91 The Risk of NOT meeting project quality objectives:A. can be minimized through continuous monitoring.B. considered a long term risk.C. will be reflected in the "in-service" life of the product or service.D. B and CE. All of the above
题目
91 The Risk of NOT meeting project quality objectives:
A. can be minimized through continuous monitoring.
B. considered a long term risk.
C. will be reflected in the "in-service" life of the product or service.