Amount at Stake is the _____ .A function of planned time/real time project costs.B risk identified in successful project completions.C (Standard Project Deviation + Expected Costs)/6D cost of investment loss + least cost to restore status quo.E inherent r

题目

Amount at Stake is the _____ .

A function of planned time/real time project costs.

B risk identified in successful project completions.

C (Standard Project Deviation + Expected Costs)/6

D cost of investment loss + least cost to restore status quo.

E inherent risk at conception altered by standard project deviations.


相似考题
参考答案和解析
正确答案:D
更多“Amount at Stake is the _____ .Afunction of planned time/real time project costs.Brisk iden ”相关问题
  • 第1题:

    对于time表达式,下列描述正确的是 。

    A.time后的数值越大,频率越快

    B.time后的数值越大,频率越慢

    C.time后的数值越小,频率越快

    D.time后的数值越小,频率越慢


    B

  • 第2题:

    能获取系统当前时间分钟数的方法是以下哪个?

    A.time.strftime(“% m”, time.localtime())

    B.time.strftime(“%M”, time.localtime())

    C.time.strftime(“%t”, time.localtime())

    D.time.strftime(“%T”, time.localtime())


    A

  • 第3题:

    调节播放设置时,我们一般应该选择哪一个播放时间?

    A.Play every frame

    B.Twice

    C.Half

    D.Real-time


    C

  • 第4题:

    在实际的工作计划制定过程中,主要采用三种方法:“基于项目(Project-based)”,“基于流程(Process-based)”和基于时间(Time-based)。


    以上都是

  • 第5题:

    下列选项中,哪个选项表示上一帧所用的时间?

    A.Time.time

    B.Time.fixedDeltaTime

    C.Time.fixedTime

    D.Time.deltaTime


    Time.deltaTime

  • 第6题:

    4、输出如下程序结果,并简要说明程序运行原理: import Netimport random name='小明' time=0 print(name,'上网时间、行为统计:') time += Net.net_play(1.5) time += Net.Watch_videos(2) time += Net.Play_game(3) time += Net.Study(2) Net.times(time)


    44