129 Inspection processes are considered _____.
A. an investment in the future
B. an effective corrective process
C. a necessary control process
D. insults to production line employees
E. None of the above
第1题:
Quality control is normally performed by the _____ .
A . QA personnel
B . project team
C . operating personnel
D . project management
E . None of the above.
第2题:
_____ is a receipt issued by a carrier for merchandise to be delivered to a party at some destination.
A Proforma invoice
B Inspection certificate
C Packing list
D Bill of lading
E None of the above.
第3题:
41 In the project environment, the individual ultimately responsible for quality control is:
A. The line workers who must strive "to do things right the first time" to avoid quality problems. B. the company's quality control manager who must work with the project members to ensure the quality control program is effective.
C. The head of the production department who retains ultimate quality control responsibility for all the company's projects.
D. The project manager who has ultimate responsibility for the entire project.
E.the customer who must ensure that he is receiving a quality product from the vendor
第4题:
137 Which of the following is not a measure of the profitability of a project or program?
A. Return on original investment.
B. Net present value.
C. Depreciation.
D. Discounted cash flow.
E. None of the above
第5题:
16 Inspection of a complex project according to specifications is accomplished by _____.
A. inspection by attributes.
B cyclical inspection
C. quality conformance inspection
D. original inspection
E. None of the above
第6题:
127 Cost management includes processes that are required to maintain financial control of projects. These processes may include:
A. economic evaluation
B. cost estimating
C. cost forecasting
D. B and C
E. All of the above
第7题:
193 Random cause or system variation is:
A. generally present in every process
B. the responsibility of the inspection of the process
C. the responsibility of the workers of the process
D. the responsibility of management
E. A and D only
第8题:
17 All of the following statements about acceptance sampling are true except:
A. Acceptance sampling plans are beneficial when the cost of inspection is high and the resulting loss of passing nonconforming units is not great.
B. Acceptance sampling plans are necessary when destructive inspections are required.
C. Acceptance sampling plans are never effective at rejecting nonconforming units as 100 percent inspection, even when the inspection process is very tedious.
D. Acceptance sampling plans do not directly control the quality of a series of lots; they instead specify the risk of accepting lots of given quality.
E. Acceptance sampling plans are not very effective for inspecting small lots of custom-made products
第9题:
11 Inspection processes are considered _____.
A. an investment in the future
B. an effective corrective process
C. a necessary control process
D. insults to production line employees
E. None of the above
第10题:
What is the principal function of a financial system? ______.
A.Production and distribution of goods and services
B.Providing a means of payment and facilitating the saving and investment process
C.Directing the flow of goods and services from producer to consumer
D.None of the above
第11题:
If a cargo of kerosene were considered too lean to explode,then it must be ______.
A.Above the explosive range
B.Within the explosive range
C.Below the explosive range
D.None of the above
第12题:
is always effective immediately
includes a statement of each condition requiring corrective action
must be in writing before it takes effect
All of the above
第13题:
Inspection of a complex project according to specifications is accomplished by _____.
A . inspection by attributes.
B . cyclical inspection
C . quality conformance inspection
D . original inspection
E . None of the above.
第14题:
The cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:
A Payment authorization
B Bid cost considerations
C Release payment
D Back charge
E None of the above.
第15题:
114 The cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:
A. Payment authorization
B. Bid cost considerations
C. Release payment
D. Back charge
E. None of the above
第16题:
199 _____ is a receipt issued by a carrier for merchandise to be delivered to a party at some destination. A. Proforma invoice
B. Inspection certificate
C. Packing list
D. Bill of lading
E. None of the above
第17题:
47 Quality control is normally performed by the _____ .
A. QA personnel
B. project team
C. operating personnel
D. project management
E. None of the above
第18题:
183 Configuration (baseline) control monitors performance against the
A. scope baseline
B. original schedule
C. original budget
D. All of the above.
E. None of the above
第19题:
129 Quality control is normally performed by the _____ .
A. QA personnel
B. project team
C. operating personnel
D. project management
E. None of the above
第20题:
145 The initial document that formally recognizes the existence of a project is the _____ .
A. Scope baseline
B. Management plan
C. Project charter
D. Configuration control report
E. None of the above
第21题:
● Configuration (baseline) control monitors performance against the
A scope baseline
B original schedule
C original budget
D All of the above.
E None of the above.
第22题:
Which one of the following commands would you enter to terminate a VTY line session?
A. close
B. disable
C. disconnect
D. suspend
E. exit
F. None of the above
第23题:
SOLAS Certificate is issued
Load Line Certificate is renewed
classification society approval is issued
permanent Certificate of Inspection is issued