process
C.product
D.object
第9题:
What is not a difference between VPN tunnel authentication and per-user authentication?()
第10题:
On which product media can the IVM install code be located?()
第11题:
Which statement most accurately describes the implementation of a SQL Access Advisor recommendation?()
第12题:
VPN tunnel authentication is part of the IKE specification.
VPN tunnel authentication does not control which end user can use the IPSec SA (VPN tunnel).
User authentication is used to control access for a specific user ID, and can be used with or without a VPN tunnel for network access authorization.
802.1X with EAP-TLS (X.509 certificates) can be used to authenticate an IPSec tunnel.
第13题:
Which of the following types of specifications gives measurable capabilities of the product:
A functional specifications
B performance specifications
C conformance specifications
D technical specifications
E process capability specification
第14题:
143 Quality attributes
A. are used to determine how effectively the organization accomplishes its goals
B. can be objective or subjective in nature
C. are specific quality characteristics for which a product is designed, built, and tested.
D. A and B.
E. B and C
第15题:
85 The _____ specification delineates specific end use capabilities which can be tested in the acceptance procedure.
A. performance
B. functional
C. technical
D. base line
E. operational
第16题:
29 All of the following statements about control charts are true except:
A. Control charts can be used to establish as well as maintain process control
B. control charts are used to detemine acceptance limits when no limits are stipulated by the product specification; otherwise, one should use the limits dictated by the specification.
C. all data points outside the control chart limits are variations explained by assignable causes.
D. A and B.
E. B and C
第17题:
● Which of the following can be tracked using the WBS?
A time
B cost
C performance
D scope
E None of the above.
第18题:
● Project Quality Management must address the management of the projecand the (72) of the project. While Project Quality Management applies to alprojects, regardless of the nature of their product, product quality measureand techniques are specific to the particular type of product produced by thproject.
A.performance
B.process
C.product
D.object
第19题:
A.Base AIX Install media.
B.Base VIOS Install media.
C.AIX Expansion Pack media.
D.VIOS Expansion Pack media.
第20题:
第21题:
() is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototype
第22题:
Which zone type can be specified in a policy?()
第23题:
milestone
deliverable
etc
BAC