Fixed-price contracts place more risk on the _____ .
A owner
B contractor
C seller
D B and C
E All of the above.
第1题:
85 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第2题:
The master has no authority to ________ contracts,such as Charter Party,already made by the owners.
A.alter
B.conduct
C.carry out
D.follow
第3题:
设计不规则元件体时,通过什么操作实现?()
A.Place-->line
B.Place-->wire
C.Place-->Bus
D.Place-->Netlable
第4题:
A.operational
B.managed
C.configuration
D.core
E.instance
第5题:
现代服饰礼仪TOP原则中,O表示场合(occasion),P表示地点(place),T表示()
A.时间(time)
B.领带(tie)
C.柔和(tender)
D.任务(task)
第6题:
原理图设计时,实现连接导线应选择()命令Place/DrawingTools/
A.Place/DrawingTools/Line
B.Place/Wire
C.Wire
D.Line