93 The type of contract (payment mechanism) chosen for a project is often a reflection of the degree of risk associated with completing that project. For a firm fixed price contract, payment for risk _____ .A. Is accomplished by paying the actual costs to

题目

93 The type of contract (payment mechanism) chosen for a project is often a reflection of the degree of risk associated with completing that project. For a firm fixed price contract, payment for risk _____ .

A. Is accomplished by paying the actual costs to the contractor.

B. Is accomplished by paying the contractor for his costs plus a fixed fee (profit).

C. Is an undisclosed contingency in the contractor's bid.

D. Is accomplished by paying for the budgeted costs of dealing with risks, as predicted in the project risk assessment.

E. B and C


相似考题
更多“93The type of contract (payment mechanism) chosen for a project is often a reflection of t ”相关问题
  • 第1题:

    If the amount exceeds that figure, payment ()L/C will be required.

    A、at

    B、by

    C、for

    D、in


    参考答案:B

  • 第2题:

    ATM(Asynchronous Transfer Mode)technology combines connection oriented mechanism and ( ) mechanism.

    A.circuit switching
    B.packet switching
    C.message switching
    D.voice switching

    答案:B
    解析:
    ATM(异步传输模式)技术结合了面向连接机制和分组交换机制。

  • 第3题:

    有关赋值运算符重载函数operator =()的返回类型的叙述错误的是()

    A.返回类型为 Type,Type&都可以#B.返回类型为Type,且实现了++操作的重载,则可以如下应用。 Type t1=new Type(), t2; (t2=t1)++; 且后一句相当于 t2=t1; t2++;#C.返回类型为Type,则都可以有如下应用。 Type t1=new Type(), t2, t3; t3=t2=t1;#D.operator =操作重载的返回值可以是Type*
    返回类型为Type,且实现了++操作的重载,则可以如下应用。 Type t1=new Type(), t2; (t2=t1)++; 且后一句相当于 t2=t1; t2++;

  • 第4题:

    ATM (Asynchronous Transfer Mode) technology combines connection oriented mechanism and () mechanism.

    A.circuit switching
    B.packet switching
    C.message switching
    D.voice switching

    答案:B
    解析:
    ATM(异步传输模式)技术联合面向连接机制和()机制。A.电路交换B.包交换C.消息交换D.语音交换

  • 第5题:

    汉译英:“合同;发票”,正确的翻译为( )。
    A. country ; insurance B. contract ; insurance
    C. country; invoico D. contract; invoice


    答案:D
    解析:

  • 第6题:

    每种测试方法都可用 Project 档案完整的记录其设定,并存贮在*.prj。 Project 包含了:()。

    A.Title and Notes

    B.T.A. Setting 和Test Configuration

    C.Files、Graph Preferences

    D.Security


    Title and Notes;T.A. Setting 和 Test Configuration;Files 、 Graph Preferences;Security