Range estimating in determining cost risk probabilities requires _____ .
A an amount of financial exposure.
B risks and opportunities ranked in order of bottom line importance
C contingency requirements for expected level of confidence
D probability of cost overrun occurrences
E All of the above.
第1题:
85 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第2题:
● Project tradeoffs are usually made by comparing _____ and constraints.
A Time, cost, and quality
B Time, risk, and quality
C Risk, quality, and manpower availability
D Cost, quality, and technical performance
E Cost, quality, and risk
第3题:
[A]discriminating[B] distinguishing [C] determining [D] diminishing
第4题:
154 Project trade-offs vary between
A. risk, cost and schedule.
B. direct cost, indirect cost, and resource availability
C. quality, schedule and time
D. cost, quality and schedule
E. contract terms, scope and budget
第5题:
_____
[A] thought [B] sight [C] cost [D] risk
本题测试词义搭配。空格相关意思是“一想到他即将要做的,即使他自己也….” “At thought of ”意为“一看到…”; at sight of意为年“一看见”;at cost of 意为“以…的代价”;at risk of意为“冒着….的危险”,所以选A
第6题:
Many new ____ will be opened up at sea in the future for those with a university education.
A.opportunities
B.realities
C.necessities
D.Probabilities